Laserfiche WebLink
Chapter 4: Waimea Town Plan <br /> Figure 4.2 Housing <br /> Number of Housing Units Built in Waimea 1930-2000;2003-2006" <br /> 1000 <br /> �+ 870 <br /> 900 <br /> 800 <br /> M 700 <br /> m 600 545 548 <br /> 0 500 <br /> x336 <br /> c 400 <br /> 300 <br /> 97 E 200 <br /> Z 100 <br /> 0 <br /> 1939 or 1940 to 1960 to 1970 to 1980 to 1990 to 2003 to <br /> earlier 1959 1969 1979 1989 2000 2006' <br /> From 1970-2000 almost 1,400 housing units were built in Waimea. Currently, there are approximately <br /> 2,900 housing units in Waimea. * 2003-2006 Housing units are an estimate based upon the number of <br /> Building permits that were issued during those years. <br /> Table 4.2 New Residential Building Permits in Waimea (2003-2006) <br /> Waimea"Dry Side" Waimea"Wet Side" Waimea South of <br /> Mamalahoa Hw . <br /> Year Number of Number of Number of Number Number of Number <br /> Permits Units Permits of Units Permits of Units <br /> 2003 4 4 57 81 58 58 <br /> 2004 7 6 66 65 12 12 <br /> 2005 11 11 65 63 46 45 <br /> 2006 3 3 29 29 38 38 <br /> Total 25 24 217 238 144 153 <br /> Source: The HI Co. Planning Department <br /> There were a total of 396 residential building permits issued by the County for the Waimea area for <br /> 415 residential units from 2003-2006. The large majority of permits were issued for the "Wet Side" <br /> or east side of Waimea Town, while relatively few building permits were issued for the "Dry Side" <br /> or west side of Waimea Town. <br /> Current and Future Road Projects <br /> Parker Ranch Connector Road is designed to start from Mamalahoa Highway near the Parker Ranch <br /> rodeo grounds, then run just south of Parker Ranch's Luala'i subdivision and shopping center, and <br /> reconnect Mamalahoa Highway at or near Kamamalu Street, near the Waimea Civic Center. The <br /> connector road project will include a linear park and bikeway and a pedestrian pathway. The <br /> project is estimated to cost approximately $13.1 million, and construction for part of the project is <br /> to begin in the near future .The timetable for completion of this connector road is as follows: <br /> South Kohala CDP November 2008 <br /> FINAL Page 60 <br />