My WebLink
|
Help
|
About
|
Sign Out
Home
2010-08-27 TPD USE-PROCESSTIME
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2010
>
2010-08-27 TPD USE-PROCESSTIME
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2011 9:34:48 AM
Creation date
6/14/2011 9:34:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LEEWARD PLANNING COMMISSION <br />COUNTY OF HAWAI‘I <br />HEARING TRANSCRIPT <br />AUGUST 27, 2010 <br />PLANNING DIRECTOR INITIATED AMENDMENT <br />A regularly advertised hearing on the <br />TO CHAPTER 25, PROCESSING TIME FOR USE PERMIT APPLICATION <br />was called <br />to order at 10:37 a.m. in the King Kamehameha's Kona Beach Hotel, Ballroom I, 75-5660 Palani <br />Road, Kailua-Kona, Hawai‘i, with Chairman Frederic Housel presiding. <br />COMMISSIONERS PRESENT: Frederic Housel, Brandi Beaudet, Lani Bowman, Geraldine <br />Giffin, Thomas Hickcox, Wayne Iokepa and Richard Nelson <br />STAFF PRESENT: Brandon Gonzalez (Deputy Corporation Counsel), BJ Leithead Todd <br />(Planning Director), Margaret Masunaga (Deputy Planning Director), Daryn Arai (Planning <br />Program Manager), Jeff Darrow (Staff Planner) and Maija Cottle (Staff Planner) <br />And approximately 80 people from the public in attendance. <br />INITIATOR: PLANNING DIRECTOR <br />Amendment to Chapter 25 (Zoning Code), Hawai‘i County Code 1983 (2005 Edition, as <br />amended) relating to Processing Time for a Use Permit Application. <br />HOUSEL: We’ll proceed with Item No. 4 on our agenda. And the initiator is the Planning <br />Director. This is an amendment to Chapter 25, the Zoning Code, Hawai‘i County Code 1983 <br />(2005 Edition, as amended) relating to the processing time for use permit application. Staff? <br />ARAI: Thank you. The proposed bill before you seeks to amend Section 25-2-63 of the Zoning <br />Code regarding procedures for use permit, which currently requires that the public hearing on a <br />use permit application commence no later than 60 days after its acceptance by the Planning <br />Director. That compressed time frame has caused difficulties in scheduling a use permit <br />application before the Commission, along with consideration for publication requirements in a <br />newspaper of general circulation, as well as the ability of the Department to acknowledge <br />applications, transmit to agencies for proper review and comments, and developing the Planning <br />Director’s position and recommendation regarding a use permit application, and transmitting the <br />same to the Planning Commission, all within the 60-day time frame – it’s very, very difficult. <br />Therefore, we are requesting, the Director has introduced this bill that would amend Section 25- <br />2-63, Subsection (a) of the Zoning Code, to amend the section to increase the processing time <br />period from 60 days to 90 days, nine-zero, which is the time period consistent with other types of <br />application like special permit application and SMA application. So we have our request before <br />you. <br />HOUSEL: Thank you, Daryn. Any questions, Commissioners? There are no persons signed up <br />to testify on this. Would anyone like to make a motion? <br />1 <br />EXHIBIT B <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.