Laserfiche WebLink
Special Permit Application and Use Permit Application Hamakua Health Center, Inc. <br /> 3. Phase III - Workforce Housing, is a two-story, approximately 5,696 square <br /> feet building (first floor of 3,808 square feet and second floor of 1,888 <br /> square feet) (see Exhibit 4a; Exhibit 4e-floor plans),which will house <br /> varying mixes of Project contract workers and employees, traveling multi- <br /> disciplinary researchers and trainees working at the Project, for periods <br /> ranging from a few nights up to a few years, depending on the topic and <br /> level of research and training. HHC is collaborating with the John A. <br /> Burns School of Medicine on its training and recruitment program (see <br /> Exhibit 4 and Exhibit 4a). <br /> a. Water, Wastewater and Fire Control Services: Based on the water <br /> demand calculations for the Workforce Housing, water from the <br /> existing 5/8th-inch meter is insufficient to meet the water demands <br /> for the Phase III development(see Exhibit 19a). The DWS is <br /> expected to complete construction of, and bring on-line a new tank <br /> site in 2023. The DWS has preliminarily informed the Project's <br /> engineers that additional units of water required by Phase III can <br /> be made available, subject to final determination by DWS (see <br /> Exhibit 19b). A new IWS with primary and backup secondary <br /> absorptions beds approved by the DOH will be installed (see <br /> Exhibit 4a). Fire control will be handled by the DWS municipal <br /> system, supplemented by a dedicated, stand-alone 10,000-gallon <br /> water catchment tank with a 4-inch waterline supplying the Fire <br /> Department Connection mounted on a concrete monument which <br /> will alleviate the need for a fire hydrant to be installed for <br /> subsequent phases. The primary and backup secondary absorptions <br /> beds will be shared with the Permanent Clinic. <br /> b. Access and Parking: Access to the Workforce Housing will be via <br /> either the Maluhia Road Driveway or the Akoni Pule Highway <br /> Driveway. A total of 8 off-street parking stalls, including an ADA <br /> area are proposed in Phase III (see Exhibit 4a). During certain <br /> periods of the construction phase,vehicles will access the Project <br /> from the Maluhia Road Driveway. <br /> C. Project Timetable and Phasing. <br /> Development of the Project components will be implemented in three phases. <br /> I. Transitional Clinic. HHC has secured funding which will allow for the <br /> immediate construction of the Transitional Clinic upon approval of the <br /> Special Permit application (subject however,to approval of the Plan <br /> Approval, grading permit, building permit and Certificate of Occupancy), <br /> _________________________________________________________________Page 7 of 38 <br />