Laserfiche WebLink
surrounding chain link fence; <br />• Construction of a new playground and a surrounding chain link fence; <br />• Designation of a boat turnaround area; and <br />• Installation of vehicular barriers to prevent unauthorized vehicles from accessing the <br />shoreline and the pavilion. <br />In 2019 the Board of Land and Natural Resources certified the shoreline for the subject <br />property along the makai edge of the existing seawalls that surround the subject property. <br />While the proposed improvements aim to remove and reconstruct the existing pavilion, the <br />pavilion as well as new walkway improvements and a new boat turnaround area will be <br />located within the minimum 40-foot shoreline setback area and therefore the Department of <br />Parks and Recreation has concurrently applied for a Shoreline Setback Variance (SSV) for <br />these improvements. <br />The following improvements are being requested concurrently under the Shoreline <br />Setback Variance application (PL-SSV-2023-000003): <br />• Replacement of the existing pavilion <br />• Improvements of the walkways connecting the comfort station. <br />• Designation of a boat turnaround area. <br />The Department of Parks and Recreation has also provided various alternatives to the <br />project located within the Final Environmental Assessement (FEA) and ultimately selected <br />the Site Plan (Figure 3) as shown in the FEA. Additionally, Figure 8 of the FEA shows a <br />complete list of the proposed improvements to the Miloli`i Beach Park while including the <br />subject property's relation to the shoreline and the minimum 40-foot shoreline setback line <br />and VE flood zone for the area. <br />2. Project Objective: The proposed action aims to satisfy the County's obligation of its <br />federally mandated Transition Plan (relating to ADA upgrades at County facilities), while <br />retaining and improving the ability to effectively maintain the park and ensuring long-term <br />use and serviceability. <br />3. Project Timetable and Cost: The current estimated cost of the improvements is $1,750,000. <br />The project would be initiated after the granting of all of the necessary permits. <br />4. Supportive Information: The applicant has submitted the attached in support of the request: <br />(Planning Department Exhibit 1 — SMA Use Permit Application dated January 25, <br />-2- <br />