My WebLink
|
Help
|
About
|
Sign Out
Home
2023-08-09 PD POWERPOINT PRESENTATION (PL-SPP-2023-000040)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-08-09 Leeward
>
Item #6 WDC Properties LLC (PL-SPP-2023-000040)
>
Additional Info Provided to Commission for Consideration at 8-9-23 Hearing
>
2023-08-09 PD POWERPOINT PRESENTATION (PL-SPP-2023-000040)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 1:16:13 PM
Creation date
8/14/2023 1:03:39 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
8/9/2023
Related Permits
PL-SPP-2023-000040, SPP-83-000001, SPP 538,
Permit Number
PL-SPP-2023-000040
Parcel Number
680010430000
Description
2023-08-09 PD POWERPOINT PRESENTATION (PL-SPP-2023-000040)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PURPOSE OF REQUEST <br /> The requested time extension is not for the lack of performance but an <br /> extension of the permit life. <br /> The applicant intends to maintain the operation of an existing heliport <br /> and its related facilities. <br /> The current permit limits heliport operations at the property to a maximum <br /> of 40 landings per day during daylight hours, excluding emergency <br /> landings for emergency helicopter support. <br /> The granting of a time extension will help amortize the cost of the <br /> proposed 3,500-square feet hangar improvement. The hangar will enable <br /> more efficient repair and maintenance of the helicopters. <br /> Currently, repair and maintenance work are taking place in Hilo, whic <br /> requires additional flight time and fuel. <br /> The estimated cost for the construction of the proposed hangar is <br /> between $3.5 and $4 million. The licensee expects the new hangar to be <br /> completed within 5 years. <br />
The URL can be used to link to this page
Your browser does not support the video tag.