My WebLink
|
Help
|
About
|
Sign Out
Home
PD Background Report (PL-SMA-2023-032 & PL-REZ-2023-047)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-09-01 Windward
>
Item #3 Aloha Kia (PL-SMA-2023-000032)
>
PD Background Report (PL-SMA-2023-032 & PL-REZ-2023-047)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 7:06:18 AM
Creation date
8/24/2023 7:04:58 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
8/11/2023
Related Permits
PL-REZ-2023-000047
Permit Number
PL-SMA-2023-000032
Parcel Number
210060020000
Description
PD Background Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
25. Water: According to the applicant and the Department of Water Supply (DWS), the <br /> subject parcel is served by the existing County 12-inch water line with three (3) existing <br /> services (Account Nos. 260-02200, 260-02400, and 260-02600) for the project parcel. <br /> Estimated maximum daily water usage calculations for the proposed project will require <br /> review and approval by the DWS as well as any required water line appurtenances. <br /> 26. Wastewater: The wastewater system will integrate with the County's wastewater system <br /> that runs along Kalaniana`ole Street via a 30-inch sewer main with sufficient capacity to <br /> support the proposed use. The applicant intends to utilize water efficient practices to reduce <br /> water consumption and wastewater generation. <br /> 27. Solid Waste: Solid waste generated by the proposed project will be collected and disposed <br /> at approved County solid waste disposal facilities. <br /> 28. Essential Utilities and Services: Electricity and telephone services are available to the <br /> site. There is a Fire station and Police station all located within 1.5 miles of the proposed <br /> project site. <br /> AGENCIES' COMMENTS <br /> 29. Department of Environmental Management-Wastewater/Solid Waste Division <br /> (Planning Department Exhibit 3 —June 19,2023,Memo). <br /> 30. Department of Public Works,Engineering Division (Planning Department Exhibit 4 <br /> —July 10,2023,Memo). <br /> 31. Department of Water Supply (Planning Department Exhibit 5 —July 5,2023,letter) <br /> 32. State Department of Transportation (Planning Department Exhibit 6—July 7, 2023, <br /> Letter). <br /> 33. Department of Land and Natural Resources-Engineering Division (Planning <br /> Department Exhibit 7—July 19,2023,Memo). <br /> AGENCIES -NO COMMENTS/CONCERNS/OBJECTIONS <br /> 34. Police Department, DLNR- Land Division <br /> AGENCIES -NO RESPONSE <br /> 35. Fire, State Department of Health, Office of Planning and Sustainable Development, <br /> HELCO <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.