My WebLink
|
Help
|
About
|
Sign Out
Home
PD Background Report (PL-SMA-2023-032 & PL-REZ-2023-047)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-09-01 Windward
>
Item #4 Aloha Kia (PL-REZ-2023-000047)
>
PD Background Report (PL-SMA-2023-032 & PL-REZ-2023-047)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 7:21:53 AM
Creation date
8/24/2023 7:21:32 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
8/11/2023
Related Permits
PL-SMA-2023-000032
Permit Number
PL-REZ-2023-000047
Parcel Number
210060020000
Description
PD Background Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A breakroom and bathroom are proposed for staff use. A new 6,770 square foot <br /> building is proposed to house eight(8) service bays and a detailing area. A <br /> breakroom, locker room, one (1) half bath and shower room are also proposed for <br /> employee use. Ninety (90)parking stalls are proposed for retail sales inventory and <br /> forty-five (45)for customers and staff. Three (3)loading zones will also serve the <br /> site. Figure 2 displays the proposed site plan and project components, and Figure 4 <br /> shows the proposed building elevations. <br /> Operating hours would be between 8:30 AM and 7:00 PM Monday to Saturday, <br /> closed Sundays. Approximately twenty (20)peak hour vehicular trips are expected <br /> for service visits and car sales. The project would support fifteen (15) employees. <br /> Water is available through the Hawaii County Department of Water Supply. Water <br /> capacity will be determined in consultation with DWS based on water calculations for <br /> the proposed use. Wastewater will be handled through the county sewer system. <br /> Water efficient fixtures and practices will be implemented throughout the <br /> development and site to reduce water use. Electricity is available through Hawaiian <br /> Electric Light Company. <br /> B. Permitting History <br /> The building on the subject site is permitted for commercial use. According to <br /> Building Division records, the structure was once permitted as offices and was later <br /> converted to retail and restaurant uses. <br /> C. Project Timetable and Cost <br /> The applicant hopes to secure the requested change of zone and Special Management <br /> Area Use Permit approval as soon as possible and begin the building permit process <br /> immediately thereafter. <br /> Tentatively, plans call for securing all necessary permissions and permits by mid- <br /> 2024. Project improvements and renovations are planned to be completed by early- <br /> 2025. The estimated cost of improvements for this project will be approximately <br /> $1,000,000. <br /> IV. INSTITUTIONAL CONSIDERATIONS <br /> A. State Land Use <br /> The subject site is designated State Land Use Urban. No State Land Use Boundary <br /> Amendment would be required to permit the requested change of zone and no State <br /> Land Use Commission action is required. The County of Hawaii can process the <br /> rezoning request. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.