Laserfiche WebLink
entrance and garage, the total accessory square footage is 2075.The floor plan of the Primary Farm Dwelling <br /> can be viewed in Exhibit 8. <br /> Construction Engineering Labs (CEL) was commissioned to conduct an onsite study to formulate the foundation <br /> plan. CEL recommends the use of pier foundations extending to the underlying soft rock stratum.The dwelling <br /> site is flat and will require minimal grading. Any excavated soil will remain onsite and used for landscaping. <br /> As noted in the site plan, the existing gravel roads will be used. One portion will be extended to reach the <br /> Primary Farm Dwelling. The construction of the dwelling would utilize electricity initially supplied to the site by <br /> HELCO. A solar array will power the dwelling once completed along with at least one electric vehicle. Upon <br /> completion, the solar system will be grid-tied with battery backup system. <br /> Water would be provided for initial construction and use by the residence from a well permitted by the State, <br /> located in the northwest corner of the lot. <br /> Wastewater would be managed with the construction of an on-site individual wastewater system (IWS) <br /> permitted by the State Department of Health. <br /> A silt fence bordering all soil-disturbing activities will be used during construction.The Accessory building will <br /> be constructed first, used for storage of construction materials and vehicles. A chemical containment area and <br /> spill kit would be placed in the stabilized construction area for storage of hazardous materials such as fuels. <br /> 3) Additional Farm Dwelling <br /> We are proposing the construction of an additional farm dwelling; single story, two-bedroom,two bathroom, <br /> 744 square foot living area and 732 square accessory structure area is being proposed to house farm workers. <br /> This structure will be located in the upper northwest portion of the lot near the entrance.The dwelling will be <br /> located ^250'from the top of Hakalau Gulch Pali (to the south and the top of the Hakalau gulch), —570'from <br /> the Hakalau Bay shoreline at an elevation of^220 feet above sea level. The floorplan can be viewed in Exhibit <br /> 9. <br /> Construction Engineering Labs (CEL) was commissioned to conduct an onsite study to formulate the foundation <br /> plan. Since the topsoil is only 1-1.5' deep in this area, CEL recommends the use of a slab on grade with minimal <br /> structural fill brought in to support the slab.The dwelling site is flat and will require minimal grading. All <br /> excavated soil removed to be replaced with structural fill will remain onsite and used for landscaping. <br /> As denoted in the site plan,the existing gravel road passing directly in front of the proposed site will be used. <br /> The construction of the dwelling would utilize electricity initially supplied to the site by HELCO. A solar array will <br /> power the dwelling once completed. On completion,the solar system will be grid-tied with battery backup <br /> system. <br /> Water would be provided for initial construction and use by the residence from a well permitted by the State, <br /> located in the northwest corner of the lot. <br /> 4 <br />