HomeMy WebLinkAboutApplicant's Addendem to TIAR 12.12.2022 ssF=m
International
Innovate I Adapt I Sustain
Date: 12/12/2022 SSFM 2019 097
SUBJECT: KTL Kona Villas November 2021 Final TIAR Addendum
L Introduction
Kona Three LLC is proposing to develop a 450-unit multi-family residential subdivision (see
Figure 1) named "Royal Vistas" (previously referred to as "Kona Villas") over two phases on a
70-acre site zoned"RM-5"in Kona, on the Island of Hawaii. The property is located on the mauka
side of the Queen Kaahumanu Highway (Route 11) at TMK (3) 7-6-021:016, 17 between Kona
Vista Subdivision and Pualani Estates Subdivision and will intersect Route 11 at the Royal Vistas
Roadway. Phase 1 proposed to construct 258 units while Phase 2 included the construction of the
remaining 192 units.
l77
/
I
r— l F \ e� I _4�
�\
MM.k.
101
-11 s qZ
Master Ylan
Master Plan for loyal Vista
Figure 1: Conceptual Site Plan
The latest traffic impact analysis report(TIAR),Final Royal Vistas TIAR(SSFM,November 2021)
analyzed the phased impact of the proposed development on the study intersections shown in
Figure 2. In this, a single roadway (named "Royal Vistas Roadway" and referred to in previous
versions of the TIARs as "Royal Vistas Driveway") was planned for construction in 2024 with
Phase 1 to provide development access through an intersection with Route 11, approximately 600
feet north of the intersection with Kuakini Highway. In 2029 Phase 2 included a secondary
development access to Lako Street through Kekauanaoa Place.
501 Sumner Street I Suite 620 1 Honolulu,Hawaii 96817 1 Tel 808.531.1308 1 Fax 855.329.7736 1 www.ssfm.com
Planning I Project&Construction Management I Structural,Civil&Traffic Engineering
KTL Kona Villas November 2V2/Final 7I48Addendum
E-B EMB" N=M Page
|nternationai
m"°=," / Adapt / a"",°m 12/12/2022
KTL Kona Villas November 2021 Final TIAR Addendum
E-B EMB" F=m Page
International 12/12/2022
Innovate I Adapt I Sustain
The following TIARs and updates have been submitted to date in support of this project:
1. Final Royal Vistas TIAR (SSFM, May 2020)
o Submitted in support of an Environmental Assessment(EA).
o The following recommendations were made at the intersections with Route 11:
■ At Palani Road, continue to monitor traffic operations and signal timing.
■ At Henry Street, changing the existing split phasing can improve traffic
operations.
■ At Hualalai Street (north), consider a future traffic signal or single-lane
roundabout.
■ At Hualalai Street (south), remain unsignalized and continue to monitor
traffic operations.
■ At Puapuaaui Street, continue to monitor existing traffic and adjust signal
timing if needed.
■ At Royal Vistas Roadway, a connection to Kekuanaoa Place should be
completed before the completion of Phase 2.
■ At Kuakini Highway, consider a future traffic signal or single-lane
roundabout.
■ At Lako Street, consider changing the Lako Street approaches from the
existing split phasing to protected phasing. The widening of Route 11 from
Henry Street to Kamehameha III Road included in the 2035 Transportation
Plan should be completed.
■ At Kamehameha III Road, continue to monitor traffic operations and signal
timing.
o TIAR was reviewed and commented on by the County of Hawaii (COH) twice
during the initial review period.
o A memo from COH Department of Public Works (DPW)was responded to.
2. Final Royal Vistas TIAR (SSFM, February 2021)
o Following the approval of the Finding of No Significant Impact (FONSI) of the
EA, the TIAR was submitted to COH.
o The following changes to the recommendations from the previous submittal are:
■ At Henry Street, continue to monitor traffic operations and signal timing.
■ At Hualalai Street (north), consider a future traffic signal if needed, but
priority should be given to traffic moving along Route 11. The single-lane
roundabout analysis was shown to operate poorly and was removed from
the recommendation.
■ At Kuakini Highway, consider a future traffic signal. The single-lane
roundabout analysis was shown to operate poorly and was removed from
the recommendation.
■ At Lako Street, consider alternate phasing for the Lako Street approaches.
The widening of Route 11 from Henry Street to Kamehameha III Road
included in the 2035 Transportation Plan should be completed.
o Comments received from COH DPW Traffic Division and addressed to the
Planning Department in a Review Comment Form dated August 3, 2021 were
received and responded to (attached at the end of this document).
KTL Kona Villas November 2021 Final TIAR Addendum
E-B EMB" F=m Page
International 12/12/2022
Innovate I Adapt I Sustain
3. Final Royal Vistas TIAR (SSFM, November 2021)
o Incorporated changes from the August 3, 2021 comments, submitted, and accepted.
o The following changes to the recommendations from the previous submittal are:
■ At Hualalai Street(north) should remain unsignalized. This intersection did
not pass traffic signal warrants and single-lane roundabout were shown to
worsen operations.
■ At Hualalai Street(south) should remain unsignalized. This intersection did
not pass traffic signal warrants and single-lane roundabout were shown to
worsen operations.
■ At Kuakini Highway a traffic signal and single-lane roundabout would
worsen traffic operations. This intersection is recommended to remain
unsignalized.
o Comments were received from COH DPW Traffic Division and addressed to the
Planning Department in a Review Comment form dated September 28, 2022
(attached at the end of this document). These are the basis for this addendum.
A. September 28, 2022 Comments from County of Hawaii Traffic Division
Comments dated September 28, 2022 from the COH DPW Traffic Division were received and
subsequent discussions with DPW resulted in an agreement to provide an addendum to the
November 2021 Final TIAR to address the following:
Comment#1: Include the project connection to Lako Street, through Kekauanaoa Place, in Phase
1 as opposed to the original plans to include in Phase 2.
• This will require a redistribution and analysis of future traffic outbound project related trips
for Phase 1 including the Future (2024), Future (2029), and Future (2039) With Project
conditions.
• Future With Project analysis will need to be updated at Royal Vistas Roadway, Kuakini
Highway, and Lako Street.
Comment #2: Provide further documentation to support the need for State of Hawaii DOT to
widen Route 11 from 2 lanes to 4 lanes, between Henry Street and Kamehameha III Road.
Comment #3: Include a discussion about the existing vehicular bottleneck along Route 11 at the
intersection with Nani Kailua Drive.
Comment#4: Include clarification as to why "no action" (doing nothing)is better than installing
a traffic signal or a roundabout at the unsignalized intersections of concern.
Comment #5: Mitigation for Lako Street, including the widening of Route 11 from 2 lanes to 4
lanes, dual eastbound left turn lanes, and the possibility of changing the Lako Street approach
phasing if sight distance is adequate.
IL November 2021 Final TIAR Summary
The November 2021 Final TIAR analyzed the Existing (2019) traffic conditions and the Future
(2024, 2029, 2039)traffic impact of the project's buildout over two phases.
A. Existing (2019) Conditions Analysis
Analysis of Existing (2019) conditions found that all signalized study intersections operated at
KTL Kona Villas November 2021 Final TIAR Addendum
E-B EMB" F=m Page
International 12/12/2022
Innovate I Adapt I Sustain
LOS D or better during the AM and PM peak hours, however the following Route 11 intersection
movements operated at LOS E or worse:
• At Hualalai Street(north): EB left turns in both peak hours
• At Hualalai Street(south): WB left turns in both peak hours, and the WB right turn
• At Puapuaanui Street: SB left turn in the AM and WB left turn in both peak hours
• At Kuakini Highway: EB left turn in both peak hours
• At Lako Street: EB left turn in the AM peak hour
1. Existing (2019) Condition Mitigation
The following recommendations were made to mitigate the noted intersection movements:
• As a result of signal warrants not being met, it was recommended that the intersections
remain unsignalized and for future roundabout analysis to be done at both Hualalai Street
intersections.
• An acceleration lane was recommended for the westbound right turn from Hualalai Street
(south) onto Route 11, similar to all other unsignalized intersections with Route 11 in the
project area.
• No change was recommended at the Puapuaanui Street intersection.
• At Lako Street, the eastbound sight distance should be checked before considering before
changing the Lako Street approaches to have permitted left turns.
It was noted that following HDOT's Route 11 widening from Henry Street to Kamehameha III
Road, all movements at Lako Street would operate at an acceptable LOS with its current split
phasing.
B. Future Transportation Projects
The November 2021 Final TIAR identified noted transportation projects that would improve traffic
operations throughout the study area:
• Route 11 Widening from Henry Street to Kamehameha III Road
• Alii Highway Extension
• Lako Street Extension
• Puapuaanui Street—makai leg expansion as part of the Pualani Makai project
C. Future Conditions Analysis
As a part of the November 2021 Final TIAR analysis, Phase 1 proposed a single vehicular access
to the development through a full-access (left/right in/out)permitted, stop-controlled, intersection
with Route 11 by 2024. The intersection design included a westbound left turn refuge lane onto
Route 11. With the development of Phase 2, a secondary vehicular access to Kekuanaoa Place,
which currently intersects Lako Street, would be added by 2029.
1. Future Traffic Operations and Mitigation
The following recommendations were made to mitigate the noted intersection movements:
• As a result of poor intersection traffic operations as single-lane roundabouts for all future
years, it was eliminated as a recommendation for both Hualalai Street intersections.
• Neither Hualalai Street intersections passed traffic signal warrants and therefore they were
recommended to remain unsignalized.
• Kuakini Highway did pass the peak hour signal warrant in 2024 even though the
KTL Kona Villas November 2021 Final TIAR Addendum
E-B EMB" F=m Page
International 12/12/2022
Innovate I Adapt I Sustain
northbound left was projected to operate at LOS E or worse for all future years and the
southbound through was projected to operate at LOS F from 2039.
• Kuakini Highway was recommended to remain unsignalized to maintain minimal delay on
Route 11.
• At the Lako Street intersection, the eastbound sight distance should be checked before
changing the Lako Street approaches to have permitted left turns.
It was further noted that following HDOT's Route 11 widening from Henry Street to Kamehameha
III Road all movements at Lako Street would operate at an acceptable LOS with split phasing.
III. Route II at Nani Kailua Drive
The signalized Nani Kailua Drive intersection with Route 11 is located approximately 1.5-miles
north of the Royal Vistas Roadway and was not originally counted and analyzed as part of the
November 2021 Final TIAR. DPW requested additional discussion be included about traffic
conditions along Route 11 at the intersection with Nani Kailua Drive in comments from September
28, 2022.
This intersection has been noted as a bottleneck and cause of traffic delays along Route 11. One
reason for this is the traffic signal split phasing for the Nani Kailua Drive approaches. Split
phasing, especially when used on minor streets, results in a reduction in effective green time on
the major approach, increasing delay for vehicle movements on the mainline. Changing
intersection traffic signal phasing would result in more effective green time for vehicles traveling
through along Route 11.
Another project that can improve traffic operations at Nani Kailua Drive is the Nani Kailua Drive
extension. The Master Plan for Kailua Kona (April 2014) Land Use Master Plan (see Figure 3)
shows the location of the Nani Kailua Drive extension to Kuakini Highway and Oneo Lane,
connecting the Nani Kailua Drive extension to Alii Drive. Roadway connectivity will be improved
with this project by providing a mauka-makai connector road. Currently, Hualalai Street is the
only mauka-makai street connecting Route 11 to Kuakini Highway east of Henry Street.
KTL Kona Villas November 2021 Final TIAR Addendum
E-B EMB" F=m Page
International 12/12/2022
Innovate I Adapt I Sustain
� r /
Hiii
V
=. wA� <1 }.;°t -. �„(�f •. 47 / Eds4ng MO.Street
'k 9 •' 2 ';\' ?i .. E 2 Praposed Street
t - A
.-- �"'� `} ��• 4 •a�.rrt. `�. �.:•ah a ��.: Nuala�a5 S ;��� �, r l d e.-ry
✓ F 6 mm nel Cie
MC e J
k _tl aV
-.--� .. �'9/i/ _ _ - • i eSitlEntia3 Mixed Use
l• Qrj� r 1 gh Dcesuy
Li
Nand Kailua Drive
G I L'o Lana from _
Extension frorrl �'t rn. r?IParhs
PraposedNani Kailua 6tFi{p
Extension to AH Drive existing terminus to
,• Kuakini Highway LatiI�L�;I:
7r3,157fr1"I-IN
KAIII A•XONA
M1l111 t! !L=::
Figure 3: Conceptual Nani Kailua Drive Extension
IV. Updated Phase 1 Vehicle Access
A future development connection to Puapuaanui Street was proposed in the November 2021 Final
TIAR however that connection has since been omitted.
Additionally, the construction of Royal Vistas Roadway was proposed in Phase 1 to provide
development access through an intersection with Route 11. With this, a refuge lane was designed
for the westbound left turn onto Route 11 to enable these vehicles to get onto Route 11 without
conflicting with the southbound through movement. DPW noted concerns with the westbound left
turn from Royal Vistas Roadway onto Route 11 but deferred to HDOT.
DPW noted that the development connection to Lako Street needed to be made before the
occupancy of Phase 1. Therefore,plans for the connection to Lako Street through Kekaunaoa Place
were moved from Phase 2 to Phase 1. With this, the Royal Vistas Roadway westbound left turn
onto Route 11 in Phase 1 were redistributed to Lako Street.
A. Updated Phase 1 Project Related Vehicle Volumes
Phase 1 project related vehicles were redistributed at Lako Street and along the Route 11 corridor
based on the Existing (2019) traffic patterns at the study intersections for all Future With Project
conditions. As part of the Phase 1 outbound project related trips, vehicles intersecting Route 11 at
the westbound Royal Vistas Roadway approach, the southbound Kuakini Highway approach, and
the southbound Lako Street approach were redistributed to access Route 11 through the new
connection at Lako Street via Kekaunaoa Place and redistributed to the westbound Lako Street
approach. These vehicles were routed using the same distribution as was done using Existing
(2019)traffic patterns. This will impact the Future With Project conditions at these 3 intersections
in 2024, 2029, and 2039 by redistributing all westbound left-turn vehicles from the Royal Vistas
Roadway to the Route 11 at Lako Street intersection. The updated project generated and distributed
trips for Phase 1 are shown in Figure 4, with the affected volumes shown in red.
KTL Kona Villas November 2021 Final TIAR Addendum
E-B EMB" F=m Page
International 12/12/2022
Innovate I Adapt I Sustain
Route 11
pp Route 11
o �T
1(3) CO o
Route 19wwai urea '
=
lk,—5[5) 1
Route 11
*---21[14) Route I
Pr-1(1)
Route 1
4[19)
61(39) N
RautelitaKeaI1hou
Route 19toWatmea ___ An
2 46
k_21(11)
i 4-27(281
a { Roue 11
x � I
5(25)11-14
i
Route 11 to K eauhou
Route it
_.
L
t
Rnute 11 ��
-I--
A 1(2) $
5 °
` o o
r
Y --- l t�
V 91) t
Y N
Route 11 � �
J4
Route I rr
Route 11
Rout=_11 •
7 Zia k-5{q} � mVr k—
fl tt� 4(z1 a
y � � � �t � 8
� w
w rn
w
m
Route 11
Route 11
Legend
Peak HOUrV41llmes Analyzed Royal5:gna'ized Uns"gna'"zed
# # # $ �J Stop Sign
AM(PM1 (veh/hrl intersection Vistas n-e s ci,ion inte•.sec-'on
Roadway
Figure 4: Updated Phase 1 Project Related Trips
KTL Kona Villas November 2021 Final TIAR Addendum
E-B EMB" F=m Page
International 12/12/2022
Innovate I Adapt I Sustain
B. Updated Future With Project Traffic Operations
1. Updated Future (2024) With Project
The updated Future (2024) With Project volumes were updated with the Phase 1 Project Related
trips and are shown in Figure 5.
Route 11
Route 11
R
140(71y
�qr,_9(14) n
44
ss[asy�
Route 19taWaimea
1Q� 1XII�
~m 3E"51' Route 11
.-c:cg5
t Routell
v K.
T _..+- �_ Route 1
51E 133-� �
213[503)�
z
39
Route 11 tcn_auhau ��0{0} y;° �
Route 19 to Waimea s 7
a. k_529{360
} "� Route li
= 107[190y� •�•
423[799" �"'� i as
124[291
Route 11 toKeauTou
7 P
Route 11
140[1" Route 11 7
^" 59(23) - LP
} €?u
193[349q/
75[116y"14
R + - }
my� I °
Route 11 0 159(325y o
1,3
�i
Route-11
LMiloa pve a
w
Route 11 Route 11
7 moo m
rl a,a k-301{225} "-°" k�17(21)
12(11) 3
w� ti► 88{l4} w r r�� F.11(7)
m
N 281[14Sy� t f
48(30)— w�a�n L 1S3[335�
.. 69(48 �^ E 5[11 _
[52 y m
Not t0 Scala Route 11 v
Route 11
Legend
Royal
Peak Hour Volumes Analysed Signalised lI nersec ion
# # '# -�--- Vistas g � Stop Sign
AM(PM)(vehfhr) Intersection Roadway Intersection Intersection
Figure 5: Updated Future (2024)With Project Peak Hour Volumes
KTL Kona Villas November 2021 Final TIAR Addendum
m Page 10
International 12/12/2022
Innovate I Adapt I Sustain
Updated Future (2024) With Project intersection and movement LOS and average delay (in
seconds per vehicle)were determined for the AM and PM peak hours. Table 1 show the vehicular
delay and LOS at each intersection. The shaded row indicates the overall intersection delay.
Movements that operate at LOS E or worse are highlighted in yellow. By moving up the
construction of the Kekuanaoa Place connection from 2029 to 2024, in conjunction with Phase 1,
the traffic volume at Lako Street increases,resulting in the Route 11 southbound left turn operating
at LOS E. However, a single movement does not constitute a Transportation Facility, and the
overall intersection operates at an acceptable LOS D and LOS C in the AM and PM peak hours,
respectively. Synchro output worksheets are attached to the end of this document.
Table 1: Updated Future(2024)With Project Traffic Operations
Intersection AM I PM
Delay(sec/veh) v/c LOS Delay(sec/veh) v/c LOS
Route 11&Royal Vistas(overall) 0.7 - 0.6 -
Route 11 SB Left 10.3 0.02 B 11.2 0.08 B
Royal Vistas WB Right 20.5 0.22 C 20.7 0.16 C
Route 11&Kuakini Hwy(overall) 10.1 - 2.6 -
Route 11 NB Left 40.7 0.92 E 18.1 0.56 C
Kuakini EB Left 0.0 0.00 A 0.0 0.00 A
Route 11&LakoSt(overall) 45.1 - D 28.5 - C
Route 11 NB Left 18.0 0.12 B 18.7 0.17 B
Route 11 NB Through 42.9 0.93 D 23.3 0.81 C
Route 11 SB Left 59.6 0.88 E 25.0 0.68 C
Route 11SBThrough 24.7 0.74 C 23.8 0.85 C
Lako EB Left 92.0 0.94 F 69.6 0.84 E
Lako EB Through-Right 48.1 0.15 D 50.3 0.16 D
Lako WB Left 72.3 0.76 E 65.6 0.71 E
Lako WB Through-Right 62.5 0.33 E 58.3 0.41 E
KTL Kona Villas November 2021 Final TIAR Addendum
m Page 11
International 12/12/2022
Innovate I Adapt I Sustain
2. Updated Future (2029) With Project
Future (2029) With Project volumes were modified using the Updated Phase 1 Project Related
trips and are shown in Figure 6.
Route,li
Route 11
R
r 140(1�--
(14) I
44(10)-,"� T
7:-�
Route l4 toWai
m ry -S2S65�j Route I Route 11
- j l 165[2271u
✓ '4 1• } � Route 1
71[260},f$
144(1059}� n V
213(503)- _ti
"'w~'.'l I ',-log 16s)�
�V ary
Route ll to Keauhou 1�6{01 ,.. �
Route 19towaimea s 7
2f T m�
_545(368}
`a a-763[700} m"'
I ` 61(S4) x a
c b h o
Rome
= 107(190,}� ..
447(S53" �w&
Route 11 to K eaLwou
Route 11
6 _Route ll
11-153; 'c �'
jD-
193�13:9'/ t o
75 L1IJ
F-��
vaiC-0" alm}�F
Route 11 154(3251�
g N
A o
Route 11
Route 11 Route 11
mwo
7 � m m
v m w k4.307{2331 - m m.- �17(21) x
p t —43{42) + 12(11) 3
1 31771w t l /16[7) T
E Y $ f 3
N 293[152,-A `
4s(30y L 182(343�
E 5[11
6414smm -
V�V
Not to Scale Route 11 f- n�v
Route 11
Legend
Peak Hour Volumes Analyzed Royal Signalized lam, ' Unsignalized
#(#� AM(PM1(vehfhr) � Intersection - vistas � Intersection � Intersection 1 Stop Sign
Roadway
Figure 6: Updated Future (2029)With Project Peak Hour Volumes
KTL Kona Villas November 2021 Final TIAR Addendum
m Page 12
International 12/12/2022
Innovate I Adapt I Sustain
Updated Future (2029) With Project intersection and movement LOS and average delay (in
seconds per vehicle)were determined for the AM and PM peak hours. Table 2 show the vehicular
delay and LOS at each updated intersection. The shaded row indicates the overall intersection
delay. Movements that operate at LOS E or worse are highlighted in yellow. Synchro output
worksheets are attached to the end of this document.
Table 2: Updated Future(2029)With Project Traffic Operations
AM PM
Intersection
Delay(sec/veh) v/c LOS Delay(sec/veh) v/c LOS
Route 11&Royal Vistas(overall) 1.5 - 1.1 - -
Route 11 SB Left 10.6 0.04 B 12.5 0.15 B
Royal Vistas WB Right 27.5 0.43 D 26.3 0.31 D
Route 11&Kuakini Hwy(overall) 11.9 - 2.6 -
Route 11 NB Left 49.3 0.96 E 19.4 0.59 C
Kuakini EB Left 0.0 0.00 A 0.0 0.00 A
Route 11&LakoSt(overall) 55.8 - E 32.7 - C
Route 11 NB Left 18.5 0.13 B 22.3 0.19 C
Route 11 NB Through 52.0 0.98 D 26.6 0.85 C
Route 11SB Left 121.6 1.04 F 35.5 0.78 D
Route 11SBThrough 25.5 0.78 C 26.5 0.88 C
Lako EB Left 118.1 1.04 F 81.4 0.86 F
Lako EB Through-Right 47.8 0.17 D 55.4 0.16 E
Lako WB Left 68.9 0.78 E 72.3 0.75 E
Lako WB Through-Right 58.5 0.31 E 63.5 0.40 E
KTL Kona Villas November 2021 Final TIAR Addendum
M Page 13
International 12/12/2022
Innovate I Adapt I Sustain
3. Updated Future (2039) With Project
The updated Future (203 9) With Project volumes were updated with the Phase 1 Project Related
trips and are shown in Figure 7.
Route,li
� r, Route 11
r a". 140(71)
U
44(10) �
-,"
s6[ss) n.
Route 19 to Waimea x' tip i
m �42 65 w
ry —9051 Route 1 I
.1 Route 11
- J l '165[2271u
✓ '4 1• $ } � Route 1
597(1160)— n V
213(503)- _ti
m n
log[68}�
Route 11 to Keauhou 0{01
Route19 to Waimea s 7
2 f-� T„mom
c V 545(368) w-+
a..�932(764)
c b h
s 1117[190)� Route 1
42Z[g
Route 11 to Kea
Route 11
140(104)„ Route 11
—59(23) Ej
112(53)
75 L1F-��
W
a" 0[oy�L I
v V 159(32 r m
Route 11 v m
g
A F'
Route I1 .�
Route 11 Route 11
mmo
nm k-307{233) 11-17(21)
•+ —43{42) �^m
+-12(11)
1031771w t l /16() T
E Y $ f 3
8(30) f L
N 1, 182(343� 1 t f -
E 5[ll -
V NV
P�
Not to Scale Route 11 m
Route ll.�
Lepend
d Peak Hour Volumes Analyzed Royal Signalized Unsignalized
# # # Vistas S Stop Sign
AM)PM)(vehfhr) Intersection Roadway Intersection (�) Intersection
Figure 7: Future (2039)With Project Peak Hour Volumes (updated)
Future (2039) With Project intersection and movement LOS and average delay (in seconds per
vehicle) were determined for the AM and PM peak hours. Table 3 show the vehicular delay and
KTL Kona Villas November 2021 Final TIAR Addendum
m Page 14
International 12/12/2022
Innovate I Adapt I Sustain
LOS at each updated intersection. The shaded row indicates the overall intersection delay.
Movements that operate at LOS E or worse are highlighted in yellow. Synchro output worksheets
are attached to the end of this document.
Table 3: Updated Future(2039)With Project Traffic Operations
Intersection AM I PM
Delay(sec/veh) v/c LOS Delay(sec/veh) v/c LOS
Route 11&Royal Vistas(overall) 1.7 - 1.2 -
Route 11 SB Left 11.2 0.04 B 13.3 0.17 B
Royal Vistas WB Right 33.3 0.49 D 31.4 0.35 D
Route 11&Kuakini Hwy(overall) 16.0 - 2.8 -
Route 11 NB Left 71.0 1.04 F 22.9 0.64 C
Kuakini EB Left 0.0 0.00 A 0.0 0.00 A
Route 11&LakoSt(overall) 68.2 - E 48.7 - D
Route 11 NB Left 21.7 0.16 C 31.4 0.28 C
Route 11 NB Through 69.8 1.05 F 47.9 0.98 D
Route 11SB Left 181.2 1.19 F 81.2 0.90 F
Route 11SBThrough 29.0 0.83 C 37.7 0.96 D
Lako EB Left 127.7 1.06 F 82.6 0.86 F
Lako EB Through-Right 51.5 0.17 D 56.0 0.16 E
Lako WB Left 73.3 0.79 E 73.0 0.75 E
Lako WB Through-Right 62.4 0.31 E 11 64.1 0.40 E
C. Future With Project Mitigation
The November 2021 Final TIAR provided an analysis for all future years and a final mitigation
recommendation for full buildout. Therefore, recommendations will be made for the updated
intersections for the full buildout condition in Future (2039)with Project.
1. Royal Vistas Roadway Intersection
All movements at the intersection of Route 11 and Royal Vistas Roadway are projected to operate
at an acceptable LOS. No other improvements to this intersection are not recommended.
2. Kuakini Highway Intersection
The Route 11 and Kuakini Highway intersection does not pass the 4-hour warrant or peak hour
warrant when analyzing Route 11 as the major approach and Kuakini Highway as the minor
approach due to the Kuakini Highway left turns not meeting the minimum traffic volume threshold.
However, when analyzing the southbound Route 11 through as the major approach and the
northbound Route 11 left turn as the minor approach (see Table 4), this intersection does pass the
4-hour warrant in Existing (2019). The satisfying of a signal does not require a traffic signal.
Further analysis was done to check the effectiveness of a traffic signal at this intersection.
Table 4: Future 2039 With Project Traffic Operations
Time Major Approach Minor Approach Pass Warrant?
Route 11 SB Through Route 11 NB Left 1 Lane&1 Lane Curve
7-8 AM 776 335 Yes
8-9 AM 683 467 Yes
3-4 PM 881 224 Yes
4-5 PM 872 264 Yes
5-6 PM 870 217 Yes
Route 11 at Kuakini Highway was analyzed with protected and protected+permitted traffic signal
phasing for the northbound left turn. A comparison of the different phasing for the future
KTL Kona Villas November 2021 Final TIAR Addendum
m Page 15
International 12/12/2022
Innovate I Adapt I Sustain
conditions,including a scenario with the existing stop-control operation and the widening of Route
11 from 2 lanes to 4 lanes, can be found in Tables 5-7. The alternative that included 4-lanes on
Route 11 operated the best. It is recommended that this intersection remain unsignalized, and that
widening of Route 11 from Henry Street to Kamehameha IH Road HDOT project be completed.
Table 5: Future (2024)With Project Traffic Operations at Route 11 and Kuakini Highway
AM PM
2-Lane Route 11,Protected NB LT Signal
Phasing on Kuakini Highway Delay v/c LOS Delay v/c LOS
(sec/veh) (sec/veh)
Route 11&Kuakini Hwy(overall) 35.0 - D 20.0 C
Route 11 NB Left 68.8 0.98 E 76.6 0.93 E
Route 11 NB Through 1.5 0.56 A 1.4 0.56 A
Route 11 SB Through 46.4 0.96 D 19.1 0.84 B
Kuakini Highway EB approach 0.0 0.00 A 0.0 0.00 A
2-Lane Route 11,Protected+Permitted NB AM PM
LT Signal Phasing on Kuakini Highway Delay v/c LOS Delay
(sec/veh) (sec/veh) v/c LOS
Route 11&Kuakini Hwy(overall) 20.5 - C 4.0 - A
Route 11 NB Left 50.8 0.95 D 10.0 0.72 B
Route 11 NB Through 1.5 0.56 A 1.5 0.56 A
Route 11 SB Through 19.6 0.79 B 4.5 0.69 A
Kuakini Highway EB approach 0.0 0.00 A 0.0 0.00 A
AM PM
4-Lane Route 11,Unsignalized Delay Delay
(sec/veh) v/c LOS (sec/veh) v/c LOS
Route 11&Kuakini Hwy(overall) 10.5 - 2.6 - A
Route 11 NB Left 41.9 0.92 E 18.3 0.57 C
Kuakini Highway EB approach 0.0 0.00 A 0.0 0.00 A
Table 6: Future (2029)With Project Traffic Operations at Route 11 and Kuakini Highway
AM PM
2-Lane Route 11,Protected NB LT Signal
Phasing on Kuakini Highway Delay v/c LOS Delay
(sec/veh) (sec/veh) v/c LOS
Route 11&Kuakini Hwy(overall) 38.8 - D 20.5 - C
Route 11 NB Left 77.5 1.01 F 73.5 0.93 E
Route 11 NB Through 1.6 0.59 A 1.7 0.60 A
Route llSBThrough 52.0 0.99T D 22.0 1 0.89 C
Kuakini Highway EB approach 0.0 0.00 A 0.0 1 0.00 A
2-Lane Route 11,Protected+Permitted NB AM PM
LT Signal Phasing on Kuakini Highway Delay v/c LOS Delay v/c LOS
(sec/veh) (sec/veh)
Route 11&Kuakini Hwy(overall) 26.1 - C 4.8 - A
Route 11 NB Left 59.0 0.96 E 13.6 0.76 B
Route 11 NB Through 1.6 0.59 A 1.7 0.60 A
Route llSBThrough 30.1 0.89 C 5.0 0.72 A
Kuakini Highway EB approach 0.0 0.00 A 0.0 0.00 A
AM PM
4-Lane Route 11,Unsignalized Delay Delay
(sec/veh) v/c LOS (sec/veh) v/c LOS
Route 11&Kuakini Hwy(overall) 12.3 - 2.6 - A
Route 11 NB Left 50.9 0.96 F 19.7 0.59 C
Kuakini Highway EB approach 0.0 0.00 A 0.0 0.00 A
KTL Kona Villas November 2021 Final TIAR Addendum
m Page 16
International 12/12/2022
Innovate I Adapt I Sustain
Table 7: Future (2039)With Project Traffic Operations at Route 11 and Kuakini Highway
2-Lane Route 11,Protected NB LT Signal AM PM
Phasing on Kuakini Highway Delay v/c LOS Delay v/c LOS
(sec/veh) (sec/veh)
Route 11&Kuakini Hwy(overall) 47.0 - D 25.2 - C
Route 11 NB Left 100.7 1.08 F 81.4 0.94 F
Route 11 NB Through 2.1 0.65 A 2.1 0.66 A
Route llSBThrough 61.6 1.03 F 31.2 0.95 C
Kuakini Highway EB approach 0.0 0.00 A 0.0 0.00 A
2-Lane Route 11,Protected+Permitted NB AM PM
LT Signal Phasing on Kuakini Highway Delay v/c LOS Delay
(sec/veh) (sec/veh) v/c LOS
Route 11&Kuakini Hwy(overall) 39.1 - D 6.8 - A
Route 11 NB Left 86.8 1.04 F 26.0 0.86 C
Route 11 NB Through 2.1 0.65 A 2.1 0.66 A
Route llSBThrough 49.0 0.99 D 6.0 0.77 A
Kuakini Highway EB approach 0.0 0.00 A 0.0 0.00 A
AM PM
4-Lane Route 11,Unsignalized Delay Delay
(sec/veh) v/c LOS (sec/veh) v/c LOS
Route 11&Kuakini Hwy(overall) 16.5 - 2.9 - A
Route 11 NB Left 73.1 1.04 F 23.3 0.65 C
Kuakini Highway EB approach 0.0 0.00 A 0.0 0.00 A
3. Lako Street Intersection
The overall Route 11 at Lako Street intersection is projected to operate at LOS E during the AM
peak hour,beginning in 2029. As an alternative to the Existing(2019)split phasing on Lako Street,
the Lako Street approach left turns were analyzed with the following traffic signal phasing options:
(1)protected, (2)permitted, (3)protected+permitted, and (4) split phasing with Route 11 widened
from 2 lanes to 4 lanes. A comparison of the phasing alternatives and the widening of Route 11
are shown in Tables 8-10 for 2024, 2029, and 2039.
The protected phasing for Lako Street(Option 1) resulted in the intersection operations at LOS E
in Future (2039) With Project during the AM peak hour and is not recommended. Permitted
(Option 2) or protected+permitted (Option 3) phasing will operate at an overall acceptable LOS
for all future years and can be considered for the Lako Street approaches if sight distance is
adequate. If sight distance is inadequate, the split phasing should remain, and Route 11 should be
widened from 2 lanes to 4 lanes (Option 4).
In addition, the eastbound left turns from Lako Street onto Route 11 are nearing 300 vehicles per
hour, which is the threshold for when a second left turn lane is beneficial. The widening of Route
11 from 2 lanes to 4 lanes will allow for 2 receiving lanes Route 11 to accommodate dual eastbound
left turn lanes.
KTL Kona Villas November 2021 Final TIAR Addendum
EB" F=M Page 17
International 12/12/2022
Innovate I Adapt I Sustain
Table 8: Future (2024)With Project Traffic Operations at Route 11 and Lako Street
2-Lane Route 11,Protected Left Turn Signal AM PM
(sec/veh) (sec/veh)
Phasing on Lako Street Delay v/c LOS Delay v/c LOS
Route 11&Lako St(overall) 40.9 - D 26.3 - C
Route 11 NB Left 15.6 0.12 B 16.9 0.16 B
Route 11 NB Through 41.4 0.95 D 20.9 0.80 C
Route 11 SB Left 50.6 0.85 D 21.7 0.65 C
Route 11 SB Through 22.4 0.75 C 21.4 0.84 C
Lako EB Left 78.5 0.93 E 68.0 0.84 E
Lako EB Through-Right 42.4 0.17 D 51.4 0.19 D
Lako WB Left 61.4 0.75 E 64.3 0.71 E
Lako WB Through-Right 57.9 0.49 E 63.2 0.57 E
2-Lane Route 11, Permitted Left Turn Signal AM PM
�(sec/veh)� (sec/veh)
Phasing on Lako Street Delay v/c Los Delay v/c LOS
Route 11&Lako St(overall) 33.5 - C 21.8 - C
Route 11 NB Left 15.0 0.12 B 14.0 0.16 B
Route 11 NB Through 37.8 0.93 D 19.7 0.83 B
Route 11 SB Left 46.0 0.81 D 18.6 0.64 B
Route 11 SB Through 21.4 0.74 C 20.4 0.86 C
Lako EB Left 46.4 0.77 D 39.1 0.58 D
Lako EB Through-Right 33.1 0.11 C 32.1 0.10 C
Lako WB Left 36.9 0.25 D 34.7 0.26 C
Lako WB Through-Right 33.0 0.09 C 32.4 0.15 C
2-Lane Route 11,Prot+Perm Left Turn AM PM
Signal Phasing on Lako Street Delay v/c Los Delay
�(sec/veh)� (sec/veh) v/c LOS
Route 11&Lako St(overall) 31.2 - C 23.1 - C
Route 11 NB Left 12.8 0.11 B 14.7 0.16 B
Route 11 NB Through 29.9 0.88 C 20.0 0.82 B
Route 11 SB Left 31.2 0.71 C 19.4 0.64 B
Route 11 SB Through 18.2 0.71 B 20.7 0.86 C
Lako EB Left 61.5 0.85 E 47.9 0.66 D
Lako EB Through-Right 45.2 0.21 D 43.0 0.24 D
Lako WB Left 49.7 0.41 D 40.7 0.31 D
Lako WB Through-Right 57.8 0.49 E 47.3 0.46 D
AM PM
4-Lane Route 11,Split Phasing on Lako
Street Delay v/c Los Delay v/c LOS
�(sec/veh)� (sec/veh)
Route 11&Lako St(overall) 22.2 - C 16.0 - B
Route 11 NB Left 12.8 0.10 B 9.9 0.12 A
Route 11 NB Through 21.4 0.70 C 15.5 0.62 B
Route 11 SB Left 15.0 0.52 B 10.9 0.51 B
Route 11 SB Through 16.1 0.52 B 13.2 0.60 B
Lako EB Left 40.3 0.85 D 32.5 0.75 C
Lako EB Through-Right 24.4 0.14 C 25.5 0.14 C
Lako WB Left 38.0 0.67 D 33.6 0.60 C
Lako WB Through-Right 32.7 i 0.29 C 30.0 0.34 C
KTL Kona Villas November 2021 Final TIAR Addendum
EB" F=m Page 18
International 12/12/2022
Innovate I Adapt I Sustain
Table 9: Future (2029)With Project Traffic Operations at Route 11 and Lako Street
2-Lane Route 11,Protected Left Turn Signal AM PM
(sec/veh) (sec/veh)
Phasing on Lako Street Delay v/c Los Delay v/c Los
Route 11&Lako St(overall) 45.0 - D 29.2 - C
Route 11 NB Left 15.7 0.12 B 19.5 0.17 B
Route 11 NB Through 41.3 0.95 D 23.0 0.83 C
Route 11 SB Left 64.6 0.87 E 28.8 0.72 C
Route 11 SB Through 21.8 0.75 C 23.0 0.86 C
Lako EB Left 104.0 1.00 F 78.9 0.86 E
Lako EB Through-Right 49.2 0.20 D 56.8 0.20 E
Lako W B Left 67.5 0.80 E 70.8 0.75 E
Lako WBThrough-Right 65.2 0.56 E 70.4 0.60 E
AM PM
2-Lane Route 11,Permitted Left Turn Signal
Phasing on Lako Street Delay v/c LOS Delay
(sec/veh) (sec/veh) v/c LOS
Route 11&Lako St(overall) 42.3 - D 23.7 - C
Route 11 NB Left 16.4 0.13 B 16.5 0.16 B
Route 11 NB Through 50.7 0.99 D 19.8 0.81 B
Route 11 SB Left 91.4 0.96 F 23.4 0.67 C
Route 11 SB Through 23.2 0.77 C 19.9 0.84 B
Lako EB Left 46.9 0.77 D 54.8 0.65 D
Lako EB Through-Right 33.3 0.10 C 44.4 0.11 D
Lako W B Left 37.6 0.29 D 48.4 0.31 D
Lako WBThrough-Right 33.2 0.09 C 44.8 0.15 D
2-Lane Route 11,Prot+Perm Left Turn Signal AM PM
(sec/veh) (sec/veh)
Phasing on Lako Street Delay v/c LOS Delay v/c LOS
Route 11&Lako St(overall) 34.6 - C 24.6 - C
Route 11 NB Left 13.5 0.11 B 16.3 0.16 B
Route 11 NB Through 34.9 0.93 C 20.1 0.82 C
Route 11 SB Left 42.5 0.81 D 23.4 0.68 C
Route 11 SB Through 19.2 0.74 B 20.2 1 0.85 C
Lako EB Left 64.5 0.87 E 61.0 0.72 E
Lako EB Through-Right 46.8 0.24 D 52.6 0.26 D
Lako W B Left 48.5 0.43 D 50.4 0.37 D
Lako WBThrough-Right 58.2 0.52 E 60.4 0.56 E
AM PM
4-Lane Route 11,Split Phasing on Lako
Street Delay v/c LOS Delay v/c LOS
(sec/veh) (sec/veh)
Route 11&Lako St(overall) 23.6 - C 16.8 - B
Route 11 NB Left 13.4 0.11 B 10.3 0.12 B
Route 11 NB Through 23.2 0.75 C 16.6 0.66 B
Route 11 SB Left 16.8 0.55 B 11.8 0.54 B
Route 11 SB Through 17.0 0.55 B 13.9 0.63 B
Lako EB Left 42.0 0.86 D 32.7 0.75 C
Lako EB Through-Right 25.0 0.14 C 25.6 0.14 C
Lako W B Left 38.3 0.69 D 34.3 0.63 C
Lako WBThrough-Right 32.6 0.27 C 30.0 0.34 C
KTL Kona Villas November 2021 Final TIAR Addendum
EB" F=m Page 19
International 12/12/2022
Innovate I Adapt I Sustain
Table 10: Future(2039)With Project Traffic Operations at Route 11 and Lako Street
2-Lane Route 11,Protected Left Turn Signal AM PM
(sec/veh) (sec/veh)
Phasing on Lako Street Delay v/c LOS Delay v/c LOS
Route 11&Lako St(overall) 58.3 - E 38.6 - D
Route 11 NB Left 18.3 0.14 D 27.3 0.24 C
Route 11 NB Through 55.7 1.01 F 30.3 0.91 C
Route 11 SB Left 163.8 1.14 F 54.3 0.88 D
Route 11 SB Through 24.3 0.80 C 31.9 0.94 C
Lako EB Left 113.0 1.02 F 98.7 0.91 F
Lako EB Through-Right 52.8 0.21 D 54.4 0.20 D
Lako W B Left 72.2 0.81 E 79.3 0.79 E
Lako WBThrough-Right 69.6 0.57 E 67.0 0.60 E
AM PM
2-Lane Route 11,Permitted Left Turn Signal
Phasing on Lako Street Delay v/c LOS Delay
(sec/veh) (sec/veh) v/c LOS
Route 11&Lako St(overall) 54.8 - D 30.5 - C
Route 11 NB Left 19.3 0.16 B 24.1 0.22 C
Route 11 NB Through 70.8 1.06 F 26.0 0.90 C
Route 11 SB Left 141.8 1.11 F 41.1 0.84 D
Route 11 SB Through 27.3 0.84 C 28.8 0.93 C
Lako EB Left 47.5 0.77 D 51.2 0.64 D
Lako EB Through-Right 33.7 0.10 C 41.5 0.10 D
Lako W B Left 38.1 0.29 D 45.3 0.31 D
Lako WBThrough-Right 33.6 0.09 C 41.9 0.15 D
2-Lane Route 11,Prot+Perm Left Turn Signal AM PM
(sec/veh) (sec/veh)
Phasing on Lako Street Delay v/c LOS Delay v/c LOS
Route 11&Lako St(overall) 42.7 - D 28.4 - C
Route 11 NB Left 14.1 0.12 B 22.1 0.19 C
Route 11 NB Through 39.6 0.96 D 21.3 0.85 C
Route 11 SB Left 73.8 0.89 E 32.7 0.75 C
Route 11 SB Through 18.8 0.76 B 23.0 1 0.89 C
Lako EB Left 104.2 1.00 F 79.1 0.80 E
Lako EB Through-Right 54.6 0.29 D 61.8 0.26 E
Lako W B Left 54.1 0.45 D 61.1 0.42 E
Lako WBThrough-Right 65.3 0.56 E 72.8 0.62 E
AM PM
4-Lane Route 11,Split Phasing on Lako
Street Delay v/c LOS Delay v/c LOS
(sec/veh) (sec/veh)
Route 11&Lako St(overall) 23.8 - C 17.6 - B
Route 11 NB Left 13.6 0.12 B 10.7 0.14 B
Route 11 NB Through 25.0 0.80 C 17.5 0.71 B
Route 11 SB Left 19.3 0.60 B 13.3 0.57 B
Route 11 SB Through 17.7 0.60 B 14.9 0.69 B
Lako EB Left 43.7 0.86 D 33.1 0.75 C
Lako EB Through-Right 25.3 0.14 C 26.0 0.14 C
Lako W B Left 38.7 0.69 D 34.7 0.64 C
Lako WBThrough-Right 33.0 0.27 C 30.4 0.34 C
KTL Kona Villas November 2021 Final TIAR Addendum
m Page 20
International 12/12/2022
Innovate I Adapt I Sustain
V. Summary and Recommendations
Comments dated September 28, 2022 from the COH DPW Traffic Division were received and
subsequent discussions with DPW resulted in an agreement to provide an addendum to the
November 2021 Final TIAR to address the comments.
Comment#1:Include the project connection to Lako Street, through Kekauanaoa Place, in Phase
I as opposed to the original plans to include in Phase 2.
The westbound left turns exiting the project from the Royal Vistas Roadway were
redistributed to Lako Street via Kekaunaoa Place for all Future With Project conditions.
Traffic analysis and recommendations based on this update are addressed below.
Comment 2:Provide further documentation to support the need for State ofHawaii DOT to widen
Route 11 from 2 lanes to 4 lanes, between Henry Street and Kamehameha III Road.
Existing(2019)traffic analysis showed the Kuakini Highway and Lako Street intersections
with existing movements that operate at LOS E or worse. Kuakini Highway passed the 4-
hour traffic signal warrant in Existing(2019). Future analysis showed that the widening of
Route 11 from 2 lanes to 4 lanes at Kuakini Highway would result in the best overall
intersection operation while maintaining acceptable LOS for the Route 11 through
movements.
Comment#3: Include a discussion about the existing vehicular bottleneck along Route 11 at the
intersection with Nani Kailua Drive.
It was concluded that traffic signal phasing and the widening of Route 11 from 2 lanes to
4 lanes could improve intersection operations at Route 11 at Nani Kailua Drive. Regional
traffic could also benefit from the extension of Nani Kailua Drive to Kuakini Highway,
and the Oneo Lane extension from the proposed Nani Kailua Drive extension to Alii Road.
Comment#4:Include clarification as to why "no action" (doing nothing) is better than installing
a traffic signal or a roundabout at the unsignalized intersections of concern.
The Hualalai Street (north) and Hualalai Street (south) intersections had poor side-street
operations however they did not pass traffic signal warrants and an analysis as single-lane
roundabouts was also poor. Due to the fact that the overall left turn volume at these
intersections during the peak hours are relatively low it was determined that priority should
be given to the Route 11 through traffic and the intersections remain as they exists.
Comment#5: Mitigation for Lako Street
The intersection of Route 11 and Lako Street will operate at LOS E beginning in 2029. Alternatives
to the existing Lako Street traffic signal phasing resulted in acceptable LOS as permitted and
protected+permitted. These should only be considered if adequate sight distance can be provided.
With 4 lanes along Route 11, traffic operations at Lako Street were acceptable within existing
signal phasing. With the widening, it is also recommended to consider a second Lako Street left
turn lane.
Attachments:
• Comment-Response Spreadsheet from DPW Comments dated August 3, 2021.
• Comment-Response Spreadsheet from DPW Comments dated September 28, 2022.
• Synchro Analysis Worksheets
Comment-Response Spreadsheet from DPW Comments dated August 3, 2021
/
e ± /M > e 4
% § 2 / § \ j
% \ / ) \ _ CL
o S G
c < R e g I \ � / o § o
/ $ ./ \ / 'E / : / % ® 2 e
0 5 $ .- 2 & % » 7
& � / / \ / § § \ E \
g '0 m 2 E = E E } § .E
& .E .g '_ = 2 a) •- _ @
k e 2 E t Ex a g M
e / e \ e � \ E
\ tw ° 0 CO " � ƒ
_ •= ._ L g = �
o ƒ ( / ƒ / ƒ � ® '\
I \ _ M ® G t e = E $ u
/ % [ \ / k ( 2 / \ / \ /
E rn 2 .[ ƒ R / \ $ « £ 2 ±
B \ _ ® \ 2 E \
/ ® 0 2 k \ •g u e $ e e
% < \ 2 � ) $ \ » °
3 6 E E E ® / 7 ± \
u e G e '� E m e ° ± o
\ / / $ w o k CL
= e e
e > E •to 's 2 s = u
/ \ / 2 ƒ G E ƒ \ R 2 2
E t
u a) \
% E m _ § Q
e o 5 e ° \ e
/ \ / % = 2
} •/ » 'e O G ƒ \ \ CL
=
g m e § .§ � / = f =
/ .E ) ) E � /
e - M 5 2 ® 2 0
3 / 'C: y \ .g e E 2
E \ g 9 0 = u % E >
% \ _ \
ƒ / \ e 2 $ G \ Ln
2 2
° 0
= e G > E 4- ±o
s 2 :
g e . •e e
_ .E
a) = ■ @ = q \
2 m E
% § .% § \ $ / / /
m / ui7n n- < -c a I u E
LT-
0. <
/ / 0
w / /
< 0 / / E
CL f M 2
2 : ■
§ m m E
j _ a � e
E 0
0 0 ƒ / e m
+,
c
4; n5 O N N N N Q a) Z n5 N
V) O 4� o +' N ao a) a) s
V 3 N u >. s c °A +'
y L
0 O .� 0 a) N > L a) s cn
tw
N S N u L a) Q
a) �
-0a) > E toL a) s
o g E -0 a nz L 3 0 0 o s a
Q a) E o �o O aui > +' c
U- a) E O C L -4 2 L u s a) O u
N S u Q Q O a) h.0 ,N �, u u
N aci +n E a) a) a) n5 s = c co a) s n5
E C O N O 3 u O ao +� a)
L r'I +'� W L 3 •>
O (n H a) N O N N C coL a) C O
N OJ (6 U a) ri +� = �' 0 3 > O a
N nzU r- O c = � } � 3
-a a) > u O 4� a) L a)
1 4- > c coc -O° O °) o
c o .� N 3 ° O nz ri
° c c c � ° tin O c
L c a) o .� " 3 o c c +� O
H a) O � a) c m ° ai s +� o
a) u Ln E +� 3 m E u a) s L o
a) c s o a) a) c E o
�-•� .� L L •� L 3 s �-•� +'� s C
O 4. L a) N u O s = = s N +, 0 C
u s 4• N •L O +� a a) u O CL a)
coy 3 'Ca o u 4 + 34� 0 -0 3 3
L o =
c 3 Uu 0
= oC 3 N s
s +'
+, O
Q) 3 N
> z ON N
a)
O
a) W a- N
u L N C
a) � u — LL
3 a) c ° m
c .L Q •o ul 0
0
° -a V) 2 s CL v,
— — � 11 r 3 m
nz
ca) u > p > cn a
O E CL 3 � 3 p
+; +� _ c = J
{n LCL
�-a N 2 4E
� E� N CL 0Ns = 3 +;
Y ao L u
LRt
� d u N N co N cn
O
+, Q c% O O m -0 N > rlj > CV 0 Q
QJ
QJ
t
.a
R
QJ
Q
N
QJ
OC 0
a Q.
> a,
0 o m Ln
I= U
s bio ° -a a -a aco
0 to (1) N
_ so +� ° V)
4� C (� L C O 4� O > +,
m N — Uj +� +� L M +1 C 'N s s
a) C6 O Q O L u7 a) .0 L �, E C +' Q
0 C W J a) a)-a u C C N U N = L m a)
N C6 CU6 •N +� p 3 a u a) a) a) Ln C
f6 of +' C6 U L _
-W s Q a > s ° o c ° a) COO p 4- N E E
s W M > E
> a a) °' C6 •L " +� O C 2 a) w O L E
\ N U a � — m a+ C6 N U L O J Q p
N Q a) 3 �' O E c a � U s °' o NO E s -a a
\ +' C +' C Ln 'N a) a) +' O •_ J O
E � � a OO° a > O CC N E UC s 6 � oa) a w CL
Lu
o o O E o o a) ao Ln �
Q U +' N O H cLo 3 3 3 'Fn a 0 3 .0 s
a) 76 U a) CL
U a) C10 0 0
Q Q w w w a)a) U a) r-I N Q L C U -a
3 O +' o a L 0 >, a a) >, °) s M °)
a) U a c -a .L �, a) s0 a) a a N +�
E > 3s 3 c ` a3i a s .E s >
a +� L u c c a Ln o a o Ln E , E �_ s a
+' °c E ;� E E s co � 3 ) u 3 a sti_o > E �,°
3 � a +� a a U o p +' " s a + � ° a)
_ E °) E a c u
°) , .N o o x o a�i s ci > a) ° L
m s > C > -0 > L -a o L ° a a p N � a u p to E ca a +�
U C U C U O a)a- r14 N N V1 yi a) V1 C C O p
5 C f6 U -le � OO CL +, O — 'X p
E Q J C a- Q CL a) E s
(6 L
a) O
U VI C: VI
a)
a) U a) E L o +, E L
OL L +�
CL 3 ° 'O o o co o m
-a +� a c -a a s c
+,co E
U > u a) N m U > u
f6 U vi C a) L O C U C a)
a) +; a) u o
° o c U o a ° U o
s L s 4' C O E CL4 C Y p
° s ° +� a � � os a �
o ; ~� 4- N + u 3 +; c0 u 4 ° .CL o cn
U N O C C U +, C
U a) C 4- c6 0 O s00 a) � a) 0 Li 0 O
N •L O Q a) U a) 'L U a) U
� -i CL U a) _ � s m sE uO , s
3 ° a c c o ° m � c
S \ '3 > E N o s '3 s Ln o s
a) U a) +, s Q a)
aj m w s a) � 'a Q � w � L �
N cn cn Q c 3 +� 3 cn s °� c 3 +�
0 0 0 >N no 0 O Q N p 0 a) +' +' L p a)
0 U S D a- S J d 3 a..� S Q a-
t
Vl
R
Q
Vl
Cr 0
a Q.
N l0 00
> y Ln > > > >
m E
E o ri c.i
0 0 06 0;
OC U
V) $ s 4, V c
C ° +� L 4� C a) 3
m W o c s O E O
o s sao -le >, M Q °
> C a) o a)
++ m L — 0 = f 6 M N 3 to L > as, 0
i > � -a s OL Q s .O o 3 Y � >0 N
++ `~ C L 4' s -a 4' c L '� c6
- to � -a 4- 2 C (1) = m 4' u
3 'a u N N 'E u p ° O V)) N a)
c U
s m s m a s *'
N ono s° a tin s -a Um 4, c cn a`�i `� s a"i
� •N s � C Y ° 3 a U s a
+, N O 'a c6 m p
f6 U L 7 >, p -a L C L (6 -a U
0 � 0 0 V) 0 fC: �O 0 0 a) O 2 OL a) a) C CA
s
4� +� a) a s o nz nz a)
a) � -a V) a) V) U a) 4- s m c U -a
a � o +6 c 0 Q- +' .� a u o 3
2 N 2 N C •N 4- 2 N a) (C6 C a-•� s
} C a) 0 -a O 0 a) 0 +J
N E w •o_ E s N s C J m L 3 0 0
L L a) a) m m z a) O
(6 O c I a)
C Y OJ ate) E a N z s o > �
'a 'a L E 3 0 'a L C
_a V) _ �, O
> c 3 U � 0 3 _ � a) °
a E E a) a) m om - '}N u a) a
a-
`� CL s L U 4- 6 a)
o 3 O L to
s C s
L p p 0 ,� F f6 4' C tw 0 0 +� U O
2 -a ° = to E 4 nz 3 in ° 2 2 L 3 O U
L0
C
C
0
W nz
o
0 —
a) �
� N
'a —
N
}, C
C W
� N
E C
a)
O
L N
Q +.,
p
N �
C f6
C =
++ Q 0
Vl
R
L
Q
Vl
OC 0
a Q.
ar
>
E
E m
0 0
GC U
Comment-Response Spreadsheet from DPW Comments dated September 28, 2022
County of Hawai'i
Department of Public Works - Traffic Division
September 28, 2022
)Teems u 57
To: Christian Kay, Planning Department
From: Aaron Takaba(ATT), DPW TRF
Reference Name: Royal Vistas
Reference Number:
TMK: (3) 7-6-021:016, and 17
Item Pg No Comment B
1 Signalized intersections along Hwy 11: Palani Rd, Henry St, ATT
Malulani Dr, Nani Kailua Dr, Puapuaanui St, Lako St, Seaview Cir,
Laaloa Ave, Kamehameha III Rd. Why were the highlighted
intersections not studied?
........ ........ ..............................................................................................................................................................................................................................................................................
Hwy 11 at Lako St EB left turn is very congested in the AM ATT
during school traffic and in PM peak hour. This has caused
problems on lower Lako St and Kupuna St.
Other than mitigating the cut-through traffic on residential Kupuna ATT
St, I feel the benefit of the Lako St extension is minimal with
respect to the scope of this study. This extension would probably
add more traffic to an already congested intersection at Hwy 11.
Hwy 11 is very congested, particularly in the AM peak northbound. ATT
It has been observed that the pinch point is Lako St and back-ups
occur from Lako St to the adjacent signals including Seaview Cir,
Laaloa Ave, and Kamehameha III Rd. coordination A
implementedlemente( Land SP da tive i.Li.U-pEpgess.
Lako St traffic signal is currently split phase, I believe due to a ATT
sight distance concern westbound and possibly eastbound. This
phasing, while it may address a safety concern, is not efficient since
yyou add another clearance phase to the cycle.
...........................................................p...... y............................................................................................................................................
Changing Lako St signal from split phase to a concurrent green ball ATT
will be difficult due to driver habits and sight distance restrictions.
Significant improvements should be made at this intersection to
improve sight distance and to provide protected left turn phasing
(State standard) or protected/permissive if approved. Also, dual left
turn lanes (and Hwy 11 widening) should be provided eastbound as
the AM count is nearing 300 vph.
Please confirm/explain how LOS at Lako St is best with split phase ATT
(p
ermissive left turns is second best).
Adding lanes on Hwy H from Henry St to Kamehameha III Rd is ATT
needed now as AM and PM peaks typically result in large backups.
Generally, northbound in AM and southbound in PM.
Z:A2-PLAN REVIEW COMMENTS\N.Kona\Royal Vistas\Royal Vistas TIAR Review-210928(ATT).doc
County of Hawai'i is an Equal Opportunity Provider and Employer. Page 1 of 2
Hwy 11 at Hualalai Rd (south): ATT
My 2021 comment to May 2020 TIAR: "WB right turn LOS F with
project."
Updated Nov 30, 2021, TIAR does not show LOS analysis for WB
right turn from 2024 without project(pg. 28) and beyond.
Proper mitigating measures for right turns (acceleration lane
recommended by 2024) and left turns should be provided. There is
no recommendation to address the left turns once roundabout was
found to degrade overall LOS.
Hwy 11 at Royal Vistas Roadway: ATT
WB left turn LOS F in 2024.
Mitigating measures are needed, such as:
-Right in/right out;
-Connection to Lako St; and
-Improvements to Lako St since recommendation is to divert traffic
to Lako St with Phase 2.
Connection to Lako St needs to be made from the onset versus
before occupancy ancy phase hase 2.
...................................................... .............................................................. ................. ................. .............................................................................................................................................................................................................................................
Hwy 11 at Lako St: ATT
-EB left turn LOS E to LOS F in 2024 without project.
-WB through/right LOS D to E in 2024 with project.
Significant improvements need to be made due to the added traffic
on Lako St generated by the Royal Vistas development and the
eastbound left turn approaching 300 vph. This should include a WB
dual left turn lane, Hwy 11 road widening, and WB right turn
acceleration lane.
Hwy
H 11 at Kamehameha III Rd: ATT
My 2021 comment to May 2020 TIAR: "Overall LOS BIC to LOS
C with project. WB approach LOSE with project."
Why did the LOS values improve with the updated Nov 30, 2021,
TIAR?
......... ......... ................................................................................................................................................................................................................................................................................
ATT
Critical unsignalized intersections, including Kuakini Hwy and the ATT
two Hualalai Rd intersections need to be evaluated further.
Current study identifies low LOS but recommends doing nothing.,
Need more information to determine how much Alii Hwy would ATT
mitigate traffic concerns along Hwy 11.
Z:A2-PLAN REVIEW COMMENTS\N.Kona\Royal Vistas\Royal Vistas TIAR Review-210928(ATT).doc
County of Hawai'i is an Equal Opportunity Provider and Employer. Page 2 of 2
O
Q = _
E J
O =
O
V
0 E
O
7 � O O
Y N
E ow,
p N=
p N
m 7 O
>
Z O- 7 N
w
o = °o
= m
= O p p =
O � _ O
N N N
O O O
a 0 .E O_ Z -O Z Z Z
Np ?� m O E
N Z =
m O00
v t
= v = 7 p
O —
m Q m O
-0m m W Z O-
Q E Y_ O -o
O 0
i) E -p u
> O O
U 3 0
o CL
It v o
v a
= vi p N Y = N N N
V
p � _ = N O O O
_ 'p '� Z Z Z
E a .' ' ">
$ a ° v Y a a a
-6 = i O °
L +� a O
O
't>-n .o o a a .E m o v LL
COL Z a v .° v v E o v v m a
c E >
E v a E .g ° o Q-°Y c t3 Q, a o o
o S - '� u E ° o 0 o ' m = 3 a
t4
� _ � .a 00 t, > E ,O � c�'., tip m
0 o a -tp v ° a v v' -m a o v
c Q, Q, o o .o E a a, � n ° Y Mu c
o ° v E s ° v o x o ti '° Y
v o _ _ o = m o_ � a
3 3 a 3 c ~ a o m y ° 13 a m z to
O O O` �0) O � YhOEp0 uN m
- >. W O N O
E N =o o_ a==, V
° 0 0 O 0 V a O V Y
C', 0) WdD
0)
H m 3 Y 2 S §3 z v , u 3 = - N z
v
m = i Y O O T
K m = N = = O O E . ) -O
co CL
m w t4 a, in -O
m O u = O_ a.., aL,,, T '� 7to
INd m O w O M .T v 0 O
d to O N O = to
to Y O t E m = +L+ 00 v m = V '6 in
p = m .� O
N Q M N C
v, z 3 O E p
N ++ '7 O m m m E
O D V m
O -0 � E V 0) Lv a Y N .Oc_
w O O toa, T W :t V -0 C-
v = O m= -0 = O m = EZV O -O Y
m > v 0 tipE0) a V m '—^
in t M1 m -p V ,m in O � O 0 O m
N = 7 O =
E m m v ti L c a= v V ti = L n J Q
o w 3 v .� a t v ,v_ 3 m Y oii
V in 2 in = in 2 +L+ H Y v in +L+ ++ ti 2 Q O_ -m V V K
E
N
Gn Gn O Gn
N _ 0
ti ti .� L 3 3 ti
�° �° , r b '3 �°
c c L w c E c
0 o m ° O
C C C S V 'p C
O
M N O
C N
in in N '6
u u ++ J L m u
00 �' O- L O '6
N N
CL
O �
c
w w E N N w
Y
N¢ ¢ Q O 2E ¢
n 10, c
O O 0) V E O O_ V N 0 O
t N C N
Y bn 0 tp N 0 Q N m w ++ t O T O Y
Ec - .° > � 3 a 3 O c v
° o m Lv v °o ° v° c� a ° u o
'V^ s V ai m 'o L c V o i^
=o v o_ 3 0_ ° cn m o_ -0 ° v
to +� -o cy o v c c s + s ° m v W .°
S .Q 'r - p_ -0 m S
'p in O Q — '6 0 V T V
N' > O v�i Q
N o N
3 t am =° v ¢ v 3 cam v u ° t v '2 3 t
Vt m c-I 0 0 V1 V V1
rl Q C O -0 N Gn N O -° O a t c-I p_
N p Y '6 N E i T E O_
O c -0 v 3 '> u v 3 O T °
x '
0 ,m a a 0 $ v u o L v .Q O 0
c� c X v v 0 ¢ N '^ c u
C � m m w O O- T O O N O N = Q 3 0 ° '6 > > V N
c 3 ° > - p c
n, E t Q m c v v v
Ln
Q t a v E
x > cn m ° >
3 v E ,- E t 0 cn x v
v > v '� Y o v ° E '� v
o ° = c UO E $ o ° $ v m p c o a
Ln
v cn � c cn tip
v o E c
w v = v .
° ) � v g v o axi o ° 0 ti o
-o = 0 3 ¢ a 0 N O 00 3
Oi N p V 0 N cy ++ N i N C C N
0 m 0 t m -oO O v o ^ E E o o ° m v
m O H m — N V N O 0 p Gn > V w t
v 3 c v N E 'm ° t c O cn °°°
s m v O Q = v V in L '� a ,c c
m -0 ° - -E to v = a = ° -o 0) m In L
m E 3 v p L o ° E oLn 0 0
.0 cy N N v Y j H m > cy '6 0 p
m c-I m ; Ql J E J N m _ Gn > K
ni E v - m o m o m -^ m m o- M - c v E 6 ¢_ 0
N 7 E L Y a N C .- w ¢ p- E '� Vt Y Q a
N L p O m Ill O O X N N E O -0 0) in p _ c
~ ti m g ° cn a cn p Y .O
0) o 'm w co o E °°° > u .E �°- E 3 Q o_ 3 c o_ m m °
O N O N m p � 0 °zY O m Q m a > O_ > a i
O z a H
O E ? > J
O m w N \ O C c
N � 0 - N O_ w C -p > OV m O
s O n 0)N 3 hp C N N w p O 0 O V' d
�v a V 0
o6 -¢a v , n
u ° p
v a
a L V coo
T mO N 0
,3OO°�0
YV
O O_ - 0 f
Om E m V 0 COm E
3 -0 E O
tcc7
O > 7
7 in � c' Q `� — V -0 00 t m O
V -6 m 3 C V
° c c m - m m >M 0 _s 2
x v
m vi >T m bn -in N t -2 � \ c - ¢
t, m
OM
C 7 N
E > o > T O O + m E .Q °
in in U°nN o '� > Q p NO_
> °- u E E 0)
—0 -° ° z o_ E
c t $ Ym
Yam cu a 0) a -0 Q o
L r, 00
0)
bio bjo
T O
C H
v O c
p ti
O 2 N
V
0 t 7
!= O
° 3 �
Y =
O O
O
°- 3 0
O
0 Y m v�
V 0 O_
O
O O N
Q O t
m O
N Q N w
Z LL > -O ¢
7 N _ _
v -0 t m 3
O O h_a N t N
7
m 3 v E , . - o > v
= O > m 0 o +t+ N
o
m ° = a n S a c =
v ° = v_ 0Ti .� o O v c c t
'7 '= O
u N 0) ++
m t C m v -O E N' >
H 7 N U. _ cy N 0
°o 0 0 ° v 3 o o a= T bn
_ ° v x 0 Y 3 -E
tip -i O m O o v � o 0 O -= -a v
c = 3 0 Q � u 6 a 0 � v V
_ o c t o o O m w 00 0 t E
t v $ o ~ > 3 u = o c 3 ¢ ° 3
- 3 0 m CL ^ v
Y v ° ° ° v o N m to m t °CL a c ',- 0 E
CL
a= O to Vt - = N z = m N _ , - o o Y
7 t in O N N 3 O m N = _ .Lj N m
N O O 'O T at.., > ++ Y t p O m t V E hp J
`o v v ~ v ti m v c v t � w 3 3 t '� m > v v '= m
T o 0 0
c o m L ° m v = v 3 a= m c" m ° v t °p °_-°
E m u .cn o v v .�v E v 3 u o auCL
0) v O° v t u o oLL =x 3 t°o = = > v
t - m _ vy > m
o 3 0 ° c o o t Y v o E °° m t = v
_ .cn o to > v t m fl 3 v 0 v N o ~ v .S o ° E
o - 5 v 0 0 0 v m = m v o = o c cn v
v N 3 3 U. O o t � m v v o t v v v = >
o o o o m v LL v o v m 'cn o
'6 .^� N O m N T V v vi '6 m N in m K N +t+ -° vi t '6 K = O_
_ it+ 3 m i t V1 7 = to = m In -6 a, m
v = o o ° v _ = m m ° m v ° o o o To m m J > Q E
0 O t 3 V � C -6 O O > t 7 N N i V C N a� Z in m o J ~ N N
N m V N N in = E z o = in O V w 0 T '6 o -O N V w
O_ M
~ mO+
va>t0 cnLL o o0 -0 0 °
° V ¢ocn m
ot o vo , vti o °v a
co oo °V O 7 m _Cc C t t 0) ON _
0 mv
m
LL =
-O -O O 7 w o
E t o
N No
= L O
w Ev mo v ;
E m0m p =^ o v = v m= t~°O
V V O O E O E O 0 O Ea4- Qo
-0 E u 5 E O of > ti23
cON
O o a v
t> O o s v=°
= 0VY > qa m V
_ m mo E 'O N E O ha N E
O O V
v _ E o mo
-oa ° ° g 0) ai mE
t
p CO O m m O O = N C E m N �j to O ? m m
> o >, = O to 0 N = O O N O_ 7 O
'6 O 1010, t Vt O m E O Y m -0w m N K
z w M y '6 E J = pn V J J O o w N V
m ¢ v ^ o v - o V n O .o v v m m
N N j 0 mtin O in V N Y fl- O_ m t '6 N ha
x 0C14 o_ c=o .o E E -� a, 0 o p t v � � C- � m -
t E � o c
v cn o v c
iYN Mi b Nv 3 3 INt o hp m0 bn 0) v3 pt O- t N _°
n _ O Nu o N O 3p
° 0 ° E ° °
x N o
o ti
rn ti ti
to
to = s E
v v 2
O Y a 2 a Y
C m 7 O aL E 0
2
T O
a 3 v E t a E
bO 6 a)
o
2 O
GOO '6 m O Q -O ti
O
O 7 o m O '
o
c�o C7
N m m '2 E
Q �o b0
O Lc 7 u CL .yOy11 a)
a) E T C
Q Q a) Q
z w v 3 3 3 a m
m Q C
v bn
v V a ° `o o
mt 3 E -0 m a) .= � — m
coo o '�+ 3 .b x Q a) 0) a m 3 m
a O N 0 O N N \ 3 00 Y O -°p E
GO 0 p O GO O m
0
aj O a m O 0 '6 a)
T ac N a) — '6 0 p K
O b0 +T+ a a) O t j,
O O m m ++ O t 7 in a) +L+ i O 3
O m n O
Q O Q m a m u - m � L V 2
>, GO t O GOa a) a) Q
a) 0 O m O 3 OV C E O
a 00 0 00 0 t '0
bD -0 O N m
3 0 D os ¢ _ -°Q o
3 W m o C Cl
' a `o
+o Ci
Cl+ m > m
V O `j -Eo a
t O -O >
Q Q u c Q mu -0 - 3 0 a 3 Ln 2 m
p o a s c
'^ � � - o
m
m � m v E o '> 3 °p m to c Q a) E
O ++ a) a O 3 ++ t 00 i^ ti O O 0 .
wtc3Q N^N m v~N co
O
OO ` oE E if c ^ m cotwQo °
L=mm a Zo 3
m w w — m E C C>m3GL
a Ga > m b0 O a O 0 O >p'
E 0 0 a) O O Vo GO Q
YJamQ
bb O � m o 'OOO K3 Q
O a ? cc V
0 v 0O = m c v z m o
a O_ w *p -Q E L a >
° a m - O
E E a o_0
O N E Y - , TK O o -6+ amTm
3 -0 > t a T ,E Q t d o .� a m m o m E ELv m E a c
m L -Q 'in a) O N N 7 7 O t O T t m in N m m O m O ++ v
v < bn c z � L^ m ° s m ° a ' 3 n m 0) Z u v 3 - o
v Tat E m o ' m y .S ° = Ga a �' 3 V v
3 v > E ° o m m V c $ — o m ° N + v O s p
O O a) a) fi E t O J N 'C N a) O a) `~ Y O m W GO '6 GO 7 a)
Lf1 m Q O > > >' m O C .V .� QO m Y
t Ol t >, > O t m O p t O m V O 7 m m Gn 0 V t a) m O
ti V 0 > 3 J z x a) s m o �2 n E 3 'o J E m Y m K
t 6 O O T
m o u _
E V L >O y = b0
O D Z bn in = E O
J V a) 0 O O O V1
N 0 7 { a L O
0
O \ a a Obn
E O
m L a) C N 7 L E O
0 +o O v V
K J W t V K O Q_ a v -O
O
m a) 0 3 a) m j O 'J
J c a
v 0 t > C N V ° O
V
E o - °
to '6 2 a) N ,M
a E
E F- Q- o 3 °
Y m M1 -0 � OQ
io > Q 'O ° T C
r 0 � — m m 7 E
T a)
a
O O. t a) N T N
3 o 3
2 2 -0 J Z Q ti
N M �
c-I c-I c-I
Synchro Analysis Worksheets
HCM 6th TWSC 2024 AM With Project
6: Route 11 & Kuakini Street 11/29/2022
Intersection
Int Delay,s/veh 10.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r t t r
Traffic Vol,veh/h 0 159 604 914 905 0
Future Vol,veh/h 0 159 604 914 905 0
Conflicting Peds,#/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Free - None Yield
Storage Length 160 0 630 - 700
Veh in Median Storage,# 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 93 93 93 93 93 93
Heavy Vehicles, % 2 4 2 5 5 7
Mvmt Flow 0 171 649 983 973 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 3254 - 973 0 0
Stage 1 973
Stage 2 2281
Critical Hdwy 6.42 4.12
Critical Hdwy Stg 1 5.42 -
Critical Hdwy Stg 2 5.42 -
Follow-up Hdwy 3.518 2.218
Pot Cap-1 Maneuver 10 0 709
Stage 1 366 0 -
Stage 2 82 0 -
Platoon blocked, %
Mov Cap-1 Maneuver 1 - 709
Mov Cap-2 Maneuver 1
Stage 1 31
Stage 2 82
Approach EB NB SB
HCM Control Delay,s 0 16.2 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity(veh/h) 709
HCM Lane V/C Ratio 0.916
HCM Control Delay(s) 40.7 0 0
HCM Lane LOS E A A
HCM 95th %tile Q(veh) 12.3
5:00 pm Baseline Synchro 10 Report
Page 6
HCM 6th Signalized Intersection Summary 2024 AM With Project
7: Route 11 & Lako Street /Lako Street 1I11/29/2022
--1. .4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 281 48 69 88 40 301 33 927 55 160 769 142
Future Volume(veh/h) 281 48 69 88 40 301 33 927 55 160 769 142
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1870 1870 1870 1856 1870 1870 1870 1870 1841 1811 1856 1870
Adj Flow Rate,veh/h 299 51 0 94 43 0 35 986 0 170 818 0
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 2 2 2 3 2 2 2 2 4 6 3 2
Cap,veh/h 317 333 123 131 284 1058 194 1104
Arrive On Green 0.18 0.18 0.00 0.07 0.07 0.00 0.03 0.57 0.00 0.06 0.60 0.00
Sat Flow,veh/h 1781 1870 0 1767 1870 0 1781 1870 1560 1725 1856 1585
Grp Volume(v),veh/h 299 51 0 94 43 0 35 986 0 170 818 0
Grp Sat Flow(s),veh/h/In 1781 1870 0 1767 1870 0 1781 1870 1560 1725 1856 1585
Q Serve(g_s),s 22.9 3.2 0.0 7.2 3.0 0.0 1.1 66.7 0.0 5.6 44.0 0.0
Cycle Q Clear(g_c),s 22.9 3.2 0.0 7.2 3.0 0.0 1.1 66.7 0.0 5.6 44.0 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 317 333 123 131 284 1058 194 1104
V/C Ratio(X) 0.94 0.15 0.76 0.33 0.12 0.93 0.88 0.74
Avail Cap(c_a),veh/h 317 333 263 278 301 1058 224 1104
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 56.0 47.9 0.0 63.0 61.0 0.0 17.8 27.5 0.0 32.0 20.2 0.0
Incr Delay(d2),s/veh 36.0 0.2 0.0 9.3 1.5 0.0 0.2 15.4 0.0 27.6 4.5 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 13.4 1.5 0.0 3.6 1.5 0.0 0.5 33.2 0.0 4.7 19.8 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 92.0 48.1 0.0 72.3 62.5 0.0 18.0 42.9 0.0 59.6 24.7 0.0
LnGrp LOS F D E E B D E C
Approach Vol,veh/h 350 137 1021 988
Approach Delay,s/veh 85.6 69.2 42.0 30.7
Approach LOS F E D C
Timer-Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc),s 12.2 82.5 29.0 8.2 86.5 14.1
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 10.1 76.9 24.5 5.0 82.0 20.5
Max Q Clear Time(g_c+I1),s 7.6 68.7 24.9 3.1 46.0 9.2
Green Ext Time(p-c),s 0.1 4.6 0.0 0.0 7.4 0.3
Intersection Summary
HCM 6th Ctrl Delay 45.1
HCM 6th LOS D
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 7
HCM 6th TWSC 2024 AM With Project
9: Route 11 & Royal Vistas 11/29/2022
Intersection
Int Delay,s/veh 0.7
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations r t r t
Traffic Vol,veh/h 0 61 914 14 13 903
Future Vol,veh/h 0 61 914 14 13 903
Conflicting Peds,#/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Yield Yield - None
Storage Length 0 0 500 500 -
Veh in Median Storage,# 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 66 993 15 14 982
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 2003 993 0 0 993 0
Stage 1 993 - - - - -
Stage 2 1010 - -
Critical Hdwy 6.42 6.22 4.12
Critical Hdwy Stg 1 5.42 - -
Critical Hdwy Stg 2 5.42 - -
Follow-up Hdwy 3.518 3.318 2.218
Pot Cap-1 Maneuver 66 298 696
Stage 1 359 - -
Stage 2 352 - -
Platoon blocked, %
Mov Cap-1 Maneuver 65 298 696
Mov Cap-2 Maneuver 65 - -
Stage 1 359
Stage 2 345
Approach WB NB SB
HCM Control Delay,s 20.5 0 0.1
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity(veh/h) 298 696
HCM Lane V/C Ratio 0.222 0.02
HCM Control Delay(s) 0 20.5 10.3
HCM Lane LOS A C B
HCM 95th %tile Q(veh) 0.8 0.1
5:00 pm Baseline Synchro 10 Report
Page 9
HCM 6th TWSC 2024 PM With Project
6: Route 11 & Kuakini Street 11/29/2022
Intersection
Int Delay,s/veh 2.6
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r t t r
Traffic Vol,veh/h 0 325 340 979 1109 0
Future Vol,veh/h 0 325 340 979 1109 0
Conflicting Peds,#/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Free - None Yield
Storage Length 160 0 630 - 700
Veh in Median Storage,# 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 8 2 2 3 2 6
Mvmt Flow 0 332 347 999 1132 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 2825 - 1132 0 0
Stage 1 1132
Stage 2 1693
Critical Hdwy 6.48 4.12
Critical Hdwy Stg 1 5.48 -
Critical Hdwy Stg 2 5.48 -
Follow-up Hdwy 3.572 2.218
Pot Cap-1 Maneuver 19 0 617
Stage 1 299 0 -
Stage 2 158 0 -
Platoon blocked, %
Mov Cap-1 Maneuver 8 - 617
Mov Cap-2 Maneuver 8
Stage 1 131
Stage 2 158
Approach EB NB SB
HCM Control Delay,s 0 4.7 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity(veh/h) 617
HCM Lane V/C Ratio 0.562
HCM Control Delay(s) 18.1 0 0
HCM Lane LOS C A A
HCM 95th %tile Q(veh) 3.5
5:00 pm Baseline Synchro 10 Report
Page 6
HCM 6th Signalized Intersection Summary 2024 PM With Project
7: Route 11 & Lako Street /Lako Street 1I11/29/2022
--1. .4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 148 30 48 70 41 225 37 917 64 200 1015 188
Future Volume(veh/h) 148 30 48 70 41 225 37 917 64 200 1015 188
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1841 1870 1870 1870 1826 1826 1856 1856 1870 1856 1870 1870
Adj Flow Rate,veh/h 154 31 0 73 43 0 39 955 0 208 1057 0
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 4 2 2 2 5 5 3 3 2 3 2 2
Cap,veh/h 183 195 102 105 229 1174 304 1237
Arrive On Green 0.10 0.10 0.00 0.06 0.06 0.00 0.03 0.63 0.00 0.06 0.66 0.00
Sat Flow,veh/h 1753 1870 0 1781 1826 0 1767 1856 1585 1767 1870 1585
Grp Volume(v),veh/h 154 31 0 73 43 0 39 955 0 208 1057 0
Grp Sat Flow(s),veh/h/In 1753 1870 0 1781 1826 0 1767 1856 1585 1767 1870 1585
Q Serve(g_s),s 10.6 1.8 0.0 4.9 2.8 0.0 0.9 47.7 0.0 4.9 53.9 0.0
Cycle Q Clear(g_c),s 10.6 1.8 0.0 4.9 2.8 0.0 0.9 47.7 0.0 4.9 53.9 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 183 195 102 105 229 1174 304 1237
V/C Ratio(X) 0.84 0.16 0.71 0.41 0.17 0.81 0.68 0.85
Avail Cap(c_a),veh/h 258 275 262 268 248 1174 381 1237
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 53.9 50.0 0.0 56.7 55.7 0.0 18.3 17.0 0.0 21.4 16.2 0.0
Incr Delay(d2),s/veh 15.8 0.4 0.0 8.8 2.5 0.0 0.3 6.2 0.0 3.6 7.7 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 5.5 0.9 0.0 2.5 1.4 0.0 0.5 21.0 0.0 3.7 23.7 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 69.6 50.3 0.0 65.6 58.3 0.0 18.7 23.3 0.0 25.0 23.8 0.0
LnGrp LOS E D E E B C C C
Approach Vol,veh/h 185 116 994 1265
Approach Delay,s/veh 66.4 62.9 23.1 24.0
Approach LOS E E C C
Timer-Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc),s 11.7 82.0 17.3 8.2 85.5 11.5
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 12.5 73.5 18.0 5.0 81.0 18.0
Max Q Clear Time(g_c+I1),s 6.9 49.7 12.6 2.9 55.9 6.9
Green Ext Time(p-c),s 0.3 8.5 0.3 0.0 10.3 0.2
Intersection Summary
HCM 6th Ctrl Delay 28.5
HCM 6th LOS C
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 7
HCM 6th TWSC 2024 PM With Project
9: Route 11 & Royal Vistas 11/29/2022
Intersection
Int Delay,s/veh 0.6
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations r t r t
Traffic Vol,veh/h 0 39 979 41 45 1067
Future Vol,veh/h 0 39 979 41 45 1067
Conflicting Peds,#/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None None - None
Storage Length 0 0 500 500 -
Veh in Median Storage,# 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 42 1064 45 49 1160
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 2322 1064 0 0 1109 0
Stage 1 1064 - - - - -
Stage 2 1258 - -
Critical Hdwy 6.42 6.22 4.12
Critical Hdwy Stg 1 5.42 - -
Critical Hdwy Stg 2 5.42 - -
Follow-up Hdwy 3.518 3.318 2.218
Pot Cap-1 Maneuver 41 271 630
Stage 1 332 - -
Stage 2 268 - -
Platoon blocked, %
Mov Cap-1 Maneuver 38 271 630
Mov Cap-2 Maneuver 38 - -
Stage 1 332
Stage 2 247
Approach WB NB SB
HCM Control Delay,s 20.7 0 0.5
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity(veh/h) 271 630
HCM Lane V/C Ratio 0.156 0.078
HCM Control Delay(s) 0 20.7 11.2
HCM Lane LOS A C B
HCM 95th %tile Q(veh) 0.5 0.3
5:00 pm Baseline Synchro 10 Report
Page 9
HCM 6th TWSC 2029 AM With Project
6: Route 11 & Kuakini Street 11/29/2022
Intersection
Int Delay,s/veh 11.9
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r t t r
Traffic Vol,veh/h 0 159 608 968 945 0
Future Vol,veh/h 0 159 608 968 945 0
Conflicting Peds,#/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Free - None Yield
Storage Length 160 0 630 - 700
Veh in Median Storage,# 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 93 93 93 93 93 93
Heavy Vehicles, % 2 4 2 5 5 7
Mvmt Flow 0 171 654 1041 1016 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 3365 - 1016 0 0
Stage 1 1016
Stage 2 2349
Critical Hdwy 6.42 4.12
Critical Hdwy Stg 1 5.42 -
Critical Hdwy Stg 2 5.42 -
Follow-up Hdwy 3.518 2.218
Pot Cap-1 Maneuver 9 0 683
Stage 1 350 0 -
Stage 2 76 0 -
Platoon blocked, %
Mov Cap-1 Maneuver 0 - 683
Mov Cap-2 Maneuver 0
Stage 1 15
Stage 2 76
Approach EB NB SB
HCM Control Delay,s 0 19 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity(veh/h) 683
HCM Lane V/C Ratio 0.957
HCM Control Delay(s) 49.3 0 0
HCM Lane LOS E A A
HCM 95th %tile Q(veh) 13.9
5:00 pm Baseline Synchro 10 Report
Page 6
HCM 6th Signalized Intersection Summary 2029 AM With Project
7: Route 11 & Lako Street /Lako Street 1I11/29/2022
--1. .4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 283 48 69 103 43 307 33 976 55 160 804 142
Future Volume(veh/h) 283 48 69 103 43 307 33 976 55 160 804 142
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1870 1870 1870 1856 1870 1870 1870 1870 1841 1811 1856 1870
Adj Flow Rate,veh/h 301 51 0 110 46 0 35 1038 0 170 855 0
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 2 2 2 3 2 2 2 2 4 6 3 2
Cap,veh/h 290 305 140 148 263 1056 164 1102
Arrive On Green 0.16 0.16 0.00 0.08 0.08 0.00 0.03 0.56 0.00 0.06 0.59 0.00
Sat Flow,veh/h 1781 1870 0 1767 1870 0 1781 1870 1560 1725 1856 1585
Grp Volume(v),veh/h 301 51 0 110 46 0 35 1038 0 170 855 0
Grp Sat Flow(s),veh/h/In 1781 1870 0 1767 1870 0 1781 1870 1560 1725 1856 1585
Q Serve(g_s),s 21.5 3.1 0.0 8.1 3.1 0.0 1.1 71.7 0.0 7.5 45.8 0.0
Cycle Q Clear(g_c),s 21.5 3.1 0.0 8.1 3.1 0.0 1.1 71.7 0.0 7.5 45.8 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 290 305 140 148 263 1056 164 1102
V/C Ratio(X) 1.04 0.17 0.78 0.31 0.13 0.98 1.04 0.78
Avail Cap(c_a),veh/h 290 305 248 262 282 1056 164 1102
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 55.2 47.5 0.0 59.6 57.3 0.0 18.2 28.1 0.0 41.1 20.2 0.0
Incr Delay(d2),s/veh 62.8 0.3 0.0 9.2 1.2 0.0 0.2 23.9 0.0 80.5 5.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 14.7 1.5 0.0 4.0 1.5 0.0 0.4 37.5 0.0 9.1 20.7 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 118.1 47.8 0.0 68.9 58.5 0.0 18.5 52.0 0.0 121.6 25.5 0.0
LnGrp LOS F D E E B D F C
Approach Vol,veh/h 352 156 1073 1025
Approach Delay,s/veh 107.9 65.8 50.9 41.5
Approach LOS F E D D
Timer-Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc),s 12.0 79.0 26.0 8.1 82.9 15.0
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 7.5 74.5 21.5 5.0 77.0 18.5
Max Q Clear Time(g_c+I1),s 9.5 73.7 23.5 3.1 47.8 10.1
Green Ext Time(p-c),s 0.0 0.6 0.0 0.0 7.6 0.3
Intersection Summary
HCM 6th Ctrl Delay 55.8
HCM 6th LOS E
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 7
HCM 6th TWSC 2029 AM With Project
9: Route 11 & Royal Vistas 11/29/2022
Intersection
Int Delay,s/veh 1.5
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations r t r t
Traffic Vol,veh/h 0 108 968 25 22 950
Future Vol,veh/h 0 108 968 25 22 950
Conflicting Peds,#/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Yield Yield - None
Storage Length 0 0 500 500 -
Veh in Median Storage,# 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 117 1052 27 24 1033
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 2133 1052 0 0 1052 0
Stage 1 1052 - - - - -
Stage 2 1081 - -
Critical Hdwy 6.42 6.22 4.12
Critical Hdwy Stg 1 5.42 - -
Critical Hdwy Stg 2 5.42 - -
Follow-up Hdwy 3.518 3.318 2.218
Pot Cap-1 Maneuver 54 275 662
Stage 1 336 - -
Stage 2 326 - -
Platoon blocked, %
Mov Cap-1 Maneuver 52 275 662
Mov Cap-2 Maneuver 52 - -
Stage 1 336
Stage 2 314
Approach WB NB SB
HCM Control Delay,s 27.5 0 0.2
HCM LOS D
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity(veh/h) 275 662
HCM Lane V/C Ratio 0.427 0.036
HCM Control Delay(s) 0 27.5 10.6
HCM Lane LOS A D B
HCM 95th %tile Q(veh) 2 0.1
5:00 pm Baseline Synchro 10 Report
Page 9
HCM 6th TWSC 2029 PM With Project
6: Route 11 & Kuakini Street 11/29/2022
Intersection
Int Delay,s/veh 2.6
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r t t r
Traffic Vol,veh/h 0 325 341 1056 1157 0
Future Vol,veh/h 0 325 341 1056 1157 0
Conflicting Peds,#/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Free - None Yield
Storage Length 160 0 630 - 700
Veh in Median Storage,# 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 8 2 2 3 2 6
Mvmt Flow 0 332 348 1078 1181 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 2955 - 1181 0 0
Stage 1 1181
Stage 2 1774
Critical Hdwy 6.48 4.12
Critical Hdwy Stg 1 5.48 -
Critical Hdwy Stg 2 5.48 -
Follow-up Hdwy 3.572 2.218
Pot Cap-1 Maneuver 15 0 591
Stage 1 283 0 -
Stage 2 144 0 -
Platoon blocked, %
Mov Cap-1 Maneuver 6 - 591
Mov Cap-2 Maneuver 6
Stage 1 116
Stage 2 144
Approach EB NB SB
HCM Control Delay,s 0 4.7 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity(veh/h) 591
HCM Lane V/C Ratio 0.589
HCM Control Delay(s) 19.4 0 0
HCM Lane LOS C A A
HCM 95th %tile Q(veh) 3.8
5:00 pm Baseline Synchro 10 Report
Page 6
HCM 6th Signalized Intersection Summary 2029 PM With Project
7: Route 11 & Lako Street /Lako Street 1I11/29/2022
--1. .4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 152 30 48 77 42 233 37 981 64 200 1062 188
Future Volume(veh/h) 152 30 48 77 42 233 37 981 64 200 1062 188
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1841 1870 1870 1870 1826 1826 1856 1856 1870 1856 1870 1870
Adj Flow Rate,veh/h 158 31 0 80 44 0 39 1022 0 208 1106 0
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 4 2 2 2 5 5 3 3 2 3 2 2
Cap,veh/h 184 196 107 110 205 1199 268 1259
Arrive On Green 0.10 0.10 0.00 0.06 0.06 0.00 0.03 0.65 0.00 0.06 0.67 0.00
Sat Flow,veh/h 1753 1870 0 1781 1826 0 1767 1856 1585 1767 1870 1585
Grp Volume(v),veh/h 158 31 0 80 44 0 39 1022 0 208 1106 0
Grp Sat Flow(s),veh/h/In 1753 1870 0 1781 1826 0 1767 1856 1585 1767 1870 1585
Q Serve(g_s),s 12.0 2.0 0.0 6.0 3.1 0.0 1.0 58.7 0.0 5.2 63.9 0.0
Cycle Q Clear(g_c),s 12.0 2.0 0.0 6.0 3.1 0.0 1.0 58.7 0.0 5.2 63.9 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 184 196 107 110 205 1199 268 1259
V/C Ratio(X) 0.86 0.16 0.75 0.40 0.19 0.85 0.78 0.88
Avail Cap(c_a),veh/h 233 249 237 243 220 1199 346 1259
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 59.5 55.1 0.0 62.5 61.2 0.0 21.9 18.8 0.0 27.4 17.7 0.0
Incr Delay(d2),s/veh 21.9 0.4 0.0 9.8 2.3 0.0 0.4 7.8 0.0 8.1 8.9 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 6.5 1.0 0.0 3.0 1.5 0.0 0.6 26.3 0.0 5.1 28.5 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 81.4 55.4 0.0 72.3 63.5 0.0 22.3 26.6 0.0 35.5 26.5 0.0
LnGrp LOS F E E E C C D C
Approach Vol,veh/h 189 124 1061 1314
Approach Delay,s/veh 77.2 69.1 26.5 28.0
Approach LOS E E C C
Timer-Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc),s 12.0 91.8 18.7 8.3 95.5 12.6
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 13.5 82.5 18.0 5.0 91.0 18.0
Max Q Clear Time(g_c+I1),s 7.2 60.7 14.0 3.0 65.9 8.0
Green Ext Time(p-c),s 0.3 9.1 0.2 0.0 11.2 0.3
Intersection Summary
HCM 6th Ctrl Delay 32.7
HCM 6th LOS C
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 7
HCM 6th TWSC 2029 PM With Project
9: Route 11 & Royal Vistas 11/29/2022
Intersection
Int Delay,s/veh 1.1
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations r t r t
Traffic Vol,veh/h 0 68 1056 74 79 1151
Future Vol,veh/h 0 68 1056 74 79 1151
Conflicting Peds,#/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None None - None
Storage Length 0 0 500 500 -
Veh in Median Storage,# 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 74 1148 80 86 1251
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 2571 1148 0 0 1228 0
Stage 1 1148 - - - - -
Stage 2 1423 - -
Critical Hdwy 6.42 6.22 4.12
Critical Hdwy Stg 1 5.42 - -
Critical Hdwy Stg 2 5.42 - -
Follow-up Hdwy 3.518 3.318 2.218
Pot Cap-1 Maneuver 29 242 568
Stage 1 302 - -
Stage 2 222 - -
Platoon blocked, %
Mov Cap-1 Maneuver 25 242 568
Mov Cap-2 Maneuver 25 - -
Stage 1 302
Stage 2 188
Approach WB NB SB
HCM Control Delay,s 26.3 0 0.8
HCM LOS D
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity(veh/h) 242 568
HCM Lane V/C Ratio 0.305 0.151
HCM Control Delay(s) 0 26.3 12.5
HCM Lane LOS A D B
HCM 95th %tile Q(veh) 1.2 0.5
5:00 pm Baseline Synchro 10 Report
Page 9
HCM 6th TWSC 2039 PM With Project
6: Route 11 & Kuakini Street 11/29/2022
Intersection
Int Delay,s/veh 2.8
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r t t r
Traffic Vol,veh/h 0 325 341 1155 1259 0
Future Vol,veh/h 0 325 341 1155 1259 0
Conflicting Peds,#/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Free - None Yield
Storage Length 160 0 630 - 700
Veh in Median Storage,# 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 8 2 2 3 2 6
Mvmt Flow 0 332 348 1179 1285 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 3160 - 1285 0 0
Stage 1 1285
Stage 2 1875
Critical Hdwy 6.48 4.12
Critical Hdwy Stg 1 5.48 -
Critical Hdwy Stg 2 5.48 -
Follow-up Hdwy 3.572 2.218
Pot Cap-1 Maneuver 11 0 540
Stage 1 252 0 -
Stage 2 128 0 -
Platoon blocked, %
Mov Cap-1 Maneuver 4 - 540
Mov Cap-2 Maneuver 4
Stage 1 90
Stage 2 128
Approach EB NB SB
HCM Control Delay,s 0 5.2 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity(veh/h) 540
HCM Lane V/C Ratio 0.644
HCM Control Delay(s) 22.9 0 0
HCM Lane LOS C A A
HCM 95th %tile Q(veh) 4.6
5:00 pm Baseline Synchro 10 Report
Page 6
HCM 6th Signalized Intersection Summary 2039 PM With Project
7: Route 11 & Lako Street /Lako Street 1I11/29/2022
--1. .4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 152 30 48 77 42 233 37 1068 64 200 1163 188
Future Volume(veh/h) 152 30 48 77 42 233 37 1068 64 200 1163 188
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1841 1870 1870 1870 1826 1826 1856 1856 1870 1856 1870 1870
Adj Flow Rate,veh/h 158 31 0 80 44 0 39 1112 0 208 1211 0
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 4 2 2 2 5 5 3 3 2 3 2 2
Cap,veh/h 184 196 107 110 138 1135 230 1263
Arrive On Green 0.10 0.10 0.00 0.06 0.06 0.00 0.03 0.61 0.00 0.09 0.68 0.00
Sat Flow,veh/h 1753 1870 0 1781 1826 0 1767 1856 1585 1767 1870 1585
Grp Volume(v),veh/h 158 31 0 80 44 0 39 1112 0 208 1211 0
Grp Sat Flow(s),veh/h/In 1753 1870 0 1781 1826 0 1767 1856 1585 1767 1870 1585
Q Serve(g_s),s 12.1 2.1 0.0 6.0 3.2 0.0 1.1 79.3 0.0 10.6 81.5 0.0
Cycle Q Clear(g_c),s 12.1 2.1 0.0 6.0 3.2 0.0 1.1 79.3 0.0 10.6 81.5 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 184 196 107 110 138 1135 230 1263
V/C Ratio(X) 0.86 0.16 0.75 0.40 0.28 0.98 0.90 0.96
Avail Cap(c_a),veh/h 231 247 235 241 153 1135 230 1263
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 60.1 55.6 0.0 63.1 61.8 0.0 30.3 25.7 0.0 46.6 20.4 0.0
Incr Delay(d2),s/veh 22.5 0.4 0.0 9.9 2.3 0.0 1.1 22.3 0.0 34.6 17.3 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 6.5 1.0 0.0 3.0 1.5 0.0 0.8 39.9 0.0 6.6 38.5 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 82.6 56.0 0.0 73.0 64.1 0.0 31.4 47.9 0.0 81.2 37.7 0.0
LnGrp LOS F E E E C D F D
Approach Vol,veh/h 189 124 1151 1419
Approach Delay,s/veh 78.2 69.8 47.4 44.1
Approach LOS E E D D
Timer-Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc),s 17.0 88.0 18.8 8.4 96.6 12.7
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 12.5 83.5 18.0 5.0 91.0 18.0
Max Q Clear Time(g_c+I1),s 12.6 81.3 14.1 3.1 83.5 8.0
Green Ext Time(p-c),s 0.0 1.7 0.2 0.0 5.4 0.3
Intersection Summary
HCM 6th Ctrl Delay 48.7
HCM 6th LOS D
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 7
HCM 6th TWSC 2039 PM With Project
9: Route 11 & Royal Vistas 11/29/2022
Intersection
Int Delay,s/veh 1.2
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations r t r t
Traffic Vol,veh/h 0 68 1155 74 79 1255
Future Vol,veh/h 0 68 1155 74 79 1255
Conflicting Peds,#/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None None - None
Storage Length 0 0 500 500 -
Veh in Median Storage,# 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 74 1255 80 86 1364
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 2791 1255 0 0 1335 0
Stage 1 1255 - - - - -
Stage 2 1536 - -
Critical Hdwy 6.42 6.22 4.12
Critical Hdwy Stg 1 5.42 - -
Critical Hdwy Stg 2 5.42 - -
Follow-up Hdwy 3.518 3.318 2.218
Pot Cap-1 Maneuver 21 209 517
Stage 1 268 - -
Stage 2 196 - -
Platoon blocked, %
Mov Cap-1 Maneuver 18 209 517
Mov Cap-2 Maneuver 18 - -
Stage 1 268
Stage 2 163
Approach WB NB SB
HCM Control Delay,s 31.4 0 0.8
HCM LOS D
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity(veh/h) 209 517
HCM Lane V/C Ratio 0.354 0.166
HCM Control Delay(s) 0 31.4 13.3
HCM Lane LOS A D B
HCM 95th %tile Q(veh) 1.5 0.6
5:00 pm Baseline Synchro 10 Report
Page 9
HCM 6th TWSC 2039 AM With Project
6: Route 11 & Kuakini Street 11/29/2022
Intersection
Int Delay,s/veh 16
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r t t r
Traffic Vol,veh/h 0 159 608 1060 1029 0
Future Vol,veh/h 0 159 608 1060 1029 0
Conflicting Peds,#/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Free - None Yield
Storage Length 160 0 630 - 700
Veh in Median Storage,# 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 93 93 93 93 93 93
Heavy Vehicles, % 2 4 2 5 5 7
Mvmt Flow 0 171 654 1140 1106 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 3554 - 1106 0 0
Stage 1 1106
Stage 2 2448
Critical Hdwy 6.42 4.12
Critical Hdwy Stg 1 5.42 -
Critical Hdwy Stg 2 5.42 -
Follow-up Hdwy 3.518 2.218
Pot Cap-1 Maneuver 6 0 —631
Stage 1 317 0 -
Stage 2 68 0 -
Platoon blocked, %
Mov Cap-1 Maneuver 0 - —631
Mov Cap-2 Maneuver 0
Stage 1 0
Stage 2 68
Approach EB NB SB
HCM Control Delay,s 0 25.9 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity(veh/h) —631
HCM Lane V/C Ratio 1.036
HCM Control Delay(s) 71 0 0
HCM Lane LOS F A A
HCM 95th %tile Q(veh) 17.1
Notes
-:Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *:All major volume in platoon
5:00 pm Baseline Synchro 10 Report
Page 6
HCM 6th Signalized Intersection Summary 2039 AM With Project
7: Route 11 & Lako Street /Lako Street 1I11/29/2022
--1. .4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 283 48 69 103 43 307 33 1067 55 160 878 142
Future Volume(veh/h) 283 48 69 103 43 307 33 1067 55 160 878 142
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1870 1870 1870 1856 1870 1870 1870 1870 1841 1811 1856 1870
Adj Flow Rate,veh/h 301 51 0 110 46 0 35 1135 0 170 934 0
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 2 2 2 3 2 2 2 2 4 6 3 2
Cap,veh/h 285 299 139 147 223 1085 143 1126
Arrive On Green 0.16 0.16 0.00 0.08 0.08 0.00 0.03 0.58 0.00 0.05 0.61 0.00
Sat Flow,veh/h 1781 1870 0 1767 1870 0 1781 1870 1560 1725 1856 1585
Grp Volume(v),veh/h 301 51 0 110 46 0 35 1135 0 170 934 0
Grp Sat Flow(s),veh/h/In 1781 1870 0 1767 1870 0 1781 1870 1560 1725 1856 1585
Q Serve(g_s),s 22.5 3.3 0.0 8.6 3.3 0.0 1.1 81.5 0.0 7.5 56.0 0.0
Cycle Q Clear(g_c),s 22.5 3.3 0.0 8.6 3.3 0.0 1.1 81.5 0.0 7.5 56.0 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 285 299 139 147 223 1085 143 1126
V/C Ratio(X) 1.06 0.17 0.79 0.31 0.16 1.05 1.19 0.83
Avail Cap(c_a),veh/h 285 299 258 273 239 1085 143 1126
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 59.0 51.0 0.0 63.6 61.2 0.0 21.4 29.5 0.0 47.2 21.9 0.0
Incr Delay(d2),s/veh 68.6 0.3 0.0 9.7 1.2 0.0 0.3 40.3 0.0 134.0 7.1 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 15.6 1.6 0.0 4.3 1.6 0.0 0.5 47.1 0.0 10.5 25.7 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 127.7 51.2 0.0 73.3 62.4 0.0 21.7 69.8 0.0 181.2 29.0 0.0
LnGrp LOS F D E E C F F C
Approach Vol,veh/h 352 156 1170 1104
Approach Delay,s/veh 116.6 70.1 68.4 52.4
Approach LOS F E E D
Timer-Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc),s 12.0 86.0 27.0 8.2 89.8 15.5
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 7.5 81.5 22.5 5.0 84.0 20.5
Max Q Clear Time(g_c+I1),s 9.5 83.5 24.5 3.1 58.0 10.6
Green Ext Time(p-c),s 0.0 0.0 0.0 0.0 8.5 0.3
Intersection Summary
HCM 6th Ctrl Delay 68.2
HCM 6th LOS E
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 7
HCM 6th TWSC 2039 AM With Project
9: Route 11 & Royal Vistas 11/29/2022
Intersection
Int Delay,s/veh 1.7
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations r t r t
Traffic Vol,veh/h 0 108 1060 25 22 1033
Future Vol,veh/h 0 108 1060 25 22 1033
Conflicting Peds,#/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Yield Yield - None
Storage Length 0 0 500 500 -
Veh in Median Storage,# 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 117 1152 27 24 1123
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 2323 1152 0 0 1152 0
Stage 1 1152 - - - - -
Stage 2 1171 - -
Critical Hdwy 6.42 6.22 4.12
Critical Hdwy Stg 1 5.42 - -
Critical Hdwy Stg 2 5.42 - -
Follow-up Hdwy 3.518 3.318 2.218
Pot Cap-1 Maneuver 41 241 606
Stage 1 301 - -
Stage 2 295 - -
Platoon blocked, %
Mov Cap-1 Maneuver 39 241 606
Mov Cap-2 Maneuver 39 - -
Stage 1 301
Stage 2 283
Approach WB NB SB
HCM Control Delay,s 33.3 0 0.2
HCM LOS D
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity(veh/h) 241 606
HCM Lane V/C Ratio 0.487 0.039
HCM Control Delay(s) 0 33.3 11.2
HCM Lane LOS A D B
HCM 95th %tile Q(veh) 2.5 0.1
5:00 pm Baseline Synchro 10 Report
Page 9
HCM 6th Signalized Intersection Summary 2024 AM With Project Kuakini Protected
6: Route 11 & Kuakini Street II 12/07/2022
t t
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r t + r
Traffic Volume(veh/h) 0 159 604 914 905 0
Future Volume(veh/h) 0 159 604 914 905 0
Initial Q(Qb),veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow,veh/h/In 1870 1841 1870 1826 1826 1796
Adj Flow Rate,veh/h 0 0 649 983 973 0
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 2 4 2 5 5 7
Cap,veh/h 1 664 1761 1017
Arrive On Green 0.00 0.00 0.37 0.96 0.56 0.00
Sat Flow,veh/h 1781 1560 1781 1826 1826 1522
Grp Volume(v),veh/h 0 0 649 983 973 0
Grp Sat Flow(s),veh/h/In 1781 1560 1781 1826 1826 1522
Q Serve(g_s),s 0.0 0.0 45.9 5.2 64.5 0.0
Cycle Q Clear(g_c),s 0.0 0.0 45.9 5.2 64.5 0.0
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 1 664 1761 1017
V/C Ratio(X) 0.00 0.98 0.56 0.96
Avail Cap(c_a),veh/h 251 664 1761 1017
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 0.00 1.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 0.0 0.0 39.5 0.2 26.8 0.0
Incr Delay(d2),s/veh 0.0 0.0 29.4 1.3 19.6 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 0.0 0.0 25.1 0.6 32.2 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 0.0 0.0 68.8 1.5 46.4 0.0
LnGrp LOS A E A D
Approach Vol,veh/h 0 1632 973
Approach Delay,s/veh 0.0 28.2 46.4
Approach LOS C D
Timer-Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc),s 127.5 0.0 52.0 75.5
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 123.0 18.0 47.5 71.0
Max Q Clear Time(g_c+I1),s 7.2 0.0 47.9 66.5
Green Ext Time(p-c),s 11.6 0.0 0.0 2.8
Intersection Summary
HCM 6th Ctrl Delay 35.0
HCM 6th LOS D
Notes
Unsignalized Delay for[EBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2024 PM With Project Kuakini Protected
6: Route 11 & Kuakini Street II 12/07/2022
t t
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r t + r
Traffic Volume(veh/h) 0 325 340 979 1109 0
Future Volume(veh/h) 0 325 340 979 1109 0
Initial Q(Qb),veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow,veh/h/In 1781 1870 1870 1856 1870 1811
Adj Flow Rate,veh/h 0 0 347 999 1132 0
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 8 2 2 3 2 6
Cap,veh/h 1 373 1790 1347
Arrive On Green 0.00 0.00 0.21 0.96 0.72 0.00
Sat Flow,veh/h 1697 1585 1781 1856 1870 1535
Grp Volume(v),veh/h 0 0 347 999 1132 0
Grp Sat Flow(s),veh/h/In 1697 1585 1781 1856 1870 1535
Q Serve(g_s),s 0.0 0.0 24.4 5.2 54.7 0.0
Cycle Q Clear(g_c),s 0.0 0.0 24.4 5.2 54.7 0.0
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 1 373 1790 1347
V/C Ratio(X) 0.00 0.93 0.56 0.84
Avail Cap(c_a),veh/h 240 404 1790 1347
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 0.00 1.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 0.0 0.0 49.5 0.2 12.7 0.0
Incr Delay(d2),s/veh 0.0 0.0 27.1 1.3 6.5 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 0.0 0.0 13.6 0.6 22.5 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 0.0 0.0 76.6 1.4 19.1 0.0
LnGrp LOS A E A B
Approach Vol,veh/h 0 1346 1132
Approach Delay,s/veh 0.0 20.8 19.1
Approach LOS C B
Timer-Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc),s 127.5 0.0 31.2 96.3
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 123.0 18.0 28.9 89.6
Max Q Clear Time(g_c+I1),s 7.2 0.0 26.4 56.7
Green Ext Time(p-c),s 12.0 0.0 0.3 13.2
Intersection Summary
HCM 6th Ctrl Delay 20.0
HCM 6th LOS C
Notes
Unsignalized Delay for[EBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2024 AM With Project Kuakini Protected+Permitted
6: Route 11 & Kuakini Street II 12/07/2022
t t
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r t + r
Traffic Volume(veh/h) 0 159 604 914 905 0
Future Volume(veh/h) 0 159 604 914 905 0
Initial Q(Qb),veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow,veh/h/In 1870 1841 1870 1826 1826 1796
Adj Flow Rate,veh/h 0 0 649 983 973 0
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 2 4 2 5 5 7
Cap,veh/h 1 685 1761 1233
Arrive On Green 0.00 0.00 0.25 0.96 0.68 0.00
Sat Flow,veh/h 1781 1560 1781 1826 1826 1522
Grp Volume(v),veh/h 0 0 649 983 973 0
Grp Sat Flow(s),veh/h/In 1781 1560 1781 1826 1826 1522
Q Serve(g_s),s 0.0 0.0 28.4 5.2 47.3 0.0
Cycle Q Clear(g_c),s 0.0 0.0 28.4 5.2 47.3 0.0
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 1 685 1761 1233
V/C Ratio(X) 0.00 0.95 0.56 0.79
Avail Cap(c_a),veh/h 251 840 1761 1233
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 0.00 1.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 0.0 0.0 33.2 0.2 14.4 0.0
Incr Delay(d2),s/veh 0.0 0.0 17.5 1.3 5.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 0.0 0.0 22.6 0.6 19.7 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 0.0 0.0 50.8 1.5 19.6 0.0
LnGrp LOS A D A B
Approach Vol,veh/h 0 1632 973
Approach Delay,s/veh 0.0 21.1 19.6
Approach LOS C B
Timer-Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc),s 127.5 0.0 36.9 90.6
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 123.0 18.0 43.5 75.0
Max Q Clear Time(g_c+I1),s 7.2 0.0 30.4 49.3
Green Ext Time(p-c),s 11.6 0.0 2.0 9.1
Intersection Summary
HCM 6th Ctrl Delay 20.5
HCM 6th LOS C
Notes
Unsignalized Delay for[EBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2024 PM With Project Kuakini Protected+Permitted
6: Route 11 & Kuakini Street II 12/07/2022
t t
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r t + r
Traffic Volume(veh/h) 0 325 340 979 1109 0
Future Volume(veh/h) 0 325 340 979 1109 0
Initial Q(Qb),veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow,veh/h/In 1781 1870 1870 1856 1870 1811
Adj Flow Rate,veh/h 0 0 347 999 1132 0
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 8 2 2 3 2 6
Cap,veh/h 1 484 1784 1647
Arrive On Green 0.00 0.00 0.04 0.96 0.88 0.00
Sat Flow,veh/h 1697 1585 1781 1856 1870 1535
Grp Volume(v),veh/h 0 0 347 999 1132 0
Grp Sat Flow(s),veh/h/In 1697 1585 1781 1856 1870 1535
Q Serve(g_s),s 0.0 0.0 1.7 5.2 21.5 0.0
Cycle Q Clear(g_c),s 0.0 0.0 1.7 5.2 21.5 0.0
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 1 484 1784 1647
V/C Ratio(X) 0.00 0.72 0.56 0.69
Avail Cap(c_a),veh/h 262 750 1784 1647
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 0.00 1.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 0.0 0.0 8.0 0.2 2.1 0.0
Incr Delay(d2),s/veh 0.0 0.0 2.0 1.3 2.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 0.0 0.0 4.4 0.6 3.9 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 0.0 0.0 10.0 1.5 4.5 0.0
LnGrp LOS A B A A
Approach Vol,veh/h 0 1346 1132
Approach Delay,s/veh 0.0 3.7 4.5
Approach LOS A A
Timer-Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc),s 117.4 0.0 9.5 107.9
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 112.9 18.1 22.5 85.9
Max Q Clear Time(g_c+I1),s 7.2 0.0 3.7 23.5
Green Ext Time(p-c),s 12.0 0.0 1.0 15.8
Intersection Summary
HCM 6th Ctrl Delay 4.0
HCM 6th LOS A
Notes
Unsignalized Delay for[EBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th TWSC 2024 AM With Project Kuakini 4-Lane
6: Route 11 & Kuakini Street 12/07/2022
Intersection
Int Delay,s/veh 10.5
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r ) tt tt r
Traffic Vol,veh/h 0 159 604 914 905 0
Future Vol,veh/h 0 159 604 914 905 0
Conflicting Peds,#/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Free - None Yield
Storage Length 160 0 630 - 700
Veh in Median Storage,# 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 93 93 93 93 93 93
Heavy Vehicles, % 2 4 2 5 5 7
Mvmt Flow 0 171 649 983 973 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 2763 - 973 0 0
Stage 1 973
Stage 2 1790
Critical Hdwy 6.84 4.14
Critical Hdwy Stg 1 5.84 -
Critical Hdwy Stg 2 5.84 -
Follow-up Hdwy 3.52 2.22
Pot Cap-1 Maneuver 16 0 704
Stage 1 327 0 -
Stage 2 119 0 -
Platoon blocked, %
Mov Cap-1 Maneuver 1 - 704
Mov Cap-2 Maneuver 1
Stage 1 26
Stage 2 119
Approach EB NB SB
HCM Control Delay,s 0 16.7 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity(veh/h) 704
HCM Lane V/C Ratio 0.923
HCM Control Delay(s) 41.9 0 0
HCM Lane LOS E A A
HCM 95th %tile Q(veh) 12.6
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th TWSC 2024 PM With Project Kuakini 4-Lane
6: Route 11 & Kuakini Street 12/07/2022
Intersection
Int Delay,s/veh 2.6
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r ) tt tt r
Traffic Vol,veh/h 0 325 340 979 1109 0
Future Vol,veh/h 0 325 340 979 1109 0
Conflicting Peds,#/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Free - None Yield
Storage Length 160 0 630 - 700
Veh in Median Storage,# 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 8 2 2 3 2 6
Mvmt Flow 0 332 347 999 1132 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 2326 - 1132 0 0
Stage 1 1132
Stage 2 1194
Critical Hdwy 6.96 4.14
Critical Hdwy Stg 1 5.96 -
Critical Hdwy Stg 2 5.96 -
Follow-up Hdwy 3.58 2.22
Pot Cap-1 Maneuver 29 0 613
Stage 1 257 0 -
Stage 2 238 0 -
Platoon blocked, %
Mov Cap-1 Maneuver 13 - 613
Mov Cap-2 Maneuver 13
Stage 1 112
Stage 2 238
Approach EB NB SB
HCM Control Delay,s 0 4.7 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity(veh/h) 613
HCM Lane V/C Ratio 0.566
HCM Control Delay(s) 18.3 0 0
HCM Lane LOS C A A
HCM 95th %tile Q(veh) 3.5
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 AM With Project Kuakini Protected
6: Route 11 & Kuakini Street II 12/07/2022
t t
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r t + r
Traffic Volume(veh/h) 0 159 608 968 945 0
Future Volume(veh/h) 0 159 608 968 945 0
Initial Q(Qb),veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow,veh/h/In 1870 1841 1870 1826 1826 1796
Adj Flow Rate,veh/h 0 0 654 1041 1016 0
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 2 4 2 5 5 7
Cap,veh/h 1 650 1761 1031
Arrive On Green 0.00 0.00 0.36 0.96 0.56 0.00
Sat Flow,veh/h 1781 1560 1781 1826 1826 1522
Grp Volume(v),veh/h 0 0 654 1041 1016 0
Grp Sat Flow(s),veh/h/In 1781 1560 1781 1826 1826 1522
Q Serve(g_s),s 0.0 0.0 46.5 6.0 69.6 0.0
Cycle Q Clear(g_c),s 0.0 0.0 46.5 6.0 69.6 0.0
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 1 650 1761 1031
V/C Ratio(X) 0.00 1.01 0.59 0.99
Avail Cap(c_a),veh/h 251 650 1761 1031
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 0.00 1.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 0.0 0.0 40.5 0.2 27.2 0.0
Incr Delay(d2),s/veh 0.0 0.0 37.0 1.5 24.7 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 0.0 0.0 26.7 0.7 35.8 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 0.0 0.0 77.5 1.6 52.0 0.0
LnGrp LOS A F A D
Approach Vol,veh/h 0 1695 1016
Approach Delay,s/veh 0.0 30.9 52.0
Approach LOS C D
Timer-Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc),s 127.5 0.0 51.0 76.5
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 123.0 18.0 46.5 72.0
Max Q Clear Time(g_c+I1),s 8.0 0.0 48.5 71.6
Green Ext Time(p-c),s 13.3 0.0 0.0 0.3
Intersection Summary
HCM 6th Ctrl Delay 38.8
HCM 6th LOS D
Notes
Unsignalized Delay for[EBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 PM With Project Kuakini Protected
6: Route 11 & Kuakini Street II 12/07/2022
t t
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r + + r
Traffic Volume(veh/h) 0 325 341 1056 1157 0
Future Volume(veh/h) 0 325 341 1056 1157 0
Initial Q(Qb),veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow,veh/h/In 1781 1870 1870 1856 1870 1811
Adj Flow Rate,veh/h 0 0 348 1078 1181 0
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 8 2 2 3 2 6
Cap,veh/h 1 374 1784 1334
Arrive On Green 0.00 0.00 0.21 0.96 0.71 0.00
Sat Flow,veh/h 1697 1585 1781 1856 1870 1535
Grp Volume(v),veh/h 0 0 348 1078 1181 0
Grp Sat Flow(s),veh/h/In 1697 1585 1781 1856 1870 1535
Q Serve(g_s),s 0.0 0.0 22.5 6.2 57.7 0.0
Cycle Q Clear(g_c),s 0.0 0.0 22.5 6.2 57.7 0.0
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 1 374 1784 1334
V/C Ratio(X) 0.00 0.93 0.60 0.89
Avail Cap(c_a),veh/h 260 391 1784 1334
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 0.00 1.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 0.0 0.0 45.5 0.2 13.1 0.0
Incr Delay(d2),s/veh 0.0 0.0 27.9 1.5 8.9 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 0.0 0.0 12.8 0.8 24.0 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 0.0 0.0 73.5 1.7 22.0 0.0
LnGrp LOS A E A C
Approach Vol,veh/h 0 1426 1181
Approach Delay,s/veh 0.0 19.2 22.0
Approach LOS B C
Timer-Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc),s 117.5 0.0 29.2 88.3
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 113.0 18.0 25.8 82.7
Max Q Clear Time(g_c+I1),s 8.2 0.0 24.5 59.7
Green Ext Time(p-c),s 14.5 0.0 0.2 12.0
Intersection Summary
HCM 6th Ctrl Delay 20.5
HCM 6th LOS C
Notes
Unsignalized Delay for[EBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 AM With Project Kuakini Protected+Permitted
6: Route 11 & Kuakini Street II 12/07/2022
t t
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r t + r
Traffic Volume(veh/h) 0 159 608 968 945 0
Future Volume(veh/h) 0 159 608 968 945 0
Initial Q(Qb),veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow,veh/h/In 1870 1841 1870 1826 1826 1796
Adj Flow Rate,veh/h 0 0 654 1041 1016 0
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 2 4 2 5 5 7
Cap,veh/h 1 683 1761 1147
Arrive On Green 0.00 0.00 0.30 0.96 0.63 0.00
Sat Flow,veh/h 1781 1560 1781 1826 1826 1522
Grp Volume(v),veh/h 0 0 654 1041 1016 0
Grp Sat Flow(s),veh/h/In 1781 1560 1781 1826 1826 1522
Q Serve(g_s),s 0.0 0.0 35.2 6.0 59.5 0.0
Cycle Q Clear(g_c),s 0.0 0.0 35.2 6.0 59.5 0.0
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 1 683 1761 1147
V/C Ratio(X) 0.00 0.96 0.59 0.89
Avail Cap(c_a),veh/h 251 740 1761 1147
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 0.00 1.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 0.0 0.0 36.5 0.2 19.9 0.0
Incr Delay(d2),s/veh 0.0 0.0 22.5 1.5 10.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 0.0 0.0 23.8 0.7 26.8 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 0.0 0.0 59.0 1.6 30.1 0.0
LnGrp LOS A E A C
Approach Vol,veh/h 0 1695 1016
Approach Delay,s/veh 0.0 23.8 30.1
Approach LOS C C
Timer-Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc),s 127.5 0.0 42.9 84.6
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 123.0 18.0 42.5 76.0
Max Q Clear Time(g_c+I1),s 8.0 0.0 37.2 61.5
Green Ext Time(p-c),s 13.3 0.0 1.2 7.2
Intersection Summary
HCM 6th Ctrl Delay 26.1
HCM 6th LOS C
Notes
Unsignalized Delay for[EBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 PM With Project Kuakini Protected+Permitted
6: Route 11 & Kuakini Street II 12/07/2022
t t
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r t + r
Traffic Volume(veh/h) 0 325 341 1056 1157 0
Future Volume(veh/h) 0 325 341 1056 1157 0
Initial Q(Qb),veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow,veh/h/In 1781 1870 1870 1856 1870 1811
Adj Flow Rate,veh/h 0 0 348 1078 1181 0
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 8 2 2 3 2 6
Cap,veh/h 1 458 1784 1648
Arrive On Green 0.00 0.00 0.04 0.96 0.88 0.00
Sat Flow,veh/h 1697 1585 1781 1856 1870 1535
Grp Volume(v),veh/h 0 0 348 1078 1181 0
Grp Sat Flow(s),veh/h/In 1697 1585 1781 1856 1870 1535
Q Serve(g_s),s 0.0 0.0 1.7 6.2 24.0 0.0
Cycle Q Clear(g_c),s 0.0 0.0 1.7 6.2 24.0 0.0
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 1 458 1784 1648
V/C Ratio(X) 0.00 0.76 0.60 0.72
Avail Cap(c_a),veh/h 260 718 1784 1648
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 0.00 1.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 0.0 0.0 11.0 0.2 2.3 0.0
Incr Delay(d2),s/veh 0.0 0.0 2.6 1.5 2.7 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 0.0 0.0 6.0 0.8 4.4 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 0.0 0.0 13.6 1.7 5.0 0.0
LnGrp LOS A B A A
Approach Vol,veh/h 0 1426 1181
Approach Delay,s/veh 0.0 4.6 5.0
Approach LOS A A
Timer-Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc),s 117.5 0.0 9.5 108.0
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 113.0 18.0 22.1 86.4
Max Q Clear Time(g_c+I1),s 8.2 0.0 3.7 26.0
Green Ext Time(p-c),s 14.5 0.0 1.0 17.6
Intersection Summary
HCM 6th Ctrl Delay 4.8
HCM 6th LOS A
Notes
Unsignalized Delay for[EBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th TWSC 2029 AM With Project Kuakini 4-Lane
6: Route 11 & Kuakini Street 12/07/2022
Intersection
Int Delay,s/veh 12.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r ) tt tt r
Traffic Vol,veh/h 0 159 608 968 945 0
Future Vol,veh/h 0 159 608 968 945 0
Conflicting Peds,#/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Free - None Yield
Storage Length 160 0 630 - 700
Veh in Median Storage,# 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 93 93 93 93 93 93
Heavy Vehicles, % 2 4 2 5 5 7
Mvmt Flow 0 171 654 1041 1016 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 2845 - 1016 0 0
Stage 1 1016
Stage 2 1829
Critical Hdwy 6.84 4.14
Critical Hdwy Stg 1 5.84 -
Critical Hdwy Stg 2 5.84 -
Follow-up Hdwy 3.52 2.22
Pot Cap-1 Maneuver 14 0 678
Stage 1 310 0 -
Stage 2 113 0 -
Platoon blocked, %
Mov Cap-1 Maneuver 0 - 678
Mov Cap-2 Maneuver 0
Stage 1 11
Stage 2 113
Approach EB NB SB
HCM Control Delay,s 0 19.7 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity(veh/h) 678
HCM Lane V/C Ratio 0.964
HCM Control Delay(s) 50.9 0 0
HCM Lane LOS F A A
HCM 95th %tile Q(veh) 14.2
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th TWSC 2029 PM With Project Kuakini 4-Lane
6: Route 11 & Kuakini Street 12/07/2022
Intersection
Int Delay,s/veh 2.6
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r ) tt tt r
Traffic Vol,veh/h 0 325 341 1056 1157 0
Future Vol,veh/h 0 325 341 1056 1157 0
Conflicting Peds,#/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Free - None Yield
Storage Length 160 0 630 - 700
Veh in Median Storage,# 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 8 2 2 3 2 6
Mvmt Flow 0 332 348 1078 1181 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 2416 - 1181 0 0
Stage 1 1181
Stage 2 1235
Critical Hdwy 6.96 4.14
Critical Hdwy Stg 1 5.96 -
Critical Hdwy Stg 2 5.96 -
Follow-up Hdwy 3.58 2.22
Pot Cap-1 Maneuver 25 0 587
Stage 1 242 0 -
Stage 2 226 0 -
Platoon blocked, %
Mov Cap-1 Maneuver 10 - 587
Mov Cap-2 Maneuver 10
Stage 1 98
Stage 2 226
Approach EB NB SB
HCM Control Delay,s 0 4.8 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity(veh/h) 587
HCM Lane V/C Ratio 0.593
HCM Control Delay(s) 19.7 0 0
HCM Lane LOS C A A
HCM 95th %tile Q(veh) 3.9
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 AM With Project Kuakini Protected
6: Route 11 & Kuakini Street II 12/07/2022
t t
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r t + r
Traffic Volume(veh/h) 0 159 608 1060 1029 0
Future Volume(veh/h) 0 159 608 1060 1029 0
Initial Q(Qb),veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow,veh/h/In 1870 1841 1870 1826 1826 1796
Adj Flow Rate,veh/h 0 0 654 1140 1106 0
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 2 4 2 5 5 7
Cap,veh/h 1 608 1761 1074
Arrive On Green 0.00 0.00 0.34 0.96 0.59 0.00
Sat Flow,veh/h 1781 1560 1781 1826 1826 1522
Grp Volume(v),veh/h 0 0 654 1140 1106 0
Grp Sat Flow(s),veh/h/In 1781 1560 1781 1826 1826 1522
Q Serve(g_s),s 0.0 0.0 43.5 7.5 75.0 0.0
Cycle Q Clear(g_c),s 0.0 0.0 43.5 7.5 75.0 0.0
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 1 608 1761 1074
V/C Ratio(X) 0.00 1.08 0.65 1.03
Avail Cap(c_a),veh/h 251 608 1761 1074
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 0.00 1.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 0.0 0.0 42.0 0.2 26.2 0.0
Incr Delay(d2),s/veh 0.0 0.0 58.7 1.9 35.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 0.0 0.0 28.8 0.9 41.0 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 0.0 0.0 100.7 2.1 61.6 0.0
LnGrp LOS A F A F
Approach Vol,veh/h 0 1794 1106
Approach Delay,s/veh 0.0 38.0 61.6
Approach LOS D E
Timer-Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc),s 127.5 0.0 48.0 79.5
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 123.0 18.0 43.5 75.0
Max Q Clear Time(g_c+I1),s 9.5 0.0 45.5 77.0
Green Ext Time(p-c),s 17.1 0.0 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 47.0
HCM 6th LOS D
Notes
Unsignalized Delay for[EBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 PM With Project Kuakini Protected
6: Route 11 & Kuakini Street II 12/07/2022
t t
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r + + r
Traffic Volume(veh/h) 0 325 341 1155 1259 0
Future Volume(veh/h) 0 325 341 1155 1259 0
Initial Q(Qb),veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow,veh/h/In 1781 1870 1870 1856 1870 1811
Adj Flow Rate,veh/h 0 0 348 1179 1285 0
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 8 2 2 3 2 6
Cap,veh/h 1 370 1790 1350
Arrive On Green 0.00 0.00 0.21 0.96 0.72 0.00
Sat Flow,veh/h 1697 1585 1781 1856 1870 1535
Grp Volume(v),veh/h 0 0 348 1179 1285 0
Grp Sat Flow(s),veh/h/In 1697 1585 1781 1856 1870 1535
Q Serve(g_s),s 0.0 0.0 24.5 7.8 77.9 0.0
Cycle Q Clear(g_c),s 0.0 0.0 24.5 7.8 77.9 0.0
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 1 370 1790 1350
V/C Ratio(X) 0.00 0.94 0.66 0.95
Avail Cap(c_a),veh/h 240 370 1790 1350
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 0.00 1.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 0.0 0.0 49.7 0.2 15.8 0.0
Incr Delay(d2),s/veh 0.0 0.0 31.7 1.9 15.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 0.0 0.0 14.1 1.0 34.4 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 0.0 0.0 81.4 2.1 31.2 0.0
LnGrp LOS A F A C
Approach Vol,veh/h 0 1527 1285
Approach Delay,s/veh 0.0 20.2 31.2
Approach LOS C C
Timer-Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc),s 127.5 0.0 31.0 96.5
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 123.0 18.0 26.5 92.0
Max Q Clear Time(g_c+I1),s 9.8 0.0 26.5 79.9
Green Ext Time(p-c),s 18.8 0.0 0.0 8.6
Intersection Summary
HCM 6th Ctrl Delay 25.2
HCM 6th LOS C
Notes
Unsignalized Delay for[EBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 AM With Project Kuakini Protected+Permitted
6: Route 11 & Kuakini Street II 12/07/2022
t t
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r t + r
Traffic Volume(veh/h) 0 159 608 1060 1029 0
Future Volume(veh/h) 0 159 608 1060 1029 0
Initial Q(Qb),veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow,veh/h/In 1870 1841 1870 1826 1826 1796
Adj Flow Rate,veh/h 0 0 654 1140 1106 0
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 2 4 2 5 5 7
Cap,veh/h 1 630 1761 1117
Arrive On Green 0.00 0.00 0.32 0.96 0.61 0.00
Sat Flow,veh/h 1781 1560 1781 1826 1826 1522
Grp Volume(v),veh/h 0 0 654 1140 1106 0
Grp Sat Flow(s),veh/h/In 1781 1560 1781 1826 1826 1522
Q Serve(g_s),s 0.0 0.0 40.5 7.5 76.0 0.0
Cycle Q Clear(g_c),s 0.0 0.0 40.5 7.5 76.0 0.0
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 1 630 1761 1117
V/C Ratio(X) 0.00 1.04 0.65 0.99
Avail Cap(c_a),veh/h 251 630 1761 1117
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 0.00 1.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 0.0 0.0 40.7 0.2 24.4 0.0
Incr Delay(d2),s/veh 0.0 0.0 46.0 1.9 24.7 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 0.0 0.0 26.5 0.9 38.1 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 0.0 0.0 86.8 2.1 49.0 0.0
LnGrp LOS A F A D
Approach Vol,veh/h 0 1794 1106
Approach Delay,s/veh 0.0 32.9 49.0
Approach LOS C D
Timer-Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc),s 127.5 0.0 45.0 82.5
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 123.0 18.0 40.5 78.0
Max Q Clear Time(g_c+I1),s 9.5 0.0 42.5 78.0
Green Ext Time(p-c),s 17.1 0.0 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 39.1
HCM 6th LOS D
Notes
Unsignalized Delay for[EBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 PM With Project Kuakini Protected+Permitted
6: Route 11 & Kuakini Street II 12/07/2022
t t
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r t + r
Traffic Volume(veh/h) 0 325 341 1155 1259 0
Future Volume(veh/h) 0 325 341 1155 1259 0
Initial Q(Qb),veh 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow,veh/h/In 1781 1870 1870 1856 1870 1811
Adj Flow Rate,veh/h 0 0 348 1179 1285 0
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 8 2 2 3 2 6
Cap,veh/h 1 405 1790 1665
Arrive On Green 0.00 0.00 0.04 0.96 0.89 0.00
Sat Flow,veh/h 1697 1585 1781 1856 1870 1535
Grp Volume(v),veh/h 0 0 348 1179 1285 0
Grp Sat Flow(s),veh/h/In 1697 1585 1781 1856 1870 1535
Q Serve(g_s),s 0.0 0.0 1.7 7.8 30.7 0.0
Cycle Q Clear(g_c),s 0.0 0.0 1.7 7.8 30.7 0.0
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 1 405 1790 1665
V/C Ratio(X) 0.00 0.86 0.66 0.77
Avail Cap(c_a),veh/h 240 650 1790 1665
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 0.00 1.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 0.0 0.0 19.4 0.2 2.5 0.0
Incr Delay(d2),s/veh 0.0 0.0 6.6 1.9 3.5 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 0.0 0.0 10.9 1.0 5.7 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 0.0 0.0 26.0 2.1 6.0 0.0
LnGrp LOS A C A A
Approach Vol,veh/h 0 1527 1285
Approach Delay,s/veh 0.0 7.6 6.0
Approach LOS A A
Timer-Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc),s 127.5 0.0 9.5 118.0
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 123.0 18.0 22.5 96.0
Max Q Clear Time(g_c+I1),s 9.8 0.0 3.7 32.7
Green Ext Time(p-c),s 18.8 0.0 1.0 22.7
Intersection Summary
HCM 6th Ctrl Delay 6.8
HCM 6th LOS A
Notes
Unsignalized Delay for[EBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th TWSC 2029 AM With Project Kuakini 4-Lane
6: Route 11 & Kuakini Street 12/07/2022
Intersection
Int Delay,s/veh 16.5
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r ) tt tt r
Traffic Vol,veh/h 0 159 608 1060 1029 0
Future Vol,veh/h 0 159 608 1060 1029 0
Conflicting Peds,#/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Free - None Yield
Storage Length 160 0 630 - 700
Veh in Median Storage,# 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 93 93 93 93 93 93
Heavy Vehicles, % 2 4 2 5 5 7
Mvmt Flow 0 171 654 1140 1106 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 2984 - 1106 0 0
Stage 1 1106
Stage 2 1878
Critical Hdwy 6.84 4.14
Critical Hdwy Stg 1 5.84 -
Critical Hdwy Stg 2 5.84 -
Follow-up Hdwy 3.52 2.22
Pot Cap-1 Maneuver 11 0 —627
Stage 1 278 0 -
Stage 2 106 0 -
Platoon blocked, %
Mov Cap-1 Maneuver 0 - —627
Mov Cap-2 Maneuver 0
Stage 1 0
Stage 2 106
Approach EB NB SB
HCM Control Delay,s 0 26.7 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity(veh/h) —627
HCM Lane V/C Ratio 1.043
HCM Control Delay(s) 73.1 0 0
HCM Lane LOS F A A
HCM 95th %tile Q(veh) 17.4
Notes
-:Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *:All major volume in platoon
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th TWSC 2039 PM With Project Kuakini 4-Lane
6: Route 11 & Kuakini Street 12/07/2022
Intersection
Int Delay,s/veh 2.9
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations r ) tt tt r
Traffic Vol,veh/h 0 325 341 1155 1259 0
Future Vol,veh/h 0 325 341 1155 1259 0
Conflicting Peds,#/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Free - None Yield
Storage Length 160 0 630 - 700
Veh in Median Storage,# 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 8 2 2 3 2 6
Mvmt Flow 0 332 348 1179 1285 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 2571 - 1285 0 0
Stage 1 1285
Stage 2 1286
Critical Hdwy 6.96 4.14
Critical Hdwy Stg 1 5.96 -
Critical Hdwy Stg 2 5.96 -
Follow-up Hdwy 3.58 2.22
Pot Cap-1 Maneuver 19 0 536
Stage 1 212 0 -
Stage 2 212 0 -
Platoon blocked, %
Mov Cap-1 Maneuver 7 - 536
Mov Cap-2 Maneuver 7
Stage 1 74
Stage 2 212
Approach EB NB SB
HCM Control Delay,s 0 5.3 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity(veh/h) 536
HCM Lane V/C Ratio 0.649
HCM Control Delay(s) 23.3 0 0
HCM Lane LOS C A A
HCM 95th %tile Q(veh) 4.6
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2024 AM With Project Lako Protected
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. 4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 281 48 69 88 40 301 33 927 55 160 769 142
Future Volume(veh/h) 281 48 69 88 40 301 33 927 55 160 769 142
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1870 1870 1870 1856 1870 1870 1870 1870 1841 1811 1856 1870
Adj Flow Rate,veh/h 299 51 0 94 43 0 35 986 0 170 818 0
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 2 2 2 3 2 2 2 2 4 6 3 2
Cap,veh/h 322 294 125 88 289 1043 199 1089
Arrive On Green 0.18 0.16 0.00 0.07 0.05 0.00 0.03 0.56 0.00 0.06 0.59 0.00
Sat Flow,veh/h 1781 1870 0 1767 1870 0 1781 1870 1560 1725 1856 1585
Grp Volume(v),veh/h 299 51 0 94 43 0 35 986 0 170 818 0
Grp Sat Flow(s),veh/h/In 1781 1870 0 1767 1870 0 1781 1870 1560 1725 1856 1585
Q Serve(g_s),s 19.1 2.7 0.0 6.0 2.6 0.0 1.0 57.0 0.0 4.7 37.6 0.0
Cycle Q Clear(g_c),s 19.1 2.7 0.0 6.0 2.6 0.0 1.0 57.0 0.0 4.7 37.6 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 322 294 125 88 289 1043 199 1089
V/C Ratio(X) 0.93 0.17 0.75 0.49 0.12 0.95 0.85 0.75
Avail Cap(c_a),veh/h 322 343 275 296 314 1043 225 1089
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 46.5 42.2 0.0 52.7 53.7 0.0 15.4 23.9 0.0 26.7 17.6 0.0
Incr Delay(d2),s/veh 32.0 0.3 0.0 8.8 4.2 0.0 0.2 17.5 0.0 23.8 4.8 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 11.3 1.3 0.0 3.0 1.3 0.0 0.4 28.6 0.0 3.9 16.6 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 78.5 42.4 0.0 61.4 57.9 0.0 15.6 41.4 0.0 50.6 22.4 0.0
LnGrp LOS E D E E B D D C
Approach Vol,veh/h 350 137 1021 988
Approach Delay,s/veh 73.3 60.3 40.5 27.2
Approach LOS E E D C
Timer-Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc),s 11.3 68.9 12.7 22.6 7.9 72.3 25.4 9.9
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 8.5 64.3 18.0 21.2 5.0 67.8 20.9 18.3
Max Q Clear Time(g_c+I1),s 6.7 59.0 8.0 4.7 3.0 39.6 21.1 4.6
Green Ext Time(p-c),s 0.1 3.2 0.1 0.1 0.0 7.0 0.0 0.1
Intersection Summary
HCM 6th Ctrl Delay 40.9
HCM 6th LOS D
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2024 AM With Project Lako Permissive
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. 4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 281 48 69 88 40 301 33 927 55 160 769 142
Future Volume(veh/h) 281 48 69 88 40 301 33 927 55 160 769 142
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1870 1870 1870 1856 1870 1870 1870 1870 1841 1811 1856 1870
Adj Flow Rate,veh/h 299 51 0 94 43 0 35 986 0 170 818 0
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 2 2 2 3 2 2 2 2 4 6 3 2
Cap,veh/h 390 483 380 483 300 1064 209 1108
Arrive On Green 0.26 0.26 0.00 0.26 0.26 0.00 0.03 0.57 0.00 0.06 0.60 0.00
Sat Flow,veh/h 1361 1870 0 1341 1870 0 1781 1870 1560 1725 1856 1585
Grp Volume(v),veh/h 299 51 0 94 43 0 35 986 0 170 818 0
Grp Sat Flow(s),veh/h/In 1361 1870 0 1341 1870 0 1781 1870 1560 1725 1856 1585
Q Serve(g_s),s 25.0 2.4 0.0 6.7 2.0 0.0 0.9 56.2 0.0 4.7 37.1 0.0
Cycle Q Clear(g_c),s 27.0 2.4 0.0 9.2 2.0 0.0 0.9 56.2 0.0 4.7 37.1 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 390 483 380 483 300 1064 209 1108
V/C Ratio(X) 0.77 0.11 0.25 0.09 0.12 0.93 0.81 0.74
Avail Cap(c_a),veh/h 649 840 636 840 325 1064 221 1108
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 43.2 33.1 0.0 36.5 32.9 0.0 14.8 23.0 0.0 26.6 17.0 0.0
Incr Delay(d2),s/veh 3.2 0.1 0.0 0.3 0.1 0.0 0.2 14.8 0.0 19.4 4.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 8.7 1.1 0.0 2.2 0.9 0.0 0.4 27.6 0.0 3.8 16.3 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 46.4 33.1 0.0 36.9 33.0 0.0 15.0 37.8 0.0 46.0 21.4 0.0
LnGrp LOS D C D C B D D C
Approach Vol,veh/h 350 137 1021 988
Approach Delay,s/veh 44.4 35.7 37.0 25.6
Approach LOS D D D C
Timer-Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc),s 11.2 71.0 34.7 7.9 74.3 34.7
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 7.5 66.5 52.5 5.0 69.0 52.5
Max Q Clear Time(g_c+I1),s 6.7 58.2 29.0 2.9 39.1 11.2
Green Ext Time(p-c),s 0.0 4.6 1.2 0.0 7.1 0.5
Intersection Summary
HCM 6th Ctrl Delay 33.5
HCM 6th LOS C
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2024 AM With Project Lako Protected+Permissive
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. .4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 281 48 69 88 40 301 33 927 55 160 769 142
Future Volume(veh/h) 281 48 69 88 40 301 33 927 55 160 769 142
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 0.99 1.00 0.99 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1870 1870 1870 1856 1870 1870 1870 1870 1841 1811 1856 1870
Adj Flow Rate,veh/h 299 51 0 94 43 0 35 986 0 170 818 0
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 2 2 2 3 2 2 2 2 4 6 3 2
Cap,veh/h 352 245 231 88 333 1118 240 1157
Arrive On Green 0.14 0.13 0.00 0.06 0.05 0.00 0.03 0.60 0.00 0.06 0.62 0.00
Sat Flow,veh/h 1781 1870 0 1767 1870 0 1781 1870 1560 1725 1856 1585
Grp Volume(v),veh/h 299 51 0 94 43 0 35 986 0 170 818 0
Grp Sat Flow(s),veh/h/In 1781 1870 0 1767 1870 0 1781 1870 1560 1725 1856 1585
Q Serve(g_s),s 16.6 2.8 0.0 5.8 2.6 0.0 0.9 51.7 0.0 4.3 34.2 0.0
Cycle Q Clear(g_c),s 16.6 2.8 0.0 5.8 2.6 0.0 0.9 51.7 0.0 4.3 34.2 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 352 245 231 88 333 1118 240 1157
V/C Ratio(X) 0.85 0.21 0.41 0.49 0.11 0.88 0.71 0.71
Avail Cap(c_a),veh/h 352 458 231 300 358 1118 275 1157
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 44.0 44.7 0.0 48.6 53.6 0.0 12.6 19.7 0.0 24.2 14.6 0.0
Incr Delay(d2),s/veh 17.5 0.4 0.0 1.2 4.2 0.0 0.1 10.1 0.0 6.9 3.6 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 9.8 1.3 0.0 2.6 1.3 0.0 0.3 24.0 0.0 3.2 14.6 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 61.5 45.2 0.0 49.7 57.8 0.0 12.8 29.9 0.0 31.2 18.2 0.0
LnGrp LOS E D D E B C C B
Approach Vol,veh/h 350 137 1021 988
Approach Delay,s/veh 59.1 52.3 29.3 20.5
Approach LOS E D C C
Timer-Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc),s 10.9 73.4 11.4 19.6 7.9 76.4 21.1 9.9
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 8.7 68.2 6.9 28.2 5.0 71.9 16.6 18.5
Max Q Clear Time(g_c+I1),s 6.3 53.7 7.8 4.8 2.9 36.2 18.6 4.6
Green Ext Time(p-c),s 0.1 6.8 0.0 0.2 0.0 7.4 0.0 0.1
Intersection Summary
HCM 6th Ctrl Delay 31.2
HCM 6th LOS C
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2024 AM With Project Lako 4-1-ane
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. .4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T tt r tt r
Traffic Volume(veh/h) 281 48 69 88 40 301 33 927 55 160 769 142
Future Volume(veh/h) 281 48 69 88 40 301 33 927 55 160 769 142
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1870 1870 1870 1856 1870 1870 1870 1870 1841 1811 1856 1870
Adj Flow Rate,veh/h 299 51 0 94 43 0 35 986 0 170 818 0
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 2 2 2 3 2 2 2 2 4 6 3 2
Cap,veh/h 351 368 141 150 343 1408 329 1560
Arrive On Green 0.20 0.20 0.00 0.08 0.08 0.00 0.03 0.40 0.00 0.08 0.44 0.00
Sat Flow,veh/h 1781 1870 0 1767 1870 0 1781 3554 1560 1725 3526 1585
Grp Volume(v),veh/h 299 51 0 94 43 0 35 986 0 170 818 0
Grp Sat Flow(s),veh/h/In 1781 1870 0 1767 1870 0 1781 1777 1560 1725 1763 1585
Q Serve(g_s),s 11.9 1.6 0.0 3.8 1.6 0.0 0.8 17.0 0.0 4.1 12.3 0.0
Cycle Q Clear(g_c),s 11.9 1.6 0.0 3.8 1.6 0.0 0.8 17.0 0.0 4.1 12.3 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 351 368 141 150 343 1408 329 1560
V/C Ratio(X) 0.85 0.14 0.67 0.29 0.10 0.70 0.52 0.52
Avail Cap(c_a),veh/h 450 473 435 460 403 1408 343 1560
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 28.4 24.3 0.0 32.7 31.7 0.0 12.7 18.5 0.0 13.7 14.8 0.0
Incr Delay(d2),s/veh 11.9 0.2 0.0 5.3 1.0 0.0 0.1 2.9 0.0 1.3 1.3 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 6.0 0.7 0.0 1.8 0.7 0.0 0.3 7.0 0.0 1.5 4.8 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 40.3 24.4 0.0 38.0 32.7 0.0 12.8 21.4 0.0 15.0 16.1 0.0
LnGrp LOS D C D C B C B B
Approach Vol,veh/h 350 137 1021 988
Approach Delay,s/veh 38.0 36.3 21.1 15.9
Approach LOS D D C B
Timer-Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc),s 10.4 33.5 18.9 7.0 36.9 10.3
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 6.5 29.0 18.5 5.0 30.5 18.0
Max Q Clear Time(g_c+I1),s 6.1 19.0 13.9 2.8 14.3 5.8
Green Ext Time(p-c),s 0.0 4.8 0.5 0.0 5.3 0.3
Intersection Summary
HCM 6th Ctrl Delay 22.2
HCM 6th LOS C
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2024 PM With Project Lako Protected
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. 4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 148 30 48 70 41 225 37 917 64 200 1015 188
Future Volume(veh/h) 148 30 48 70 41 225 37 917 64 200 1015 188
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1841 1870 1870 1870 1826 1826 1856 1856 1870 1856 1870 1870
Adj Flow Rate,veh/h 154 31 0 73 43 0 39 955 0 208 1057 0
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 4 2 2 2 5 5 3 3 2 3 2 2
Cap,veh/h 183 165 103 75 246 1201 321 1261
Arrive On Green 0.10 0.09 0.00 0.06 0.04 0.00 0.03 0.65 0.00 0.06 0.67 0.00
Sat Flow,veh/h 1753 1870 0 1781 1826 0 1767 1856 1585 1767 1870 1585
Grp Volume(v),veh/h 154 31 0 73 43 0 39 955 0 208 1057 0
Grp Sat Flow(s),veh/h/In 1753 1870 0 1781 1826 0 1767 1856 1585 1767 1870 1585
Q Serve(g_s),s 10.4 1.8 0.0 4.8 2.8 0.0 0.9 45.0 0.0 4.6 50.9 0.0
Cycle Q Clear(g_c),s 10.4 1.8 0.0 4.8 2.8 0.0 0.9 45.0 0.0 4.6 50.9 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 183 165 103 75 246 1201 321 1261
V/C Ratio(X) 0.84 0.19 0.71 0.57 0.16 0.80 0.65 0.84
Avail Cap(c_a),veh/h 263 280 267 274 266 1201 403 1261
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 52.8 50.8 0.0 55.6 56.5 0.0 16.6 15.4 0.0 19.2 14.7 0.0
Incr Delay(d2),s/veh 15.2 0.5 0.0 8.7 6.6 0.0 0.3 5.5 0.0 2.5 6.8 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 5.3 0.9 0.0 2.4 1.4 0.0 0.5 19.4 0.0 3.4 21.8 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 68.0 51.4 0.0 64.3 63.2 0.0 16.9 20.9 0.0 21.7 21.4 0.0
LnGrp LOS E D E E B C C C
Approach Vol,veh/h 185 116 994 1265
Approach Delay,s/veh 65.2 63.9 20.8 21.5
Approach LOS E E C C
Timer-Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc),s 11.4 82.2 11.4 15.1 8.1 85.5 17.0 9.5
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 12.5 73.5 18.0 18.0 5.0 81.0 18.0 18.0
Max Q Clear Time(g_c+I1),s 6.6 47.0 6.8 3.8 2.9 52.9 12.4 4.8
Green Ext Time(p-c),s 0.3 8.8 0.1 0.1 0.0 10.8 0.2 0.1
Intersection Summary
HCM 6th Ctrl Delay 26.3
HCM 6th LOS C
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2024 PM With Project Lako Permissive
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. 4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 148 30 48 70 41 225 37 917 64 200 1015 188
Future Volume(veh/h) 148 30 48 70 41 225 37 917 64 200 1015 188
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1841 1870 1870 1870 1826 1826 1856 1856 1870 1856 1870 1870
Adj Flow Rate,veh/h 154 31 0 73 43 0 39 955 0 208 1057 0
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 4 2 2 2 5 5 3 3 2 3 2 2
Cap,veh/h 267 297 281 290 251 1157 327 1223
Arrive On Green 0.16 0.16 0.00 0.16 0.16 0.00 0.03 0.62 0.00 0.07 0.65 0.00
Sat Flow,veh/h 1342 1870 0 1378 1826 0 1767 1856 1585 1767 1870 1585
Grp Volume(v),veh/h 154 31 0 73 43 0 39 955 0 208 1057 0
Grp Sat Flow(s),veh/h/In 1342 1870 0 1378 1826 0 1767 1856 1585 1767 1870 1585
Q Serve(g_s),s 9.9 1.3 0.0 4.2 1.8 0.0 0.7 35.4 0.0 3.7 39.9 0.0
Cycle Q Clear(g_c),s 11.7 1.3 0.0 5.5 1.8 0.0 0.7 35.4 0.0 3.7 39.9 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 267 297 281 290 251 1157 327 1223
V/C Ratio(X) 0.58 0.10 0.26 0.15 0.16 0.83 0.64 0.86
Avail Cap(c_a),veh/h 410 496 427 484 289 1157 382 1223
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 37.2 31.9 0.0 34.2 32.1 0.0 13.7 12.9 0.0 15.9 12.2 0.0
Incr Delay(d2),s/veh 2.0 0.2 0.0 0.5 0.2 0.0 0.3 6.8 0.0 2.7 8.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 3.3 0.6 0.0 1.4 0.8 0.0 0.3 14.7 0.0 2.5 16.5 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 39.1 32.1 0.0 34.7 32.4 0.0 14.0 19.7 0.0 18.6 20.4 0.0
LnGrp LOS D C C C B B B C
Approach Vol,veh/h 185 116 994 1265
Approach Delay,s/veh 37.9 33.9 19.5 20.1
Approach LOS D C B C
Timer-Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc),s 10.3 59.8 18.6 7.6 62.5 18.6
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 8.5 54.5 23.5 5.0 58.0 23.5
Max Q Clear Time(g_c+I1),s 5.7 37.4 13.7 2.7 41.9 7.5
Green Ext Time(p-c),s 0.2 7.2 0.4 0.0 8.1 0.3
Intersection Summary
HCM 6th Ctrl Delay 21.8
HCM 6th LOS C
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2024 PM With Project Lako Protected+Permitted
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. .4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 148 30 48 70 41 225 37 917 64 200 1015 188
Future Volume(veh/h) 148 30 48 70 41 225 37 917 64 200 1015 188
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1841 1870 1870 1870 1826 1826 1856 1856 1870 1856 1870 1870
Adj Flow Rate,veh/h 154 31 0 73 43 0 39 955 0 208 1057 0
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 4 2 2 2 5 5 3 3 2 3 2 2
Cap,veh/h 232 127 237 94 249 1166 325 1231
Arrive On Green 0.07 0.07 0.00 0.05 0.05 0.00 0.03 0.63 0.00 0.06 0.66 0.00
Sat Flow,veh/h 1753 1870 0 1781 1826 0 1767 1856 1585 1767 1870 1585
Grp Volume(v),veh/h 154 31 0 73 43 0 39 955 0 208 1057 0
Grp Sat Flow(s),veh/h/In 1753 1870 0 1781 1826 0 1767 1856 1585 1767 1870 1585
Q Serve(g_s),s 6.4 1.5 0.0 3.6 2.2 0.0 0.7 37.5 0.0 3.9 42.3 0.0
Cycle Q Clear(g_c),s 6.4 1.5 0.0 3.6 2.2 0.0 0.7 37.5 0.0 3.9 42.3 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 232 127 237 94 249 1166 325 1231
V/C Ratio(X) 0.66 0.24 0.31 0.46 0.16 0.82 0.64 0.86
Avail Cap(c_a),veh/h 232 372 250 346 282 1166 384 1231
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 41.0 42.0 0.0 40.0 43.8 0.0 14.4 13.5 0.0 16.7 12.8 0.0
Incr Delay(d2),s/veh 6.9 1.0 0.0 0.7 3.4 0.0 0.3 6.5 0.0 2.7 7.9 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 4.0 0.7 0.0 1.6 1.1 0.0 0.4 15.8 0.0 2.7 17.7 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 47.9 43.0 0.0 40.7 47.3 0.0 14.7 20.0 0.0 19.4 20.7 0.0
LnGrp LOS D D D D B B B C
Approach Vol,veh/h 185 116 994 1265
Approach Delay,s/veh 47.1 43.1 19.8 20.5
Approach LOS D D B C
Timer-Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc),s 10.5 64.3 9.3 11.0 7.7 67.1 10.9 9.4
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 9.2 58.4 5.5 18.9 5.0 62.6 6.4 18.0
Max Q Clear Time(g_c+I1),s 5.9 39.5 5.6 3.5 2.7 44.3 8.4 4.2
Green Ext Time(p-c),s 0.2 7.6 0.0 0.1 0.0 8.7 0.0 0.1
Intersection Summary
HCM 6th Ctrl Delay 23.1
HCM 6th LOS C
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2024 PM With Project Lako 4-1-ane
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. .4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T tt r tt r
Traffic Volume(veh/h) 148 30 48 70 41 225 37 917 64 200 1015 188
Future Volume(veh/h) 148 30 48 70 41 225 37 917 64 200 1015 188
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1841 1870 1870 1870 1826 1826 1856 1856 1870 1856 1870 1870
Adj Flow Rate,veh/h 154 31 0 73 43 0 39 955 0 208 1057 0
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 4 2 2 2 5 5 3 3 2 3 2 2
Cap,veh/h 207 221 122 125 329 1552 410 1751
Arrive On Green 0.12 0.12 0.00 0.07 0.07 0.00 0.04 0.44 0.00 0.09 0.49 0.00
Sat Flow,veh/h 1753 1870 0 1781 1826 0 1767 3526 1585 1767 3554 1585
Grp Volume(v),veh/h 154 31 0 73 43 0 39 955 0 208 1057 0
Grp Sat Flow(s),veh/h/In 1753 1870 0 1781 1826 0 1767 1763 1585 1767 1777 1585
Q Serve(g_s),s 5.4 0.9 0.0 2.5 1.4 0.0 0.7 13.3 0.0 3.9 13.7 0.0
Cycle Q Clear(g_c),s 5.4 0.9 0.0 2.5 1.4 0.0 0.7 13.3 0.0 3.9 13.7 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 207 221 122 125 329 1552 410 1751
V/C Ratio(X) 0.75 0.14 0.60 0.34 0.12 0.62 0.51 0.60
Avail Cap(c_a),veh/h 494 527 502 515 398 1552 467 1751
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 27.2 25.3 0.0 28.9 28.4 0.0 9.8 13.7 0.0 9.9 11.7 0.0
Incr Delay(d2),s/veh 5.3 0.3 0.0 4.7 1.6 0.0 0.2 1.8 0.0 1.0 1.6 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 2.5 0.4 0.0 1.2 0.7 0.0 0.3 5.0 0.0 1.3 5.0 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 32.5 25.5 0.0 33.6 30.0 0.0 9.9 15.5 0.0 10.9 13.2 0.0
LnGrp LOS C C C C A B B B
Approach Vol,veh/h 185 116 994 1265
Approach Delay,s/veh 31.3 32.2 15.3 12.9
Approach LOS C C B B
Timer-Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc),s 10.3 32.6 12.0 7.0 35.9 8.9
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 7.9 28.1 18.0 5.0 31.0 18.0
Max Q Clear Time(g_c+I1),s 5.9 15.3 7.4 2.7 15.7 4.5
Green Ext Time(p-c),s 0.1 5.5 0.4 0.0 6.8 0.3
Intersection Summary
HCM 6th Ctrl Delay 16.0
HCM 6th LOS B
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 AM With Project Lako Protected
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. 4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 283 48 69 103 43 307 33 976 55 160 804 142
Future Volume(veh/h) 283 48 69 103 43 307 33 976 55 160 804 142
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1870 1870 1870 1856 1870 1870 1870 1870 1841 1811 1856 1870
Adj Flow Rate,veh/h 301 51 0 110 46 0 35 1038 0 170 855 0
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 2 2 2 3 2 2 2 2 4 6 3 2
Cap,veh/h 302 253 138 83 293 1097 194 1145
Arrive On Green 0.17 0.14 0.00 0.08 0.04 0.00 0.03 0.59 0.00 0.06 0.62 0.00
Sat Flow,veh/h 1781 1870 0 1767 1870 0 1781 1870 1560 1725 1856 1585
Grp Volume(v),veh/h 301 51 0 110 46 0 35 1038 0 170 855 0
Grp Sat Flow(s),veh/h/In 1781 1870 0 1767 1870 0 1781 1870 1560 1725 1856 1585
Q Serve(g_s),s 21.5 3.1 0.0 7.8 3.1 0.0 1.0 65.5 0.0 5.4 41.6 0.0
Cycle Q Clear(g_c),s 21.5 3.1 0.0 7.8 3.1 0.0 1.0 65.5 0.0 5.4 41.6 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 302 253 138 83 293 1097 194 1145
V/C Ratio(X) 1.00 0.20 0.80 0.56 0.12 0.95 0.87 0.75
Avail Cap(c_a),veh/h 302 324 250 272 314 1097 196 1145
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 52.7 48.8 0.0 57.6 59.5 0.0 15.6 24.4 0.0 32.1 17.3 0.0
Incr Delay(d2),s/veh 51.3 0.4 0.0 10.0 5.7 0.0 0.2 16.9 0.0 32.5 4.5 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 13.9 1.5 0.0 3.9 1.6 0.0 0.4 32.4 0.0 4.8 18.3 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 104.0 49.2 0.0 67.5 65.2 0.0 15.7 41.3 0.0 64.6 21.8 0.0
LnGrp LOS F D E E B D E C
Approach Vol,veh/h 352 156 1073 1025
Approach Delay,s/veh 96.1 66.8 40.5 28.9
Approach LOS F E D C
Timer-Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc),s 11.9 79.0 14.4 21.7 8.0 82.8 26.0 10.1
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 7.5 74.5 18.0 22.0 5.0 77.0 21.5 18.5
Max Q Clear Time(g_c+I1),s 7.4 67.5 9.8 5.1 3.0 43.6 23.5 5.1
Green Ext Time(p-c),s 0.0 4.3 0.1 0.1 0.0 7.9 0.0 0.1
Intersection Summary
HCM 6th Ctrl Delay 45.0
HCM 6th LOS D
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 AM With Project Lako Permissive
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. 4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 283 48 69 103 43 307 33 976 55 160 804 142
Future Volume(veh/h) 283 48 69 103 43 307 33 976 55 160 804 142
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1870 1870 1870 1856 1870 1870 1870 1870 1841 1811 1856 1870
Adj Flow Rate,veh/h 301 51 0 110 46 0 35 1038 0 170 855 0
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 2 2 2 3 2 2 2 2 4 6 3 2
Cap,veh/h 390 489 383 489 274 1050 178 1106
Arrive On Green 0.26 0.26 0.00 0.26 0.26 0.00 0.03 0.56 0.00 0.06 0.60 0.00
Sat Flow,veh/h 1358 1870 0 1341 1870 0 1781 1870 1560 1725 1856 1585
Grp Volume(v),veh/h 301 51 0 110 46 0 35 1038 0 170 855 0
Grp Sat Flow(s),veh/h/In 1358 1870 0 1341 1870 0 1781 1870 1560 1725 1856 1585
Q Serve(g_s),s 25.6 2.5 0.0 8.0 2.2 0.0 1.0 64.8 0.0 6.9 40.9 0.0
Cycle Q Clear(g_c),s 27.8 2.5 0.0 10.5 2.2 0.0 1.0 64.8 0.0 6.9 40.9 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 390 489 383 489 274 1050 178 1106
V/C Ratio(X) 0.77 0.10 0.29 0.09 0.13 0.99 0.96 0.77
Avail Cap(c_a),veh/h 637 829 627 829 298 1050 178 1106
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 43.6 33.2 0.0 37.2 33.1 0.0 16.2 25.6 0.0 36.5 17.9 0.0
Incr Delay(d2),s/veh 3.3 0.1 0.0 0.4 0.1 0.0 0.2 25.1 0.0 54.9 5.3 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 8.9 1.1 0.0 2.7 1.0 0.0 0.4 34.3 0.0 7.7 18.1 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 46.9 33.3 0.0 37.6 33.2 0.0 16.4 50.7 0.0 91.4 23.2 0.0
LnGrp LOS D C D C B D F C
Approach Vol,veh/h 352 156 1073 1025
Approach Delay,s/veh 44.9 36.3 49.6 34.5
Approach LOS D D D C
Timer-Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc),s 12.0 71.0 35.4 7.9 75.1 35.4
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 7.5 66.5 52.5 5.0 69.0 52.5
Max Q Clear Time(g_c+I1),s 8.9 66.8 29.8 3.0 42.9 12.5
Green Ext Time(p-c),s 0.0 0.0 1.2 0.0 7.3 0.6
Intersection Summary
HCM 6th Ctrl Delay 42.3
HCM 6th LOS D
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 AM With Project Lako Protected+Permitted
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. .4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 283 48 69 103 43 307 33 976 55 160 804 142
Future Volume(veh/h) 283 48 69 103 43 307 33 976 55 160 804 142
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1870 1870 1870 1856 1870 1870 1870 1870 1841 1811 1856 1870
Adj Flow Rate,veh/h 301 51 0 110 46 0 35 1038 0 170 855 0
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 2 2 2 3 2 2 2 2 4 6 3 2
Cap,veh/h 347 216 255 88 311 1120 210 1160
Arrive On Green 0.14 0.12 0.00 0.07 0.05 0.00 0.03 0.60 0.00 0.06 0.63 0.00
Sat Flow,veh/h 1781 1870 0 1767 1870 0 1781 1870 1560 1725 1856 1585
Grp Volume(v),veh/h 301 51 0 110 46 0 35 1038 0 170 855 0
Grp Sat Flow(s),veh/h/In 1781 1870 0 1767 1870 0 1781 1870 1560 1725 1856 1585
Q Serve(g_s),s 16.3 2.8 0.0 6.7 2.8 0.0 0.9 57.5 0.0 4.3 36.8 0.0
Cycle Q Clear(g_c),s 16.3 2.8 0.0 6.7 2.8 0.0 0.9 57.5 0.0 4.3 36.8 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 347 216 255 88 311 1120 210 1160
V/C Ratio(X) 0.87 0.24 0.43 0.52 0.11 0.93 0.81 0.74
Avail Cap(c_a),veh/h 347 427 264 308 337 1120 245 1160
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 44.2 46.2 0.0 47.4 53.5 0.0 13.4 20.8 0.0 26.6 15.0 0.0
Incr Delay(d2),s/veh 20.3 0.6 0.0 1.1 4.7 0.0 0.2 14.2 0.0 15.9 4.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 2.5 1.4 0.0 3.0 1.4 0.0 0.3 27.5 0.0 3.7 15.7 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 64.5 46.8 0.0 48.5 58.2 0.0 13.5 34.9 0.0 42.5 19.2 0.0
LnGrp LOS E D D E B C D B
Approach Vol,veh/h 352 156 1073 1025
Approach Delay,s/veh 61.9 51.4 34.2 23.0
Approach LOS E D C C
Timer-Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc),s 10.9 73.3 13.0 17.8 7.9 76.3 20.8 9.9
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 8.7 68.1 9.0 26.2 5.0 71.8 16.3 18.9
Max Q Clear Time(g_c+I1),s 6.3 59.5 8.7 4.8 2.9 38.8 18.3 4.8
Green Ext Time(p-c),s 0.1 5.1 0.0 0.2 0.0 7.8 0.0 0.1
Intersection Summary
HCM 6th Ctrl Delay 34.6
HCM 6th LOS C
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 AM With Project Lako 4-1-ane
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. .4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T tt r tt r
Traffic Volume(veh/h) 283 48 69 103 43 307 33 976 55 160 804 142
Future Volume(veh/h) 283 48 69 103 43 307 33 976 55 160 804 142
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1870 1870 1870 1856 1870 1870 1870 1870 1841 1811 1856 1870
Adj Flow Rate,veh/h 301 51 0 110 46 0 35 1038 0 170 855 0
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 2 2 2 3 2 2 2 2 4 6 3 2
Cap,veh/h 351 368 159 168 324 1392 309 1544
Arrive On Green 0.20 0.20 0.00 0.09 0.09 0.00 0.03 0.39 0.00 0.08 0.44 0.00
Sat Flow,veh/h 1781 1870 0 1767 1870 0 1781 3554 1560 1725 3526 1585
Grp Volume(v),veh/h 301 51 0 110 46 0 35 1038 0 170 855 0
Grp Sat Flow(s),veh/h/In 1781 1870 0 1767 1870 0 1781 1777 1560 1725 1763 1585
Q Serve(g_s),s 12.2 1.7 0.0 4.5 1.7 0.0 0.9 18.8 0.0 4.2 13.5 0.0
Cycle Q Clear(g_c),s 12.2 1.7 0.0 4.5 1.7 0.0 0.9 18.8 0.0 4.2 13.5 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 351 368 159 168 324 1392 309 1544
V/C Ratio(X) 0.86 0.14 0.69 0.27 0.11 0.75 0.55 0.55
Avail Cap(c_a),veh/h 441 463 425 450 382 1392 313 1544
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 29.0 24.8 0.0 33.0 31.8 0.0 13.3 19.5 0.0 14.8 15.6 0.0
Incr Delay(d2),s/veh 12.9 0.2 0.0 5.3 0.9 0.0 0.1 3.7 0.0 2.0 1.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 6.3 0.7 0.0 2.1 0.8 0.0 0.3 7.8 0.0 1.6 5.3 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 42.0 25.0 0.0 38.3 32.6 0.0 13.4 23.2 0.0 16.8 17.0 0.0
LnGrp LOS D C D C B C B B
Approach Vol,veh/h 352 156 1073 1025
Approach Delay,s/veh 39.5 36.6 22.9 17.0
Approach LOS D D C B
Timer-Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc),s 10.5 33.8 19.2 7.1 37.2 11.2
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 6.2 29.3 18.5 5.0 30.5 18.0
Max Q Clear Time(g_c+I1),s 6.2 20.8 14.2 2.9 15.5 6.5
Green Ext Time(p-c),s 0.0 4.5 0.5 0.0 5.3 0.4
Intersection Summary
HCM 6th Ctrl Delay 23.6
HCM 6th LOS C
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 PM With Project Lako Protected
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. 4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 152 30 48 77 42 233 37 981 64 200 1062 188
Future Volume(veh/h) 152 30 48 77 42 233 37 981 64 200 1062 188
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1841 1870 1870 1870 1826 1826 1856 1856 1870 1856 1870 1870
Adj Flow Rate,veh/h 158 31 0 80 44 0 39 1022 0 208 1106 0
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 4 2 2 2 5 5 3 3 2 3 2 2
Cap,veh/h 184 158 107 72 228 1234 289 1291
Arrive On Green 0.10 0.08 0.00 0.06 0.04 0.00 0.03 0.66 0.00 0.05 0.69 0.00
Sat Flow,veh/h 1753 1870 0 1781 1826 0 1767 1856 1585 1767 1870 1585
Grp Volume(v),veh/h 158 31 0 80 44 0 39 1022 0 208 1106 0
Grp Sat Flow(s),veh/h/In 1753 1870 0 1781 1826 0 1767 1856 1585 1767 1870 1585
Q Serve(g_s),s 11.7 2.0 0.0 5.8 3.1 0.0 0.9 54.2 0.0 4.8 59.1 0.0
Cycle Q Clear(g_c),s 11.7 2.0 0.0 5.8 3.1 0.0 0.9 54.2 0.0 4.8 59.1 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 184 158 107 72 228 1234 289 1291
V/C Ratio(X) 0.86 0.20 0.75 0.61 0.17 0.83 0.72 0.86
Avail Cap(c_a),veh/h 239 255 243 249 244 1234 375 1291
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 58.0 56.2 0.0 61.0 62.3 0.0 19.1 16.5 0.0 24.1 15.5 0.0
Incr Delay(d2),s/veh 20.9 0.6 0.0 9.8 8.1 0.0 0.4 6.5 0.0 4.6 7.5 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 6.3 1.0 0.0 2.9 1.6 0.0 0.6 23.6 0.0 4.5 25.6 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 78.9 56.8 0.0 70.8 70.4 0.0 19.5 23.0 0.0 28.8 23.0 0.0
LnGrp LOS E E E E B C C C
Approach Vol,veh/h 189 124 1061 1314
Approach Delay,s/veh 75.3 70.7 22.8 23.9
Approach LOS E E C C
Timer-Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc),s 11.6 92.2 12.4 15.6 8.3 95.5 18.3 9.7
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 13.5 82.5 18.0 18.0 5.0 91.0 18.0 18.0
Max Q Clear Time(g_c+I1),s 6.8 56.2 7.8 4.0 2.9 61.1 13.7 5.1
Green Ext Time(p-c),s 0.3 9.9 0.1 0.1 0.0 12.1 0.1 0.1
Intersection Summary
HCM 6th Ctrl Delay 29.2
HCM 6th LOS C
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 PM With Project Lako Permissive
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. 4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 152 30 48 77 42 233 37 981 64 200 1062 188
Future Volume(veh/h) 152 30 48 77 42 233 37 981 64 200 1062 188
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1841 1870 1870 1870 1826 1826 1856 1856 1870 1856 1870 1870
Adj Flow Rate,veh/h 158 31 0 80 44 0 39 1022 0 208 1106 0
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 4 2 2 2 5 5 3 3 2 3 2 2
Cap,veh/h 241 294 256 287 250 1260 310 1314
Arrive On Green 0.16 0.16 0.00 0.16 0.16 0.00 0.03 0.68 0.00 0.05 0.70 0.00
Sat Flow,veh/h 1341 1870 0 1378 1826 0 1767 1856 1585 1767 1870 1585
Grp Volume(v),veh/h 158 31 0 80 44 0 39 1022 0 208 1106 0
Grp Sat Flow(s),veh/h/In 1341 1870 0 1378 1826 0 1767 1856 1585 1767 1870 1585
Q Serve(g_s),s 14.1 1.7 0.0 6.5 2.5 0.0 0.8 48.2 0.0 4.3 52.6 0.0
Cycle Q Clear(g_c),s 16.7 1.7 0.0 8.2 2.5 0.0 0.8 48.2 0.0 4.3 52.6 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 241 294 256 287 250 1260 310 1314
V/C Ratio(X) 0.65 0.11 0.31 0.15 0.16 0.81 0.67 0.84
Avail Cap(c_a),veh/h 420 543 439 530 269 1260 393 1314
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 51.8 44.2 0.0 47.7 44.6 0.0 16.2 14.0 0.0 20.4 13.2 0.0
Incr Delay(d2),s/veh 3.0 0.2 0.0 0.7 0.2 0.0 0.3 5.8 0.0 3.0 6.6 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 4.9 0.8 0.0 2.3 1.2 0.0 0.5 20.3 0.0 3.8 22.0 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 54.8 44.4 0.0 48.4 44.8 0.0 16.5 19.8 0.0 23.4 19.9 0.0
LnGrp LOS D D D D B B C B
Approach Vol,veh/h 189 124 1061 1314
Approach Delay,s/veh 53.1 47.1 19.7 20.4
Approach LOS D D B C
Timer-Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc),s 11.1 87.6 23.7 8.2 90.5 23.7
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 12.3 78.7 35.5 5.0 86.0 35.5
Max Q Clear Time(g_c+I1),s 6.3 50.2 18.7 2.8 54.6 10.2
Green Ext Time(p-c),s 0.3 10.3 0.5 0.0 12.4 0.4
Intersection Summary
HCM 6th Ctrl Delay 23.7
HCM 6th LOS C
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 PM With Project Lako Protected+Permitted
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. .4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 152 30 48 77 42 233 37 981 64 200 1062 188
Future Volume(veh/h) 152 30 48 77 42 233 37 981 64 200 1062 188
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1841 1870 1870 1870 1826 1826 1856 1856 1870 1856 1870 1870
Adj Flow Rate,veh/h 158 31 0 80 44 0 39 1022 0 208 1106 0
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 4 2 2 2 5 5 3 3 2 3 2 2
Cap,veh/h 219 119 217 78 246 1245 307 1302
Arrive On Green 0.07 0.06 0.00 0.05 0.04 0.00 0.03 0.67 0.00 0.06 0.70 0.00
Sat Flow,veh/h 1753 1870 0 1781 1826 0 1767 1856 1585 1767 1870 1585
Grp Volume(v),veh/h 158 31 0 80 44 0 39 1022 0 208 1106 0
Grp Sat Flow(s),veh/h/In 1753 1870 0 1781 1826 0 1767 1856 1585 1767 1870 1585
Q Serve(g_s),s 8.6 1.8 0.0 4.9 2.7 0.0 0.8 46.6 0.0 4.2 50.8 0.0
Cycle Q Clear(g_c),s 8.6 1.8 0.0 4.9 2.7 0.0 0.8 46.6 0.0 4.2 50.8 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 219 119 217 78 246 1245 307 1302
V/C Ratio(X) 0.72 0.26 0.37 0.56 0.16 0.82 0.68 0.85
Avail Cap(c_a),veh/h 219 330 217 284 268 1245 388 1302
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 49.9 51.5 0.0 49.4 54.2 0.0 16.0 13.9 0.0 20.2 13.1 0.0
Incr Delay(d2),s/veh 11.1 1.1 0.0 1.0 6.1 0.0 0.3 6.1 0.0 3.3 7.1 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 5.2 0.9 0.0 2.2 1.4 0.0 0.5 19.6 0.0 3.7 21.2 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 61.0 52.6 0.0 50.4 60.4 0.0 16.3 20.1 0.0 23.4 20.2 0.0
LnGrp LOS E D D E B C C C
Approach Vol,veh/h 189 124 1061 1314
Approach Delay,s/veh 59.7 53.9 19.9 20.7
Approach LOS E D B C
Timer-Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc),s 10.9 82.0 10.7 11.9 8.1 84.9 13.1 9.5
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 11.7 73.7 6.2 20.4 5.0 80.4 8.6 18.0
Max Q Clear Time(g_c+I1),s 6.2 48.6 6.9 3.8 2.8 52.8 10.6 4.7
Green Ext Time(p-c),s 0.3 9.7 0.0 0.1 0.0 11.7 0.0 0.1
Intersection Summary
HCM 6th Ctrl Delay 24.6
HCM 6th LOS C
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 PM With Project Lako 4-1-ane
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. .4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T tt r tt r
Traffic Volume(veh/h) 152 30 48 77 42 233 37 981 64 200 1062 188
Future Volume(veh/h) 152 30 48 77 42 233 37 981 64 200 1062 188
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1841 1870 1870 1870 1826 1826 1856 1856 1870 1856 1870 1870
Adj Flow Rate,veh/h 158 31 0 80 44 0 39 1022 0 208 1106 0
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 4 2 2 2 5 5 3 3 2 3 2 2
Cap,veh/h 211 225 126 129 312 1544 388 1743
Arrive On Green 0.12 0.12 0.00 0.07 0.07 0.00 0.04 0.44 0.00 0.09 0.49 0.00
Sat Flow,veh/h 1753 1870 0 1781 1826 0 1767 3526 1585 1767 3554 1585
Grp Volume(v),veh/h 158 31 0 80 44 0 39 1022 0 208 1106 0
Grp Sat Flow(s),veh/h/In 1753 1870 0 1781 1826 0 1767 1763 1585 1767 1777 1585
Q Serve(g_s),s 5.6 1.0 0.0 2.8 1.5 0.0 0.8 14.8 0.0 3.9 14.8 0.0
Cycle Q Clear(g_c),s 5.6 1.0 0.0 2.8 1.5 0.0 0.8 14.8 0.0 3.9 14.8 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 211 225 126 129 312 1544 388 1743
V/C Ratio(X) 0.75 0.14 0.63 0.34 0.12 0.66 0.54 0.63
Avail Cap(c_a),veh/h 490 523 498 510 381 1544 440 1743
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 27.4 25.3 0.0 29.1 28.5 0.0 10.1 14.3 0.0 10.7 12.1 0.0
Incr Delay(d2),s/veh 5.3 0.3 0.0 5.2 1.5 0.0 0.2 2.2 0.0 1.2 1.8 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 2.5 0.4 0.0 1.3 0.7 0.0 0.3 5.6 0.0 1.4 5.4 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 32.7 25.6 0.0 34.3 30.0 0.0 10.3 16.6 0.0 11.8 13.9 0.0
LnGrp LOS C C C C B B B B
Approach Vol,veh/h 189 124 1061 1314
Approach Delay,s/veh 31.5 32.8 16.3 13.6
Approach LOS C C B B
Timer-Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc),s 10.4 32.7 12.2 7.0 36.1 9.1
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 7.8 28.2 18.0 5.0 31.0 18.0
Max Q Clear Time(g_c+I1),s 5.9 16.8 7.6 2.8 16.8 4.8
Green Ext Time(p-c),s 0.1 5.5 0.4 0.0 6.8 0.3
Intersection Summary
HCM 6th Ctrl Delay 16.8
HCM 6th LOS B
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 AM With Project Lako Protected
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. 4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 283 48 69 103 43 307 33 1067 55 160 878 142
Future Volume(veh/h) 283 48 69 103 43 307 33 1067 55 160 878 142
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1870 1870 1870 1856 1870 1870 1870 1870 1841 1811 1856 1870
Adj Flow Rate,veh/h 301 51 0 110 46 0 35 1135 0 170 934 0
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 2 2 2 3 2 2 2 2 4 6 3 2
Cap,veh/h 296 248 136 81 255 1126 149 1170
Arrive On Green 0.17 0.13 0.00 0.08 0.04 0.00 0.03 0.60 0.00 0.06 0.63 0.00
Sat Flow,veh/h 1781 1870 0 1767 1870 0 1781 1870 1560 1725 1856 1585
Grp Volume(v),veh/h 301 51 0 110 46 0 35 1135 0 170 934 0
Grp Sat Flow(s),veh/h/In 1781 1870 0 1767 1870 0 1781 1870 1560 1725 1856 1585
Q Serve(g_s),s 22.5 3.3 0.0 8.3 3.3 0.0 1.0 81.5 0.0 7.5 50.7 0.0
Cycle Q Clear(g_c),s 22.5 3.3 0.0 8.3 3.3 0.0 1.0 81.5 0.0 7.5 50.7 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 296 248 136 81 255 1126 149 1170
V/C Ratio(X) 1.02 0.21 0.81 0.57 0.14 1.01 1.14 0.80
Avail Cap(c_a),veh/h 296 345 235 283 272 1126 149 1170
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 56.4 52.4 0.0 61.5 63.5 0.0 18.1 26.9 0.0 46.5 18.6 0.0
Incr Delay(d2),s/veh 56.6 0.4 0.0 10.7 6.1 0.0 0.2 28.7 0.0 117.3 5.7 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 14.8 1.6 0.0 4.1 1.7 0.0 0.4 43.2 0.0 10.0 22.6 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 113.0 52.8 0.0 72.2 69.6 0.0 18.3 55.7 0.0 163.8 24.3 0.0
LnGrp LOS F D E E B F F C
Approach Vol,veh/h 352 156 1170 1104
Approach Delay,s/veh 104.3 71.4 54.6 45.8
Approach LOS F E D D
Timer-Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc),s 12.0 86.0 14.9 22.4 8.2 89.8 27.0 10.4
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 7.5 81.5 18.0 25.0 5.0 84.0 22.5 20.5
Max Q Clear Time(g_c+I1),s 9.5 83.5 10.3 5.3 3.0 52.7 24.5 5.3
Green Ext Time(p-c),s 0.0 0.0 0.1 0.2 0.0 9.0 0.0 0.1
Intersection Summary
HCM 6th Ctrl Delay 58.3
HCM 6th LOS E
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 AM With Project Lako Permissive
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. 4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 283 48 69 103 43 307 33 1067 55 160 878 142
Future Volume(veh/h) 283 48 69 103 43 307 33 1067 55 160 878 142
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1870 1870 1870 1856 1870 1870 1870 1870 1841 1811 1856 1870
Adj Flow Rate,veh/h 301 51 0 110 46 0 35 1135 0 170 934 0
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 2 2 2 3 2 2 2 2 4 6 3 2
Cap,veh/h 389 488 382 488 225 1070 154 1109
Arrive On Green 0.26 0.26 0.00 0.26 0.26 0.00 0.03 0.57 0.00 0.05 0.60 0.00
Sat Flow,veh/h 1358 1870 0 1341 1870 0 1781 1870 1560 1725 1856 1585
Grp Volume(v),veh/h 301 51 0 110 46 0 35 1135 0 170 934 0
Grp Sat Flow(s),veh/h/In 1358 1870 0 1341 1870 0 1781 1870 1560 1725 1856 1585
Q Serve(g_s),s 25.8 2.5 0.0 8.1 2.2 0.0 1.0 68.5 0.0 6.5 48.8 0.0
Cycle Q Clear(g_c),s 28.1 2.5 0.0 10.6 2.2 0.0 1.0 68.5 0.0 6.5 48.8 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 389 488 382 488 225 1070 154 1109
V/C Ratio(X) 0.77 0.10 0.29 0.09 0.16 1.06 1.11 0.84
Avail Cap(c_a),veh/h 619 804 609 804 248 1070 154 1109
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 44.2 33.6 0.0 37.7 33.5 0.0 19.0 25.6 0.0 38.1 19.5 0.0
Incr Delay(d2),s/veh 3.3 0.1 0.0 0.4 0.1 0.0 0.3 45.2 0.0 103.7 7.8 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 9.0 1.1 0.0 2.7 1.0 0.0 0.4 41.8 0.0 9.1 22.1 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 47.5 33.7 0.0 38.1 33.6 0.0 19.3 70.8 0.0 141.8 27.3 0.0
LnGrp LOS D C D C B F F C
Approach Vol,veh/h 352 156 1170 1104
Approach Delay,s/veh 45.5 36.7 69.3 45.0
Approach LOS D D E D
Timer-Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc),s 11.0 73.0 35.8 7.9 76.1 35.8
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 6.5 68.5 51.5 5.0 70.0 51.5
Max Q Clear Time(g_c+I1),s 8.5 70.5 30.1 3.0 50.8 12.6
Green Ext Time(p-c),s 0.0 0.0 1.2 0.0 7.4 0.6
Intersection Summary
HCM 6th Ctrl Delay 54.8
HCM 6th LOS D
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 AM With Project Lako Protected+Permitted
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. .4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 283 48 69 103 43 307 33 1067 55 160 878 142
Future Volume(veh/h) 283 48 69 103 43 307 33 1067 55 160 878 142
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 0.99 1.00 0.99 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1870 1870 1870 1856 1870 1870 1870 1870 1841 1811 1856 1870
Adj Flow Rate,veh/h 301 51 0 110 46 0 35 1135 0 170 934 0
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 2 2 2 3 2 2 2 2 4 6 3 2
Cap,veh/h 301 175 244 83 301 1184 191 1233
Arrive On Green 0.12 0.09 0.00 0.07 0.04 0.00 0.03 0.63 0.00 0.06 0.66 0.00
Sat Flow,veh/h 1781 1870 0 1767 1870 0 1781 1870 1560 1725 1856 1585
Grp Volume(v),veh/h 301 51 0 110 46 0 35 1135 0 170 934 0
Grp Sat Flow(s),veh/h/In 1781 1870 0 1767 1870 0 1781 1870 1560 1725 1856 1585
Q Serve(g_s),s 15.5 3.2 0.0 7.5 3.1 0.0 0.9 72.0 0.0 5.8 43.2 0.0
Cycle Q Clear(g_c),s 15.5 3.2 0.0 7.5 3.1 0.0 0.9 72.0 0.0 5.8 43.2 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 301 175 244 83 301 1184 191 1233
V/C Ratio(X) 1.00 0.29 0.45 0.56 0.12 0.96 0.89 0.76
Avail Cap(c_a),veh/h 301 362 246 272 321 1184 191 1233
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 52.4 53.7 0.0 52.8 59.5 0.0 13.9 21.7 0.0 37.0 14.4 0.0
Incr Delay(d2),s/veh 51.8 0.9 0.0 1.3 5.7 0.0 0.2 17.9 0.0 36.8 4.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 6.4 1.6 0.0 3.4 1.6 0.0 0.3 35.0 0.0 7.3 18.4 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 104.2 54.6 0.0 54.1 65.3 0.0 14.1 39.6 0.0 73.8 18.8 0.0
LnGrp LOS F D D E B D E B
Approach Vol,veh/h 352 156 1170 1104
Approach Delay,s/veh 97.0 57.4 38.9 27.3
Approach LOS F E D C
Timer-Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc),s 12.0 85.0 13.8 16.4 8.0 89.0 20.0 10.1
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 7.5 80.5 9.4 24.6 5.0 83.0 15.5 18.5
Max Q Clear Time(g_c+I1),s 7.8 74.0 9.5 5.2 2.9 45.2 17.5 5.1
Green Ext Time(p-c),s 0.0 4.5 0.0 0.2 0.0 9.5 0.0 0.1
Intersection Summary
HCM 6th Ctrl Delay 42.7
HCM 6th LOS D
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2029 AM With Project Lako 4-1-ane
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. .4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T tt r tt r
Traffic Volume(veh/h) 283 48 69 103 43 307 33 1067 55 160 878 142
Future Volume(veh/h) 283 48 69 103 43 307 33 1067 55 160 878 142
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1870 1870 1870 1856 1870 1870 1870 1870 1841 1811 1856 1870
Adj Flow Rate,veh/h 301 51 0 110 46 0 35 1135 0 170 934 0
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 2 2 2 3 2 2 2 2 4 6 3 2
Cap,veh/h 349 367 159 168 301 1415 285 1557
Arrive On Green 0.20 0.20 0.00 0.09 0.09 0.00 0.03 0.40 0.00 0.08 0.44 0.00
Sat Flow,veh/h 1781 1870 0 1767 1870 0 1781 3554 1560 1725 3526 1585
Grp Volume(v),veh/h 301 51 0 110 46 0 35 1135 0 170 934 0
Grp Sat Flow(s),veh/h/In 1781 1870 0 1767 1870 0 1781 1777 1560 1725 1763 1585
Q Serve(g_s),s 12.4 1.7 0.0 4.6 1.7 0.0 0.9 21.4 0.0 4.2 15.2 0.0
Cycle Q Clear(g_c),s 12.4 1.7 0.0 4.6 1.7 0.0 0.9 21.4 0.0 4.2 15.2 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 349 367 159 168 301 1415 285 1557
V/C Ratio(X) 0.86 0.14 0.69 0.27 0.12 0.80 0.60 0.60
Avail Cap(c_a),veh/h 424 445 421 445 357 1415 285 1557
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 29.4 25.1 0.0 33.4 32.1 0.0 13.4 20.1 0.0 15.9 16.0 0.0
Incr Delay(d2),s/veh 14.3 0.2 0.0 5.3 0.9 0.0 0.2 4.9 0.0 3.3 1.7 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 6.5 0.8 0.0 2.1 0.8 0.0 0.3 9.1 0.0 1.8 6.0 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 43.7 25.3 0.0 38.7 33.0 0.0 13.6 25.0 0.0 19.3 17.7 0.0
LnGrp LOS D C D C B C B B
Approach Vol,veh/h 352 156 1170 1104
Approach Delay,s/veh 41.0 37.0 24.7 18.0
Approach LOS D D C B
Timer-Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc),s 10.4 34.6 19.3 7.1 37.9 11.3
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 5.9 30.1 18.0 5.0 31.0 18.0
Max Q Clear Time(g_c+I1),s 6.2 23.4 14.4 2.9 17.2 6.6
Green Ext Time(p-c),s 0.0 4.1 0.4 0.0 5.6 0.4
Intersection Summary
HCM 6th Ctrl Delay 24.8
HCM 6th LOS C
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2039 PM With Project Lako Protected
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. 4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 152 30 48 77 42 233 37 1068 64 200 1163 188
Future Volume(veh/h) 152 30 48 77 42 233 37 1068 64 200 1163 188
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1841 1870 1870 1870 1826 1826 1856 1856 1870 1856 1870 1870
Adj Flow Rate,veh/h 158 31 0 80 44 0 39 1112 0 208 1211 0
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 4 2 2 2 5 5 3 3 2 3 2 2
Cap,veh/h 174 155 101 73 162 1219 236 1286
Arrive On Green 0.10 0.08 0.00 0.06 0.04 0.00 0.03 0.66 0.00 0.06 0.69 0.00
Sat Flow,veh/h 1753 1870 0 1781 1826 0 1767 1856 1585 1767 1870 1585
Grp Volume(v),veh/h 158 31 0 80 44 0 39 1112 0 208 1211 0
Grp Sat Flow(s),veh/h/In 1753 1870 0 1781 1826 0 1767 1856 1585 1767 1870 1585
Q Serve(g_s),s 11.2 1.9 0.0 5.6 3.0 0.0 0.9 64.5 0.0 5.3 72.1 0.0
Cycle Q Clear(g_c),s 11.2 1.9 0.0 5.6 3.0 0.0 0.9 64.5 0.0 5.3 72.1 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 174 155 101 73 162 1219 236 1286
V/C Ratio(X) 0.91 0.20 0.79 0.60 0.24 0.91 0.88 0.94
Avail Cap(c_a),veh/h 174 314 133 261 180 1219 291 1286
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 56.1 53.8 0.0 58.6 59.4 0.0 26.6 18.5 0.0 32.0 17.4 0.0
Incr Delay(d2),s/veh 42.6 0.6 0.0 20.7 7.6 0.0 0.8 11.8 0.0 22.2 14.5 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 7.0 0.9 0.0 3.1 1.5 0.0 0.7 29.3 0.0 5.7 32.7 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 98.7 54.4 0.0 79.3 67.0 0.0 27.3 30.3 0.0 54.3 31.9 0.0
LnGrp LOS F D E E C C D C
Approach Vol,veh/h 189 124 1151 1419
Approach Delay,s/veh 91.4 74.9 30.2 35.2
Approach LOS F E C D
Timer-Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc),s 12.1 87.1 11.6 14.9 8.2 91.0 17.0 9.6
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 11.5 80.0 9.4 21.1 5.0 86.5 12.5 18.0
Max Q Clear Time(g_c+I1),s 7.3 66.5 7.6 3.9 2.9 74.1 13.2 5.0
Green Ext Time(p-c),s 0.2 7.7 0.0 0.1 0.0 8.1 0.0 0.1
Intersection Summary
HCM 6th Ctrl Delay 38.6
HCM 6th LOS D
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2039 PM With Project Lako Permissive
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. 4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 152 30 48 77 42 233 37 1068 64 200 1163 188
Future Volume(veh/h) 152 30 48 77 42 233 37 1068 64 200 1163 188
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1841 1870 1870 1870 1826 1826 1856 1856 1870 1856 1870 1870
Adj Flow Rate,veh/h 158 31 0 80 44 0 39 1112 0 208 1211 0
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 4 2 2 2 5 5 3 3 2 3 2 2
Cap,veh/h 247 295 261 288 177 1241 248 1297
Arrive On Green 0.16 0.16 0.00 0.16 0.16 0.00 0.03 0.67 0.00 0.06 0.69 0.00
Sat Flow,veh/h 1341 1870 0 1378 1826 0 1767 1856 1585 1767 1870 1585
Grp Volume(v),veh/h 158 31 0 80 44 0 39 1112 0 208 1211 0
Grp Sat Flow(s),veh/h/In 1341 1870 0 1378 1826 0 1767 1856 1585 1767 1870 1585
Q Serve(g_s),s 13.2 1.6 0.0 6.0 2.4 0.0 0.8 56.8 0.0 4.2 64.6 0.0
Cycle Q Clear(g_c),s 15.6 1.6 0.0 7.7 2.4 0.0 0.8 56.8 0.0 4.2 64.6 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 247 295 261 288 177 1241 248 1297
V/C Ratio(X) 0.64 0.10 0.31 0.15 0.22 0.90 0.84 0.93
Avail Cap(c_a),veh/h 409 522 428 510 199 1241 315 1297
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 48.4 41.3 0.0 44.6 41.7 0.0 23.5 15.7 0.0 26.5 15.3 0.0
Incr Delay(d2),s/veh 2.8 0.2 0.0 0.7 0.2 0.0 0.6 10.3 0.0 14.6 13.5 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 4.6 0.8 0.0 2.1 1.1 0.0 0.6 24.8 0.0 4.9 28.5 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 51.2 41.5 0.0 45.3 41.9 0.0 24.1 26.0 0.0 41.1 28.8 0.0
LnGrp LOS D D D D C C D C
Approach Vol,veh/h 189 124 1151 1419
Approach Delay,s/veh 49.6 44.1 25.9 30.6
Approach LOS D D C C
Timer-Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc),s 10.9 81.2 22.6 8.1 84.0 22.6
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 10.7 73.8 32.0 5.0 79.5 32.0
Max Q Clear Time(g_c+I1),s 6.2 58.8 17.6 2.8 66.6 9.7
Green Ext Time(p-c),s 0.2 8.3 0.5 0.0 8.4 0.4
Intersection Summary
HCM 6th Ctrl Delay 30.5
HCM 6th LOS C
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2039 PM With Project Lako Protected+Permitted
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. .4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T t r f r
Traffic Volume(veh/h) 152 30 48 77 42 233 37 1068 64 200 1163 188
Future Volume(veh/h) 152 30 48 77 42 233 37 1068 64 200 1163 188
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1841 1870 1870 1870 1826 1826 1856 1856 1870 1856 1870 1870
Adj Flow Rate,veh/h 158 31 0 80 44 0 39 1112 0 208 1211 0
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 4 2 2 2 5 5 3 3 2 3 2 2
Cap,veh/h 198 120 189 71 209 1315 277 1364
Arrive On Green 0.07 0.06 0.00 0.05 0.04 0.00 0.03 0.71 0.00 0.05 0.73 0.00
Sat Flow,veh/h 1753 1870 0 1781 1826 0 1767 1856 1585 1767 1870 1585
Grp Volume(v),veh/h 158 31 0 80 44 0 39 1112 0 208 1211 0
Grp Sat Flow(s),veh/h/In 1753 1870 0 1781 1826 0 1767 1856 1585 1767 1870 1585
Q Serve(g_s),s 9.7 2.1 0.0 5.9 3.2 0.0 0.8 59.4 0.0 4.4 67.7 0.0
Cycle Q Clear(g_c),s 9.7 2.1 0.0 5.9 3.2 0.0 0.8 59.4 0.0 4.4 67.7 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 198 120 189 71 209 1315 277 1364
V/C Ratio(X) 0.80 0.26 0.42 0.62 0.19 0.85 0.75 0.89
Avail Cap(c_a),veh/h 198 294 189 241 224 1315 365 1364
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 59.2 60.7 0.0 59.6 64.4 0.0 21.7 14.4 0.0 26.6 14.2 0.0
Incr Delay(d2),s/veh 19.9 1.1 0.0 1.5 8.4 0.0 0.4 6.8 0.0 6.1 8.9 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 1.9 1.1 0.0 2.7 1.7 0.0 0.7 25.1 0.0 5.3 28.6 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 79.1 61.8 0.0 61.1 72.8 0.0 22.1 21.3 0.0 32.7 23.0 0.0
LnGrp LOS E E E E C C C C
Approach Vol,veh/h 189 124 1151 1419
Approach Delay,s/veh 76.3 65.3 21.3 24.5
Approach LOS E E C C
Timer-Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc),s 11.2 101.0 10.8 13.2 8.4 103.8 14.2 9.8
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 13.5 90.8 6.3 21.4 5.0 99.3 9.7 18.0
Max Q Clear Time(g_c+I1),s 6.4 61.4 7.9 4.1 2.8 69.7 11.7 5.2
Green Ext Time(p-c),s 0.3 12.2 0.0 0.1 0.0 14.4 0.0 0.1
Intersection Summary
HCM 6th Ctrl Delay 28.4
HCM 6th LOS C
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary 2039 PM With Project Lako 4-1-ane
7: Route 11 & Lako Street /Lako Street 1I12/07/2022
--1. .4--- t i
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations T+ T tt r tt r
Traffic Volume(veh/h) 152 30 48 77 42 233 37 1068 64 200 1163 188
Future Volume(veh/h) 152 30 48 77 42 233 37 1068 64 200 1163 188
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1841 1870 1870 1870 1826 1826 1856 1856 1870 1856 1870 1870
Adj Flow Rate,veh/h 158 31 0 80 44 0 39 1112 0 208 1211 0
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 4 2 2 2 5 5 3 3 2 3 2 2
Cap,veh/h 210 224 126 129 286 1563 364 1757
Arrive On Green 0.12 0.12 0.00 0.07 0.07 0.00 0.04 0.44 0.00 0.09 0.49 0.00
Sat Flow,veh/h 1753 1870 0 1781 1826 0 1767 3526 1585 1767 3554 1585
Grp Volume(v),veh/h 158 31 0 80 44 0 39 1112 0 208 1211 0
Grp Sat Flow(s),veh/h/In 1753 1870 0 1781 1826 0 1767 1763 1585 1767 1777 1585
Q Serve(g_s),s 5.7 1.0 0.0 2.8 1.5 0.0 0.8 16.7 0.0 3.9 17.0 0.0
Cycle Q Clear(g_c),s 5.7 1.0 0.0 2.8 1.5 0.0 0.8 16.7 0.0 3.9 17.0 0.0
Prop In Lane 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c),veh/h 210 224 126 129 286 1563 364 1757
V/C Ratio(X) 0.75 0.14 0.64 0.34 0.14 0.71 0.57 0.69
Avail Cap(c_a),veh/h 484 516 492 504 353 1563 397 1757
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay(d),s/veh 27.7 25.7 0.0 29.5 28.9 0.0 10.5 14.8 0.0 11.6 12.6 0.0
Incr Delay(d2),s/veh 5.3 0.3 0.0 5.2 1.6 0.0 0.2 2.8 0.0 1.7 2.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 2.6 0.4 0.0 1.3 0.7 0.0 0.3 6.5 0.0 1.4 6.3 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 33.1 26.0 0.0 34.7 30.4 0.0 10.7 17.5 0.0 13.3 14.9 0.0
LnGrp LOS C C C C B B B B
Approach Vol,veh/h 189 124 1151 1419
Approach Delay,s/veh 31.9 33.2 17.3 14.6
Approach LOS C C B B
Timer-Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc),s 10.4 33.4 12.3 7.0 36.7 9.1
Change Period(Y+Rc),s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting(Gmax),s 7.1 28.9 18.0 5.0 31.0 18.0
Max Q Clear Time(g_c+I1),s 5.9 18.7 7.7 2.8 19.0 4.8
Green Ext Time(p-c),s 0.1 5.5 0.4 0.0 6.7 0.3
Intersection Summary
HCM 6th Ctrl Delay 17.6
HCM 6th LOS B
Notes
Unsignalized Delay for[NBR, EBR,WBR, SBR]is excluded from calculations of the approach delay and intersection delay.
5:00 pm Baseline Synchro 10 Report
Page 1