Laserfiche WebLink
They would like to begin construction, if all of the permits can be secured, you know, <br />beginning in the year 2005, with an anticipated build-out over 10 or 15 years. They have <br />applied for essentially two requests, one is the Project District rezoning and the other one <br />is a Special Management Area. The Project District zoning is being requested because of <br />the exact location or the type of land uses, the density. TheyÓll have to vary according to, <br />to accommodate the demand or the time. As such the plan before <br />board right now is purely conceptual. And the request is not to establish a specific <br />Commercial zone, a specific Residential Zone, or a specific office zone but to provide a <br />design or zoning flexibility, a land use flexibility, vis-à-vis the Project District zoning. <br />What you see before you and whatÓs contained in the application represents like a worst <br />case or like a maximum density potential; and this is just to help with the evaluation. As <br />such, if approved, there will be conditions that would establish maximum building <br />envelope and constraints. Generally, when you have a Project District, in my experience, <br />you donÓt find that a person maximizes the, what was considered by the Project District; <br />and a good case in point is the Project District that was approved for both Maniniowale as <br />well as for Hualalai. In the situation with the Maniniowale Project District, the approved <br />project called for in excess of 900 units, and what you see right now is a little more than <br />150 maximum units in that area. <br />Relative to this specific site itself, in terms of the public access, the access to the makai <br />property, and through this property, and eventually to the shoreline will be provided. In <br />terms of archaeological, there is a Mamalahoa trail that will be preserved with a <br />50-foot wide buffer. ThereÓs also a habitation cave adjacent to the Mamalahoa Trail, and <br />that habitation cave will also be preserved. <br />As the Planning Director had noted earlier, based on the Traffic Impact Analysis Report, <br />a fully channelized intersection would be constructed by the developer and traffic lights <br />will be constructed, when warranted by, at no cost to the County <br />developer. There would also be a north-south connector road to NELHA as well as to the <br />south to Kohanaiki. <br />There is an existing easement over the Mamalahoa Trail from the State that runs through <br />the year 2007 that allows for access to the Kohanaiki property to the south as well as, that <br />allows the Kohanaiki, that allows access to the Kohanaiki property as well as the property <br />makai of Ooma. <br />The Applicant is willing and actually would encourage that access through this site to <br />minimize the number of access points on Queen Kaahumanu Highway, <br />proximity to the Kohanaiki Business Park. The long and short of it is that, you know, we <br />would encourage that should the Commission and the Department favorably consider this <br />application that there would be a condition that would allow for the landowner to <br />immediately set aside the required right-of-way to allow for adjoining properties to gain <br />access through the site to eventually hookup to the Queen Kaahumanu Highway and <br />thereby trying to minimize the number of access points along the <br />7 <br /> <br />