Laserfiche WebLink
rezoning and the topography of this location of concern is in enclosure 4. And you can see <br />the elevation of the land where it€s from 38 and itgoesall the way down to 28, 2800. I <br />strongly recommend this Planning Committee consider and solve all my issues prior to <br />recommending or granting rezoning of these lots for future development. I would like to be <br />heard at the public hearing today. <br />SPRINGER:Thank you ma€am. Commissioners do you have any questions of the <br />testifier? Commissioner Graham? <br />GRAHAM:Excuse me. Ms. Frias? <br />FRIAS:Yes. <br />GRAHAM:We€re going to learn a lot more as this goes along but just kind of off <br />thetopofmyheadsincethisisbeingputinto5-.Thisisbeingrequestedas5-acre <br />agricultural lots I wouldn€t think on the face of it there would be a lot of change to the <br />topography and to the water movements and things like that with runoff. So I€m kind of <br />wondering whether you€re thinking that if we grant this there will be a change and your water <br />situation might get worse as far as runoff or are you thinking if this applicant wants to make <br />this change he should actually improve the water situation that presently exists, which is not <br />very good for you. Or are either one of those sort of points of view where you€re coming <br />from or do you have something different? <br />FRIAS:No I have something different there. The grade of the land that <br />presently on those 2 lots, they€re the highest lots. And that€s where a lot of the water just <br />rushes down. And if they change the grade of that land it€s going to make it worse. If you <br />noted in my enclosure number 2 water comes from 2 areas. And it€s not a small amount of <br />water and it€s not a hundred year flood either, which I€ve had comments somebody said. Well <br />we€ve had a lot of water. I€ve lived there for 8 years now and I€ve had the property for 13. <br />And the slope of this property is my concern and also there is nothing that would take that <br />water away from us if it was to be developed in that area. So if they€re going to subdivide this <br />I would like to see on my side of the property some kind of water-, some engineer come in <br />and put in some kind of infrastructure for that water to flow away from us and not head <br />straight for us. <br />GRAHAM:Thank you. <br />SPRINGER:Commissioner Alameda? <br />ALAMEDA:Ms. Frias did you get? Do we allow the testifiers to have a copy of <br />this? Just wondering. Or I mean-. <br />SPRINGER:Copy of Conditions. <br />ALAMEDA:Do they get preview to this prior to coming or no? <br />HAYASHI:No they don€t. <br />EXHIBIT F <br />5 <br /> <br />