My WebLink
|
Help
|
About
|
Sign Out
Home
2004-10-01 THOLMES
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2004
>
2004-10-01 THOLMES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2011 10:48:40 AM
Creation date
6/14/2011 10:48:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GRAHAM:I would move that we bring this,we continue any action on this <br />particular application until a further meeting subsequent to the Applicants representative <br />being able to get back to us with information regarding wastewater? <br />SPRINGER:In a future meeting, will that be the next Kona meeting? <br />GRAHAM:Whatever meets his schedule for what he can effectively <br />accomplish what I think would be helpful to the Commission. <br />SPRINGER:Mr. Mooers, would you like to leave it open-ended or shall we ask <br />the staff to schedule for the next Kona meeting? <br />MOOERS:I would prefer to schedule it, because I dont think its going to <br />take me very long to get a cost estimate of -. First of all, what I would have to do is find <br />outiftheydbewillingtoallowustoconnectsinceitsaprivatesystem,andthensecond <br />is to talk with contractors to get a per lineal foot cost for this, and then ask them on their <br />design what would be required, what their capacity of the system is, if they do have a <br />pump station, if it can comply, and how that connection would have to be made, and so <br />determining the cost. And I can do a mailing to the surrounding property owners. <br />GRAHAM:Well, then, Im fine with the next meeting then if that works into <br />your schedule. And I also would hope if possible the Planning Department can give us a <br />little more specific response to the other concerns that came up today about which ones <br />would be handled in the normal process of moving forward with this project, and not that <br />its SMA dependent, just so that we better understand how the runoff, those kind of <br />issues are -. But thats not how they might be handled automatically, just in the process <br />of moving forward with a three-unit project here, just so that we have that before us. So <br />thats not on you, Mr. Mooers, but just hopefully the Planning Department can give us a <br />little more flesh out. Thank you. <br />SPRINGER:Is there a second? <br />SIRACUSA:Second. <br />SPRINGER:It has been moved by Commissioner Graham and seconded by <br />Commissioner Siracusa that this matter be continued until the next Kona meeting for the <br />Hawaii County Planning Commission. Mr. Darrow, is that possible to put this on the <br />next Kona agenda? <br />DARROW:Yes. <br />SPRINGER:Thank you. Is there any discussion on the motion before us? <br />Seeing none, Jeff, could we have the roll call? <br />DARROW:Thank you, Madam Chair. Commissioner Graham? <br />17 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.