My WebLink
|
Help
|
About
|
Sign Out
Home
2004-10-01 THOLMES
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2004
>
2004-10-01 THOLMES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2011 10:48:40 AM
Creation date
6/14/2011 10:48:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
for children to play, absolutely no yard. And I have no yard, either, which is the main <br />reason why I do mine as a vacation rental, because there are no yards. One, two, two <br />other properties that are among the five of us have a yard, nobody else does. Nobody in <br />that whole five cul-de-sac thing does anything about the driveway except me. I have put <br />an average of $2,000 a year into keeping that driveway so that you can drive on it. Just, <br />lets see the date, 8/20, I spent $874. I have the receipts for that. <br />I do this because it has to be done. Nobody ever offers to help or even gives a thank you. <br />It just, as a 3-bedroom or as 3-unit is notfeasible unless these issues are dealt with. <br />SPRINGER:Thank you. Commissioners, do you have any questions for the <br />testifier? Commissioner -. <br />SIRACUSA:I am concerned about this runoff issue. And I was wondering if <br />staffhadlookedatthatquestionwhentheywerepreparingtheBackgroundReport. <br />SPRINGER:Mr.DarroworMr.Yuen? <br />DARROW:Arewereferringtoduring,well,atthispointconstructionhasbeen <br />completed. We do have our standard condition, Condition No. 5 dealing with runoff. <br />But this is mainly -. <br />SIRACUSA:Excuse me, thats during construction? <br />DARROW:Correct. Yes, its -. <br />SIRACUSA:And its pretty obvious that external construction has ceased, at <br />least according to the application here, and that theyll only be doing work on the interior, <br />which is not expected to affect, you know, things on the outside. But theres obviously, <br />according to the testimony, a problem with surface runoff from the parcel itself, and that <br />can affect properties that are makai. It has, if there are very bad storms, a potential to, <br />actually, do some runoff into the ocean. So Im wondering why theres nothing <br />addressing that as a permanent solution to a run-off problem. <br />SPRINGER:Mr. Darrow? <br />DARROW:Correct me if Im wrong, but were looking at an application on a <br />piece of property thats approximately 5,000 square feet in size. Its relatively small. I <br />believe the pictures that the testifier is referring to is a perpetual easement thats going to <br />be partly responsible from the Applicant but it is also going to be relative to other homes <br />in the area. As far as runoff, this person is going to be responsible for his own runoff <br />regarding, you know, weather. But it also, this situation may also be runoff thats coming <br />mauka of this property thats also contributing to the problems that you see on this <br />roadway. <br />SIRACUSA:Will the testifier care to comment on that response? <br />8 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.