Laserfiche WebLink
E. Resumes of Key Personnel Proposed for this Contract <br /> (Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> Dave Buscheck,PE Senior Geotechnical Construction a.Total b.With Current Firm <br /> Manager/GIS 30 18 <br /> 15. FIRM NAME AND LOCATION(CITY AND STATE) <br /> Haley&Aldrich,Inc., Hawaii Island, HI <br /> 16. EDUCATION(DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> BS,Civil Engineering Professional Engineer—CA <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(PUBLICATIONS,ORGANIZATIONS,TRAINING,AWARDS,ETC.) <br /> Qualifications: Dave is a registered civil engineer and former general engineering contractor with 30+years of expertise in the <br /> design and construction of geotechnical stabilization systems. His recent experience includes serving as the construction manager <br /> for several multi-million-dollar creek stabilization and restoration construction projects for Zone 7 Water Agency and Valley <br /> Water. Dave excels at providing specialized GIS and geotechnical engineering skills paired with extensive knowledge and client <br /> services for innovative,cost-effective solutions. <br /> 19. RELEVANT PROJECTS <br /> (1)Title and Location(City and State) (2)Year Completed <br /> Waipi`o Valley Road Short Term Safety Improvements Professional Services Construction(If Applicable) <br /> Island of Hawai'i, HI 2023 2023 <br /> (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm <br /> a Construction inspector for rockfall and hazards mitigation construction for the Waipi`o Valley Road project for County of <br /> Hawaii. Haley&Aldrich's design included evaluation of conditions,conceptual recommendations for short-term and long- <br /> term mitigation measures,and design of hazard mitigation measures. During the construction phase,we provided daily <br /> construction monitoring, public outreach and facilitation,and consultation regarding sensitive species during construction. <br /> (1)Title and Location(City and State) (2)Year Completed <br /> Alamo Creek Pilot Study Professional Services Construction(If Applicable) <br /> Dublin,CA Ongoing N/A <br /> (3 'ief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm <br /> Providing GIS and geotechnical engineering support services to the lead geomorphologist assessing and designing long-term <br /> solutions for the stabilization of a chronically unstable earth-lined flood control channel for the Zone 7 Water Agency. GIS <br /> b support services consist of utilization of prior photogrammetric mapping of the study area and environs, performing <br /> additional imaging,and assessing conditions and findings from other channel studies performed and/or being performed for <br /> Zone 7 concerning channel performance. Geotechnical support services will consist of site mapping,subsurface exploration, <br /> soil testing,and development of geotechnical design parameters to the design team.The Agency proposes to utilize rock and <br /> revegetation measures in progressive ways as a pilot program with the intent to mitigate recurring erosion and bank failures. <br /> The study will be completed in 2023,with follow up construction in 2024. <br /> (1)Title and Location(uty ana State) (2)Year Complete' <br /> Channel Wide LiDAR Monitoring Professional Services Construction(If Applicable) <br /> Tri Valley,CA Ongoing N/A <br /> (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm <br /> c Providing LiDAR scans of the entire 37 miles of flood control channels for the Zone 7 Water Agency.These services are being <br /> provided in wake of above-normal rainfall over the 2022-2023 winter when the Agency experienced over one hundred <br /> channel bank failures.The data will be used to supplement other ongoing studies for Zone 7 involving channel bank condition <br /> assessment,soils testing,failure analyses,and predictive modeling to assist the Agency in developing enhanced flood control <br /> management. <br /> (1)Title ana Location(City and State) (2)Year Completed <br /> Bolsa Road Fish Passage Professional Services Construction(If Applicable) <br /> Gilroy,CA Ongoing N/A <br /> (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm <br /> Senior Construction Manager for Santa Clara Valley Water District on the rehabilitation of approximately 1700 lineal feet of <br /> d Uvas Channel adjacent to the Christopher Ranch facility,to restore fish passage through the area. Construction involves the <br /> installation of ramps in and out of the channel,demolition, removal,and disposal of existing concrete rubble,abandoned <br /> automobiles,and other unsuitable material. The project will be completed with a revegetation plan consisting of willow pole <br /> cuttings,container plants, hydroseeding,and erosion control measures. CE&G is utilizing advanced measurement systems <br /> (UAS and LiDAR)for pre-construction, in-progress,and post-construction (as-built)3D imaging for monitoring work progress <br /> and for claims management. CE&G will also be providing construction vibration monitoring throughout the work. <br /> STANDARD FORM 330(REV.8/2016) <br /> ALDRICH <br />