|
E. Resumes of Key Personnel Proposed for this Contract
<br /> (Complete one Section E for each key person.)
<br /> 14. YEARS EXPERIENCE
<br /> a.Total b.With Current Firm
<br /> John Ford Senior Biologist/Natural Resource Scientist 40 1
<br /> 15. FIRM NAME AND LOCATION(CITY AND STATE)
<br /> Haley&Aldrich,Inc., Honolulu, HI
<br /> 16. EDUCATION(DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> Certificate, Executive Program in Natural Resources Mgmt. N/A
<br /> MS,Zoology(Limnology); BA,Zoology(Marine Biology)
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(PUBLICATIONS,ORGANIZATIONS,TRAINING,AWARDS,ETC.)
<br /> Qualifications:John is a senior associate and natural resources specialist. He is responsible for National Environmental Policy Act(NEPA)
<br /> and Hawai'i Environmental Policy Act(HEPA)planning and environmental compliance,as well as jurisdictional wetlands assessments and
<br /> endangered species consultation. His experience encompasses complex environmental planning,compliance and permitting projects,
<br /> ecological science and field studies in marine,aquatic,and terrestrial habitats,and integration of geospatial information for clients
<br /> throughout and Maui Nui and Hawai'i.John worked since 1975 to study and conserve Maui streams,watersheds,and coastal wetland
<br /> habitats as an ecologist with Federal resource agencies,The Nature Conservancy,and as an environmental consultant.
<br /> 19. RELEVANT PROJECTS
<br /> (1)Title and Location(City and State) (2)Year
<br /> Geotechnical and Environmental Consulting Services for Preliminary Professional Services Construction(If Applicable)
<br /> Evaluation of 62 Bridges, Island of Hawaii, HI Ongoing N/A
<br /> a (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm
<br /> Senior Biologist for supporting CONSOR Engineering and the County of Hawaii with evaluations of 62 bridges identified as
<br /> requiring repairs. Project involves evaluating the proposed remedial work to provide guidance on possible federal and state
<br /> permits,various assessments(environmental,archaeological,flora and fauna,etc.), and community outreach and input.
<br /> (1)Title and Location(City and State) (2)Year Completed
<br /> Hanalei National Wildlife Refuge River Intakes Repair and NEPA Professional Services Construction(If Applicable)
<br /> Permitting,Kaua'i,HI Ongoing N/A
<br /> b (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm
<br /> John is assisting with the preparation of NEPA and environmental planning compliance studies and documents related to
<br /> evaluation of alternative surface water intake structure locations and designs within the Hanalei National Wildlife Refuge.The
<br /> work is necessitated by the destruction of irrigation water distribution systems on the refuge by a severe storm in 2018.
<br /> Napili WWPS No.4 Renovations Professional Services Construction(If Applicable)
<br /> Maui, HI Ongoing
<br /> lnri.,f r
<br /> Check If Project Performed With Current Firm
<br /> John is assisting with the Endangered Species Act Section 7 consultation for this project involving the renovation of pump stations
<br /> and installation of wastewater pipeline.
<br /> (1)Title and Location(City and State) (2)Year Completed
<br /> Geotechnical& Permitting Support,Restoration of Stream Crossings, Professional Services Construction(If Applicable)
<br /> Lihu'e-Koloa Forest Reserve, Kaua'i, HI Ongoing
<br /> (3)Brief Description(Brief Scope,Siz, 'ost,Etc.)and Specific Role ['Check If Project Performed With Current Firm
<br /> d Natural Resources Specialist for restoration of storm-damaged stream crossings on the Lihu'e-Koloa Forest Reserve Roadway,
<br /> owned by Department of Land and Natural Resources. H&A conducted the initial damage assessment and preliminary engineering
<br /> report, including hydraulic and structural analysis,to justify FEMA funding. In the design phase,we are conducting resource
<br /> assessments,environmental planning and permitting,and agency consultations.
<br /> (1)Title and Location(City and State) (2)Year Completed
<br /> Natural and Cultural Resource management Strategies and Professional Services Construction(If Applicable)
<br /> Programmatic Agreements,USCG Air Station,O'ahu, HI 2021 N/A
<br /> (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ❑Check If Project Performed With Current Firm
<br /> e Project Manager(directed biologists,subcontract archaeologists,and architectural historians)to conduct detailed natural and cultural
<br /> resource inventories of the USCG Air Station Barbers Point,prepare a Biological Assessment and a NHPA Section 106 assessment of
<br /> historic buildings,and prepare resource management strategies and programmatic agreements with regulatory agencies. Work
<br /> included wetland delineation,endangered species identification,and Section 7 and 106 consultations.
<br /> /�
<br /> STANDARD FORM 330(REV.8/2016)
<br /> ICH-I
<br />
|