|
E. Resumes of Key Personnel Proposed for this Contract
<br /> (Complete one Section E for each key person.)
<br /> 20. NAND. 21. ROLE IN THIS mNTRACT 22. YEARS EXPERIENCE
<br /> Civil/Environmental Engineer, Project a.Total b.With Current Firm
<br /> Mikki Slentz,PE Manager 12 4
<br /> 23. FIRM NAME AND LOCATION(CITY AND STATE)
<br /> Haley&Aldrich,Inc., Makawao, HI
<br /> 24. EDUCATION(DEGREE AND SPECIALIZATION) 25. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> BS,Civil Engineering Professional Engineer-CA, HI
<br /> Certified Professional in Erosion &Sediment Control (CPESC)
<br /> 26. OTHER PROFESSIONAL QUALIFICATIONS(PUBLICATIONS,ORGANIZATIONS,T
<br /> Qualifications: Mikki has 12 years of environmental and civil engineering experience. Her organizational skills allow her to provide
<br /> excellent project management and coordination. Her experience includes compliance with and management of MS4 and
<br /> stormwater programs as well as managing multi-million-dollar Capital Improvement Program projects and federal aid projects
<br /> involving stormwater, roadway,drainage system,and flood control. Mikki previously worked for County of Maui as an engineer in
<br /> the Department of Public Works Engineering Section,where she managed several roadway-and drainage-related projects,giving
<br /> her valuable experience in County procedures and processes.
<br /> 27. RELEVANT PROJECTS
<br /> (1)Title and Location(City and State) (2)Year Completed
<br /> MS4 NPDES Permit Program Management Professional Services Construction(If Applicable)
<br /> Maui, HI Ongoing N/A
<br /> (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm
<br /> a Project Manager for the County's Storm Water Management Program. Managed Storm Water Management Program
<br /> implementation,including public outreach and engagement,construction,and post-construction best management practices
<br /> (BMP),illicit discharge detection and elimination program,GIS survey of the County's MS4,County facility inspections and
<br /> personnel training,and consultation regarding program organization and funding.
<br /> (1)Title and Location(City and State) (2)Year Completed
<br /> 'Tao Flood Control Systemwide Improvement Framework Professional Services Construction(If Applicable)
<br /> Maui, HI Ongoing N/A
<br /> (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm
<br /> b Project Engineer managing the development of a SWIF document under the Army Corps of Engineers'program to correct
<br /> deficiencies related to encroachments and levees that are part of the Flood Control Project(FCP),maintained by the County of
<br /> Maui. Project includes research of FCP plans and drawings,records of past inspection logs,correspondence with landowners and
<br /> County personnel,and land documents,and preparation of the SWIF document.The SWIF document describes the County's
<br /> proposed FCP improvements and includes a plan of action and schedule and is under review by the Army Corps.
<br /> (1)Title and Location(City and State) (2)Year Completed
<br /> Environmental Engineering and Compliance Support,Statewide Airports Professional Services Construction(If Applicable)
<br /> Multiple Islands, HI Ongoing N/A
<br /> (31 Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm
<br /> Project Engineer supporting this comprehensive program providing DOT with"as-needed"environmental engineering and
<br /> c compliance support at 15 State airports. Reviews construction design plans and inspects construction sites for compliance with
<br /> storm water regulations.Trained DOT personnel on Spill Prevention Control and Countermeasure(SPCC) Plans, Industrial Storm
<br /> Water Pollution Prevention Plans(SWPPPs),and general pollution prevention. Prepared and updated SPCC Plans for DOT
<br /> facilities. Instrumental in preparing the MS4 Stormwater Management Plan and MS4 permit renewal for two State airports.
<br /> Reviewed construction plans for compliance with best management practice(BMP)requirements. Provided management and
<br /> technical support for construction BMP inspection team tasked with inspecting construction projects at State airports.
<br /> (1)Title and Location(City and State)
<br /> West Maui Recycled Water Expansion Phase 2 NPDES Permitting Professional Services Construction(If Applicable)
<br /> d
<br /> Maui, HI 2023 2023
<br /> (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm
<br /> Project Manager for the preparation of the contractor's dewatering permit for deep excavations associated with the project.
<br /> Consultation included water sampling and preparing the project's NPDES permit application.
<br /> Auhana Road Drainage Improvements Professional Services Construction(If Applicable)
<br /> Kihei, HI 2019 N/A
<br /> e
<br /> ['Check If Project Performed With Current Firm
<br /> Project Manager for the design of drainage improvements at Auhana Road to address existing flooding conditions,including the
<br /> installation of new catch basins,drain lines,and outlet structures.
<br /> STANDARD FORM 330(REV.8/2016)
<br /> HREBI;ICH
<br />
|