Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT Z t <br />(Complete one Section E for each key person.) cillaE.$Ajt <br />12. NAME <br />Catherine Hanna, EIT <br />15. FIRM NAME AND LOCATION (City and State) <br />Oceanit Laboratories. Inc.. Honolulu. Hawai'i <br />13. ROLE IN THIS CONTRACT <br />Civil Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />9 3 <br />"Ib. tuUL;A I IUN (uegree ana specianzaiion) 'I /. UUNNtN I NKUt-tssIUNAL NtUls I NA I IUN (state ana uiscipune) <br />MS Civil and Environmental Engineering / 2012 Engineer in Training, New York, No. 088183 <br />BS Civil Enaineerina / 2011 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Certifications: OSHA 10-Hour Training #36-005323436 (2015), OSHA Asbestos Awareness Training #1360 (2021), AHA <br />Heartsaver First Aid CPR & AED (2021) <br />Awards: Charles Lee Crandall Award Winner (2010 & 2011), Margaret Arronet Corbin Award Winner (2011), Intel <br />Foundation Research Grant Recipient (2011) <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Water Infiltration into Basement of International Arrivals Building <br />Honolulu, O'ahu, Hawai'i <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />a. <br />Project Engineer. Prepared book specifications for and provided detailing of improvements intended to stop water infiltration <br />into the north and south portions of the Daniel K. Inouye International Airport basement. Researched specialty products and <br />collaborated with manufacturers, distributors and local contractors to determine product suitability. Coordinated details with <br />structural engineering consultant, SLSH. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />I <br />CONSTRUCTION (If applicable) <br />State Irrigation System Reservoir Safety Improvements <br />Waimea, Big Island, Hawai'i <br />Ongoing <br />b. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Project Engineer. Civil design and detailing of 40 linear feet of subgrade outlet pipe extension, new concrete intake box at the <br />base, and new valve and valve stem system along the slope of Pu'ukapu Reservoir. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Kahana Bay Erosion Mitigation <br />Lahaina, Maui, Hawai'i <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE MCheck if project performed with current firm <br />C. <br />Project Engineer. Prepared conceptual plans and details using Civil 3D for the four (4) alternatives considered in the project's <br />Environmental Impact Statement (EIS), intended to develop a sustainable and resilient approach to mitigate regional erosion <br />along 3,700 linear feet of Kahana shoreline. Developed quantity take -offs for each alternative for cost estimating purposes. <br />Contributed to preparation of written content for EIS publication. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Mantokuji Mission Shoreline Adaption <br />P5'ia, Maui, Hawai'i <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Project Engineer. Prepared specifications and RFP package for an emergency temporary protection structure, consisting of <br />d' <br />imported, beach -compatible sand wrapped in geotextile fabric, along 112 linear feet of shoreline fronting the historic temple <br />structure. Coordinated permitting efforts with regulatory agencies, and provided construction administration, including reviewing <br />submittals and responding to RFIs. Prepared preliminary plans and design for the restoration of the sandy beach in Mantokuji <br />Bay, as a permanent solution to the erosion and consequent threat to the temple, to help facilitate discussions with the <br />community and regulatory agencies. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Ko'a Kea Resort Shoreline Protection <br />K61oa, Kaua'i, Hawai'i <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Project Engineer. Performed site reconnaissance, involving a site visit and local shoreline recession data collection. Prepared <br />e. <br />an engineering assessment of the beach and shoreline erosion at the property, assessed adaption options considering cost, <br />constructability, and permitting implications, and developed conceptual plans and details for 165 linear feet of restored beach <br />fronting the resort to reduce risks to public safety and natural resources from shoreline recession. Also developed conceptual <br />plan for comprehensive small-scale beach restoration spanning seven (7) properties along 1,600 linear feet of Kiahuna Beach <br />to incite collaborative discussions between owners. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Dale Residence Emergency Temporary Shoreline Protection <br />Ka a'a, Kaua'i, Hawai'i <br />Ongoing <br />f' <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Project Engineer. Drafted construction drawings and prepared specifications and other contract documents for 77 linear feet of <br />temporary erosion control structure makai of the existing oceanfront erosion escarpment. <br />STANDARD FORM 330 ( REV. 7/2021) <br />