Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT Z t <br />(Complete one Section E for each key person.) ClIllaE.$Ajt <br />12. NAME <br />Om Das, P.E., PMP <br />15. FIRM NAME AND LOCATION (City and State) <br />Oceanit Laboratories. Inc. Honolulu. Hawai'i <br />13. ROLE IN THIS CONTRACT <br />Construction Project Manager <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />12 1 2 <br />"Ib. tuUL;A I IUN (uegree ana specianzaiion) 'I /. UUNNtN I NKUt-tssIUNAL NtUls I NA I IUN (state ana uiscipune) <br />B.Tech, Chemical Engineering / 2008 Hawaii, Civil Engineering <br />M.S., Civil Engineering /2011 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Project Management Professional (PMP), OSHA 30-Hour Construction Industry Outreach, OSHA 10-Hour Construction Industry <br />Outreach. LEED Green Associate <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Water Systems Upgrade at the Waikiki Aquarium for the University of <br />Hawaii, Manoa <br />Current <br />a. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm <br />Civil Engineer responsible for project management and project design, planning & permitting. Scope of project includes design <br />of injection well system for the discharge of water effluent from the aquarium's exhibits. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />HNL NDWP IIT Mauka Extension, Daniel K. Inouye Intl Airport <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Honolulu, Hawaii <br />2021 <br />2021 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm <br />Construction Project Manager responsible for the coordination of project work with the project stakeholders, coordination of <br />b. <br />design changes with the Owner, Designer & Contractor, inspecting Contractor's work in accordance with the Project <br />Documents and negotiating change orders with the Contractor. Scope of the project included the demolition of the old <br />Commuter Terminal and the construction of the new Inter -Island Terminal Mauka Extension at HNL. Approximate Construction <br />Cost was $270 Mil. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />HNL HDWP Widen Taxilanes G&L Phase I, Daniel K. Inouye Intl <br />Airport <br />2018 <br />2018 <br />Honolulu, Hawaii <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm <br />C. <br />Construction Project Manager responsible for the coordination of project work with the project stakeholders, coordination of <br />design changes with the Owner, Designer & Contractor, inspecting Contractor's work in accordance with the Project <br />Documents and negotiating change orders with the Contractor. Scope of the project included the widening & full pavement <br />reconstruction of Taxilanes G & L to accommodate ADG-V type aircrafts. Approximate Construction Cost was $60 Mil. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Waiahole Water System Improvements for the State of Hawaii, <br />Department of Agriculture <br />2021 <br />Honolulu, Hawaii <br />d. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm <br />Civil Engineer responsible for project design and permitting. Scope of project included the replacement of four irrigation siphons <br />along the Waiahole Water System Improvements that convey irrigation water from one part of the Island of Oahu to another for <br />agricultural use. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Lima Ola Work Force Housing Development for Kauai County <br />Housing Agency <br />2013 <br />Kauai, Hawaii <br />e. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm <br />Civil Engineer responsible for the development of an environmental assessment report, preliminary engineering report and a <br />water model for the project. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Force Main Condition Assessment for the Department of Design & <br />Construction, City & County of Honolulu <br />2014 <br />Honolulu, Hawaii <br />f. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm <br />Civil Engineer responsible for developing a work plan for the condition assessment of three wastewater force mains at <br />Kaneohe, Kailua and Halawa and documenting the findings of the condition assessment in an engineering report. <br />STANDARD FORM 330 ( REV. 7/2021) <br />