Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br />QUALIFICATIONS FOR THIS CONTRACT NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. 10 <br />Complete one Section F for each proiect.) <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Mauna Lahilahi Beach Park Erosion Control PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Wai`anae, Hawaii 2019 2021 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />City and County of Honolulu, Department Curtis Kushimaejo (808) 768-8455 <br />of Design and Construction <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Scope: Oceanit prepared plans, specifications, cost estimates, an Environmental <br />Assessment, and permits for a shoreline erosion control design to protect the park <br />lands and preserve the sand beach makai of the Makaha Surfside Apartments on the <br />leeward side of O'ahu. Located just landward of the eroding shoreline, the apartment <br />complex was damaged by hurricanes and by seasonal high waves several times in the <br />past. The project consisted of a temporary sandbag revetment to protect inland areas, <br />a breakwater to reduce wave energy, and beach restoration. The breakwater is a <br />rubble structure extending about 250 feet parallel to the eroding shoreline. The beach <br />was built with 10,000 cubic yards of sand from an inland quarry. <br />In Phase II, Oceanit designed, prepared specifications and environmental permits, and oversaw construction to replace the temporary <br />sand bag revetment with a 330-ft permanent rock revetment along the inner shoreline of the pocket beach. The revetment consisted of <br />two layers of underlayer stones, totaling 500cy, and two layers of basalt armor stones totaling 2,035 cy. Construction of the revetment <br />was completed in 2021. <br />Other tasks included hydrographic surveys, wave and current analysis to optimize the design, post -design services during bidding and <br />construction, construction management services, benthic marine biological surveys, and post construction services. <br />Cost: $1 M <br />C <br />y - <br />�- wIs• — _. --- - � `,+raw <br />J t <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. Oceanit Laboratories, Inc. Honolulu, HI Prime —Coastal Engineer and <br />Planner <br />STANDARD FORM 330 (REV. 7/2021) <br />