Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT -C <br />(Complete one Section E for each key person.) CwManjt <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Stephen B. Wilson Project Manager / Mechanical a. TOTAL b. WITH CURRENT FIRM <br />Enqineer 50 1 4 <br />15. FIRM NAME AND LOCATION (City and State) <br />Oceanit Laboratories, Inc, Honolulu, Hawai'i <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />B.S. / 1973 / Mechanical Engineering <br />MBA / 1980 / MBA <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Navy SCUBA Qualified-, Drydock Master, Software Engineering Institute/Carnegie Mellon Capability Maturity Model, Hammer & <br />Champy's Business Process Reengineering (BPR), Total Quality Management (TQM), International Organization for Standardization <br />ISO 9001 auditor, Legislative Auditor for State of Hawaii (management & performance audits). <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />General Manager and Construction Engineer, <br />Kailua-Kona and Honolulu, Hawai'i <br />2004-2006 <br />2004-2006 <br />a. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm <br />Construction & Operations Management - Construction of modular homes using light gauge steel frames and trusses that were <br />manufactured from coils of light gauge steel in a plant environment. Manufactured entire home in two pieces that were trucked <br />to job site and assembled and closed up. Homes were secured to foundations and utilities connected. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />General Manager/Aloha Aina Homes, LLC <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Kailua-Kona and Honolulu Hawaii <br />2004-2005 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm <br />b. <br />Helped to establish new business to manufacture modular homes using light gauge steel frames and trusses in a new plant <br />environment. Left company to start up similar operation in Honolulu. Worked with consultants to plan, develop and implement <br />operating plan. Served as onsite engineer. Defined and implemented Manufacturing Process Management Systems. <br />Documented and implemented standard operating procedures (Safety Manual/Program, Steel Stud Quality Control Manual & <br />Plant Quality Control Manual) and quality standards. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Kahana Nui Basin Dam, Department of Public Works <br />Kahana, Hawaii <br />2020-present <br />C. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Project Manager — Oversaw Hydrological and Hydraulic analysis, Spillway Adequacy Analysis, updated design for outflow <br />intake and dam controls, prepared design report, prepared and submitted application for approval of Plans and Specifications <br />to the Hawaii Dam Safety Program. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Ala Wai Watershed Flood Mitigation Project, <br />Honolulu, Hawaii <br />2020 <br />d. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Project Manager — Oversaw hydrologic and hydraulic computer modeling of watershed, developed conceptual designs for flood <br />mitigation solutions, conducted engineering review of USACE flood mitigation plans, performed community engagement and <br />outreach meetings, coordinated activities with stakeholders, agencies, and community. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />North Kawaihae Small Boat Harbor Improvements <br />Kawaihae, Hawaii <br />2022 (est.) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm <br />Project Manager - Provided damage assessment reports, construction plans, specifications and cost estimates for the main <br />breakwater, rock revetment, parking lot, boat washdown and drainage improvements, utility upgrades, a drainage evaluation, <br />e' <br />wave modelling and report, an Environmental Assessment, and all required permits. The main breakwater that is supposed to <br />protect the harbor, has undergone major repairs in the past due to wave damage. The most recent wave damage occurred in <br />January 2020, rendering the marginal wooden wharf and much of the harbor utilities unusable. The proposed improvements <br />will strengthen the compromised breakwater, construct a sand berm along the shoreline to prevent sand from accumulating on <br />the boat ramp and replace or repair damaged infrastructure. Estimated Construction Cost: Main Breakwater - $4.62 M, <br />Infrastructure Improvements: $1.16 M <br />STANDARD FORM 330 ( REV. 7/2021) PAGE 1 <br />