My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005618 06.29.23 PLANNING SOLUTIONS INC CAT PL.3, PL.4, PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.03 - Community Planning Assistant, Project Management Support, Community Organizing, Public Participation, Meeting Facilitation
>
PL-INT-2023-005618 06.29.23 PLANNING SOLUTIONS INC CAT PL.3, PL.4, PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2023 1:52:14 PM
Creation date
6/30/2023 5:05:37 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/29/2023
Permit Number
PL-INT-2023-005618
Description
PLANNING SOLUTIONS INC, PROFESSIONAL SERVICES FOR CAT PL.3, PL.4, PL.5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KANAPU`U DRIVE <br /> CULVERT Project Summary: <br /> EMERGENCY Repair of a 500-foot long, 12-foot diameter culvert <br /> roughly 50 feet beneath Kanapuu Drive that failed <br /> REPAIR causing road closure, damage to at least one residence, <br /> and the imminent risk of much greater impacts. The <br /> project,which was managed by the Department of Design <br /> Planning Solutions, Inc. and Construction (DDC),was complicated by the length <br /> and depth of the culvert,proximity of residences, <br /> Client: Park Engineering subsurface conditions, and downstream wetland. <br /> PSI Role: Subconsultant <br /> `"" i ry <br /> may_ <br /> Documents Prepared: z <br /> b}`-Y 4.s o t <br /> • Scoping letters , <br /> 4115.111 <br /> • Permit applications — <br /> Approvals Obtained: <br /> • CWA Section 404 DA ► :, . , <br /> Nationwide Permit#3 -' – <br /> • CWA Section 401 WQC tt#= ` �. <br /> • NPDES Construction NGPC ,Basin(ettling and dewatering)at outlet of culvert. <br /> • NPDES Dewatering NGPC <br /> • Noise Variance Detail: <br /> PSI coordinated closely with State and Federal permitting <br /> Commence: 2018 agencies to quickly obtain the permits required to <br /> commence repairs on this emergency project. This <br /> Complete: 2021 included a field meeting with agency personnel and <br /> frequent phone calls and emails. As a result, initial <br /> Team Members: permits were awarded in a matter of days and <br /> • AECOS modifications needed to adapt to field conditions were <br /> conveyed and approved quickly as well. <br /> Budget: S320,000 PSI's team: <br /> • Delineated wetlands; <br /> • Assisted with the development of site specific <br /> BMPs, including a water transfer,to avoid and <br /> minimize potential impacts to water resources; <br /> • Prepared the Applicable Monitoring and <br /> Assessment Plan (AMAP); and <br /> • Implemented AMAP and oversaw permit <br /> compliance. <br /> 711 Kapi`olani Boulevard,Suite 950 r n <br /> Honolulu, Hawaii 96813-5213 <br /> 10 <br /> Phone:808-550-4483•www.psi-hi.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.