My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005618 06.29.23 PLANNING SOLUTIONS INC CAT PL.3, PL.4, PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.03 - Community Planning Assistant, Project Management Support, Community Organizing, Public Participation, Meeting Facilitation
>
PL-INT-2023-005618 06.29.23 PLANNING SOLUTIONS INC CAT PL.3, PL.4, PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2023 1:52:14 PM
Creation date
6/30/2023 5:05:37 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/29/2023
Permit Number
PL-INT-2023-005618
Description
PLANNING SOLUTIONS INC, PROFESSIONAL SERVICES FOR CAT PL.3, PL.4, PL.5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DUKE <br /> KAHANAMOKU Project Summary: <br /> LAGOON PSI and engineer team member developed a plan to <br /> greatly increase lagoon water turnover using saline <br /> groundwater instead of ocean water, reduce the lagoon's <br /> RESTORATION <br /> volume, seal the accumulated sediment beneath a liner, <br /> reroute storm water runoff away from the lagoon, and <br /> Planning Solutions, Inc. replenish the sand that had eroded from the beach. The <br /> restoration has been widely hailed as exceptionally <br /> Client: Hilton successful, turning what had become an unused backwater <br /> into a center of recreational activity. <br /> PSI Role: Prime <br /> Documents Prepared: <br /> 3 <br /> • Draft EA (HEPA) f " <br /> • Final EA (HEPA) ^rvr <br /> • Permit applications <br /> Vgyark <br /> Approvals Obtained: <br /> • FONSI <br /> • CDUP v :, <br /> r <br /> • Section 404 Individual Permit "—� .o�•w <br /> • Section 401 WQC \\ . <br /> gmm <br /> • CZM <br /> Lagoon restoration layout plan(red dashed line illustrates previous extent of lagoon). <br /> • SMP Major <br /> • NPDES Construction NGPC Detail: <br /> • NPDES Operations <br /> Once Hilton agreed to the restoration concept, PSI's team <br /> • Special District obtained all the necessary approvals and permits in 2 <br /> • Planned Development Resort years within the budget. Construction was complete two <br /> • Well permits years later in 2007. <br /> As with all complex projects, PSI maintained a detailed <br /> Commence: 2003 schedule to ensure tasks were conducted in parallel to the <br /> maximum extent possible, which shortened the overall <br /> Complete: 2005 permitting schedule. <br /> Hilton was pleased with PSI's performance and has <br /> Budget: S600 000 <br /> retained PSI to conduct permit-required annual water <br /> quality monitoring since the lagoon reopened. <br /> n <br /> 711 Kapi`olani Boulevard,Suite 950 r n <br /> Honolulu, Hawaii 96813-5213 <br /> Phone:808-550-4483•www.psi-hi.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.