|
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br /> a. TOTAL I b. WITH THIS FIRM
<br /> David A.Smith,Ph.D.,P.E. Coastal Engineer 24 15
<br /> 15. FIRM NAME and LOCATION(City and State
<br /> Sea Engineering,Inc.
<br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION State and Discipline)
<br /> Ph.D.,University of Hawaii-Manoa,Ocean Engineering Hawaii Professional Engineer
<br /> M.S.,University of Hawaii-Manoa,Ocean Engineering Guam Professional Engineer
<br /> B.S.,University of Hawaii-Manoa,Mathematics California Professional Engineer
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS Publications,Organizations, Training,Awards,etc.
<br /> Member—ASCE PADI Open Water Diver Certification,Nitrox Certification
<br /> 19. RELEVANT PROJECTS
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Laupahoehoc Harbor Repair Design Professional Services Construction
<br /> Lau ahoehoe,Hawaii 2020 to present
<br /> 3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if promect performed with current firm
<br /> In 2019,USACE retained the services of Nagamine Okawa Engineers,Inc. and Sea Engineering,Inc. (SEI)to evaluate the
<br /> a. condition of the existing breakwater,develop and compare alternative repair plans,and develop conceptual repair plans and
<br /> rough order of magnitude construction costs under the U.S.Army Corps of Engineers(USACE)Operations&Maintenance
<br /> (O&M)program.In 2020,USACE retained the services of Cardno GS,Inc.,and SEI to develop the repair plan through final
<br /> design.
<br /> Cost:$141,640 Role:Project Manager/Coastal Engineer
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Hilo Harbor Breakwater Repair
<br /> 2020 to present n/a
<br /> Hilo,Hawaii
<br /> b 3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if project performed with current firm
<br /> Sea Engineering,Inc.(SEI)has been contracted by Cardno GS and the U.S. Corps of Engineers(USCOE)to investigate the
<br /> existing breakwater condition,and to develop alternative plans to repair the breakwater.
<br /> Cost: $93,888 Role:Project Manager
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Ala Moana Park Sand Replenishment and EIS Professional Services Construction
<br /> Ala Moana Beach Park,Oahu 2017 to present I n/a
<br /> 3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if project performed with current firm
<br /> Sea Engineering, Inc., was contracted by Belt Collins to support the City and County of Honolulu efforts to improve Ala
<br /> C. Moana Beach Park. Work tasks include sand source investigations, determination of sand recovery and transport
<br /> methodology, investigation of existing beach conditions and characteristics, analysis of coastal engineering design
<br /> parameters,design of the beach nourishment plan,water quality assessments,EIS input and preparation of necessary Federal,
<br /> State and City and County permit applications.
<br /> Cost: $78,200 Role:Coastal Engineer
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Waikoloa Beach Management Plan Professional Services Construction
<br /> Waikoloa,Hawaii 2017 to preesnt n/a
<br /> 3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if project performed with current firm
<br /> During a tsunami in March 2011 the beach at Anahoomalu Bay was severely eroded.A 200-foot-wide breach was created
<br /> through the beach and into the fishpond. Much of the fishpond rock wall which acted as a backstop for the beach was
<br /> d. destroyed. Following completion of repairs,the beach has been relatively stable. To ensure the continued stability of their
<br /> beach, and address concerns about sea level rise, the Waikoloa Land Company and Waikoloa Beach Association have
<br /> contracted Sea Engineering to develop a long-term plan for management and maintenance. Work includes Beach change
<br /> monitoring, coastal assessment and preliminary concept plan, offshore sand survey, development of a detailed beach
<br /> maintenance/management plan, environmental assessment and permit application, and detailed design and construction
<br /> documents.
<br /> Cost: $36,760 Role:Coastal Engineer
<br /> 1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
<br /> Federal Coastal Navigation Structure Inspections Professional Services Construction
<br /> Hawaiian Islands,Guam,CNMI,&American Samoa 2015,2016,2017 1 a
<br /> 3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if project performed with current firm
<br /> Sea Engineering was contracted to perform inspections of 24 federal coastal navigation structures(CNS)throughout Hawaii,
<br /> e.. Guam,Rota,and American Samoa operated and maintained by the U.S.Army Corps of Engineers(USACE),Pacific Ocean
<br /> Division(POD), including Hilo,Kaiwaihae, Laupahoehoe,Pohoiki harbors. The purposes of the inspections were to verify
<br /> the current condition of the structures, locate areas of concern on each structure, and identify and recommend future
<br /> maintenance requirements.
<br /> Client:USACE,KAI Hawaii Role:Project Manager,Coastal/Design Engineer
<br />
|