Laserfiche WebLink
AECOM I County of Hawaii,Planning Department,Fiscal Year 2024 <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME �,. 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> A.TOTAL B.VV1TH CURRENT FIRM <br /> Lily Nazareno Technical Review 7 7 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> AECOM Technical Services, Inc.(Honolulu, Hawaii) <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> BA, English, minors in Writing and Multimedia Professional Certificate in N/A <br /> Urban and Regional Planning, Hawaii Pacific University <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.) <br /> Lily Nazareno is a dedicated and diversified technical editor and writer providing quality review and technical support in projects for federal,state, <br /> and city/county clients. Extensive experience with CERCLA process deliverables. Editing and contributing writing for complex NEPA and HRS <br /> Chapter 343 project documents, including internal quality review process facilitation,production,and distribution; NOA publications coordination and <br /> public meeting preparation;and stakeholder outreach. <br /> Organizations-Member of the Society for Technical Communication <br /> II 19.RELEVANT PROJECTS <br /> a. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Department of the Navy, Environmental Assessment for Lease of PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Land for Energy Generation and Storage,Resiliency,Reliability, 2020 N/A <br /> and Security(Joint Base Pearl Harbor-Hickam, HI) <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Technical Support/Author and Technical Editor.The proposed action is to construct battery energy storage systems and a photovoltaic solar <br /> array system at the sites.Conducted research and authored EA discussions of land use and public health and safety impacts relating to the <br /> proposed action. Conducted technical editing review of the EA and produced deliverable files for client submittal. <br /> b. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> HDOT, Highways Division, Environmental Assessment for PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Puunene Avenue Safety Improvements and Road Widening 2019 N/A <br /> (Kahului, HI) <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Technical Support/Author and Technical Editor.Contributed writing and discussions of impacts relating to transportation,health and safety, <br /> alignment with the County of Maui Countywide Policy Plan,and public facilities and services.Created document template and provided document <br /> preparation guidance. Conducted technical editing review of the EA and produced deliverable files for client submittal. <br /> c. (1)TITLE AND LOCATION(City and State) See Project#2 in Section F (2)YEAR COMPLETED <br /> Pearl Harbor Naval Shipyard Dry Dock&Waterfront Production PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Facility EIS (Oahu,HI) 2019-2022 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Technical Editor.The proposed action is to construct and operate a dry dock and waterfront production facility at PHNSY and IMF,which would <br /> increase collaboration and efficiency among the workforce. Maintained document templates and style guide for consistency and quality reviews. <br /> Conducted formatting,acronyms,and references checks as well as technical editing review of the EIS. <br /> d. (1)TITLE AND LOCATION(City and State) 2)YEAR COMPLETED <br /> Pacific Missile Range Facility Integrated Natural Resources PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Management Plan and Environmental Assessment(Kauai, HI) Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Technical Support/Author and Technical Editor. Updated EA and revised the impact assessments based on latest 2022 INRMP,new <br /> information on resources,and other new references and guidance since the 2019 draft EA.Assisted with internal quality review process oversight. <br /> Conducted technical editing review of the EA and produced deliverable files for client submittal. <br /> (1)TITLE AND LOCATION(City and State) See Project#7 in Section F (2)YEAR COMPLETED <br /> Waikiki War Memorial Natatorium EIS PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Honolulu, HI) 2019 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Technical Editor.Assisted with draft and final EA revisions according to stakeholder input in this high profile project. Created document template <br /> and provided preparation guidance.Assisted with internal quality review process oversight. Conducted technical editing review of the EIS and <br /> produced deliverable files, including electronic and hard copies,and completed client submittal and stakeholder distribution. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021)PART I -PAGE E-7 <br />