AECOM I County of Hawaii,Planning Department,Fiscal Year 2024
<br /> F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S 20.EXAMPLE PROJECT KEY NUMBER
<br /> QUALIFICATIONS FOR THIS SERVICE CATEGORY
<br /> (Present no more than 10 projects, with emphasis on previous City projects. 0
<br /> Complete one Section F for each project.)
<br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED
<br /> PROFESSIONAL CONSTRUCTION
<br /> PMRF Sands Sea Level Rise Vulnerability and Adaptation Study in Support of the
<br /> SERVICES (If applicable)
<br /> INRMP (Kauai, HI) 2021 N/A
<br /> IIIIIIIIIIIIIIIIIIIIIK 23.PROJECT OWNER'S INFORMATION
<br /> a PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER
<br /> NAVFAC Pacific Erith M. Evans (808)474-9778
<br /> erith.m.evans.civ@us.navy.mil
<br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS SERVICE CATEGORY(Include scope,size,and cost)
<br /> Flood Exposure: 2035H/2065M "The JV has provided excellent customer service throughout the
<br /> NAPFAC
<br /> duration of the contract reporting period. There have been nunumerous
<br /> Range and Airfield ` changes in project management over the life of the project,but with
<br /> Operations District a s w"
<br /> �" Sandia each change the JV's Program manager(Kevin Buttterbaugh)has
<br /> Y y ,,,,, D°"e" brought in high quality replacement PMs."
<br /> Rte '. ., ..
<br /> —Erith Evans, 12/09/2021
<br /> • W. Minh Plain = ensures available and reliable utilities, including on-site electricity gener-
<br /> ation,for the installation's critical missions and defines energy require-
<br /> ;,, • �'`�°° ments to maintain mission capabilities during outage events.
<br /> ,; Runway 16 34
<br /> , AECOM determined the mission energy requirements,assessed
<br /> " resiliency gaps,and developed engineering scenarios to address the
<br /> PersOnne9 Support ' gaps.Top priority projects included combined solar photovoltaic and
<br /> District - ,,:," ,..-n .,, battery energy storage systems,and power and communication line
<br /> connection/undergrounding projects at various sites on the installation.
<br /> These projects were selected for further technical and financial analysis,
<br /> AECOM developed a suite of engineering and environmental planning including the creation of a cost benefit analysis tool. Pre-NEPA environ-
<br /> studies in support of current and future resiliency requirements at mental studies were carried out for the priority projects,including in ar-
<br /> Pacific Missile Firing Range(PMRF) Barking Sands in Kauai, Hawaii. eas with Federally Protected and Endangered species and high Cultural
<br /> The studies centered around an installation energy resiliency roadmap, Sensitivity.The project also addressed the level of permitting and NEPA
<br /> a comprehensive energy planning effort that addressed current and required to complete the implementation of the priority projects.
<br /> potential future mission needs,planned PMRF infrastructure projects, Sea Level Rise Vulnerability Study
<br /> and efforts necessary to enhance mission assurance through energy AECOM assessed the vulnerability of PMRF to permanent inundation
<br /> resiliency,operational efficiency, leveraging innovative technology, and temporary flooding from sea level rise and storm surges using
<br /> improved partnerships and strengthening infrastructure. selected projections for the years 2035 and 2065 and custom GIS data
<br /> The project also included development of site-specific sea level rise products.The team:
<br /> map products to two time-horizons,a vulnerability and risk assessment, • Identified key vulnerabilities to critical structures and facilities.
<br /> and the development of high-level adaptation strategies to address the • Developed potential concept-level adaptation strategies to be translat-
<br /> vulnerabilities/resilience gaps. ed into projects to address resiliency requirements.
<br /> • Organized and ran two stakeholder meetings with adjacent landown-
<br /> Resiliency Roadmap ers,municipalities and,state agencies to share information about the
<br /> The Resiliency Roadmap is a structured and effective approach to se- project and to learn about other similar efforts with the aim of future
<br /> lecting,prioritizing,sequencing,and implementing energy projects and collaboration.
<br /> programs that will result in stronger long-term installation energy and • Developed a funding matrix for sources applicable to the Navy and
<br /> resiliency posture. .The Roadmap laid out the viability and sustainability local municipalities/other(etc.to fund off base strategies that would
<br /> of various alternative energy and energy resiliency solutions.The plan protect the base from future sea level rise impacts).
<br /> 25.FIRMS INVOLVED WITH THIS PROJECT
<br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
<br /> AECOM Technical Services, Inc. Partner in
<br /> a. Cardno GS-AECOM Pacific Joint Venture Honolulu, HI;Orange,CA;San Diego,CA Prime Consultant
<br /> (GLMMBP7GKM63)
<br /> b Stantec Partner in Cardno GS-AECOM Honolulu, HI;Santa Barbara,CA; Prime Consultant
<br /> Pacific Joint Venture(GLMMBP7GKM63) Charolottesville,VA
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I - PAGE F-6
<br />
|