Laserfiche WebLink
County of Hawaii, Planning Dept. Section E <br />PL.4) Community Planning (Community/Regional Plans, General Plan, Climate Adaptation) Fiscal Year 2023-2024 <br />C. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Capital Projects Division Program Management, Honolulu, Hawaii <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (if applicable) <br />Ongoing <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑x Check if project performed with current firm <br />Project Manager. BC is providing program management services to assist the Board of Water Supply Capital Projects <br />Division to optimize business performance. This includes increasing the division's annual Capital Improvement <br />Program execution capacity from roughly $40 million to $200 million per year and helping Board of Water Supply <br />leadership implement best practices, optimize business performance, expedite Capital Improvement Program <br />execution, and implement future Capital Improvement Program projects identified from the Board of Water Supply's <br />Water Master Plan. <br />Total Contract Amount: $10.7M Client: Honolulu Board of Water Supply <br />d. <br />(1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />Evaluation of Effluent Injection Wells at the Waimea, Eleele, and <br />PROFESSIONAL SERVICES <br />CONSTRUCTION(ifapplicable) <br />Lihue Wastewater Treatment Plants, Kauai, Hawaii <br />Ongoing <br />N/A <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ❑x Check if project performed with current firm <br />Project Oversight. The BC team is evaluating 13 underground injection wells located at three different wastewater <br />treatment plant sites for disposal of effluent wastewater. These injection wells are permitted by State of Hawaii, <br />Department of Health Safe Drinking Water Branch under the Underground Injection Control Program and are annually <br />evaluated and physically assessed to meet permit requirements. <br />Total Contract Amount: $550K Client: County of Kauai, Dept. of Public Works <br />e. <br />(1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />Sewer Condition Assessment Program, Oahu, Hawaii <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (if applicable) <br />2014 <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑x Check if project performed with current firm <br />Project Oversight. BC was retained to perform condition assessment fieldwork for the large diameter gravity sewer <br />pipeline and manhole system in Honolulu. Assessments were performed on approximately 200 miles of gravity <br />sewer pipeline (15-to 108-inches in diameter) and approximately 4,000 manholes, per NASSCO standards. Pipeline <br />inspection methods included traditional closed-circuit television, non-traditional long-range closed-circuit television, <br />2-D and 3-D laser profiling, sonar inspection, and continuous hydrogen sulfide measurement. The final work product <br />provides prioritization of the large diameter gravity collection system for ongoing inspections, identifies and defines <br />new Capital Improvement Program projects, and was used to assist in reprioritizing the City's existing Capital <br />Improvement Program project list. <br />Total Contract Amount: $4.2M Client: City and County of Honolulu, Dept. of Environmental Services <br />BrownANoCaldwell STANDARD FORM 330 (REV. 6/2006) : 2 <br />