My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005628 06.30.23 BROWN AND CALDWELL CAT PL.4, PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.04 - Community, Regional Plans, General Plan, Climate Adaption
>
PL-INT-2023-005628 06.30.23 BROWN AND CALDWELL CAT PL.4, PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2023 3:24:44 PM
Creation date
7/5/2023 12:31:52 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/30/2023
Permit Number
PL-INT-2023-005628
Description
BROWN AND CALDWELL, PROFESSIONAL SERVICES FOR CAT PL.4, PL.5
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Hawaii, Planning Dept. Section E <br />PL.4) Community Planning (Community/Regional Plans, General Plan, Climate Adaptation) Fiscal Year 2023-2024 <br />C. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Vulnerability and Resiliency Assessment, Lihue, Hawaii <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (if applicable) <br />2021 <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑x Check if project performed with current firm <br />Deputy Project Manager/Project Engineer (Civil). BC conducted a vulnerability and resiliency study of County <br />of Kauai, Department of Water's (KDOW) drinking water systems. The vulnerability and resiliency assessment <br />included an island -wide evaluation of KDOW's current readiness for natural hazard events and malevolent acts <br />in accordance with AWIA 2018 requirements. BC's assessments focused on preparedness for a disaster event, <br />particularly hurricane -related system outages and potential impacts to KDOW's drinking water systems. BC identified <br />recommendations that supported the KDOW's goal of providing safe, affordable, and adequate drinking water for <br />all consumers. BC then developed improvement projects for KDOW to implement to help mitigate and harden its <br />critical assets and infrastructure against a given threat. BC also updated KDOW's Emergency Response Plan, which <br />incorporated operational strategies and procedures to better prepare, plan and respond to a threat event. <br />Total Contract Amount: $705K Client: County of Kauai, Dept. of Water <br />d. <br />(1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />Central Oahu Watershed Management Plan, Honolulu, Hawaii <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (if applicable) <br />Ongoing <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑x Check if project performed with current firm <br />Project Engineer (Civil). BC is developing the Central Oahu Watershed Management Plan (WMP) for the Honolulu <br />Board of Water Supply. The overall goal of the Central Oahu WMP is to formulate an environmentally holistic, <br />community -based, and economically viable WMP that provides a balance between preservation/management of <br />Oahu's watersheds and the sustainable development and use of groundwater and surface water supplies. The plan <br />has five objectives: (1) promote sustainable watersheds; (2) protect and enhance water quality and quantity; (3) <br />protect Native Hawaiian rights and traditional practices; (4) facilitate public participation, education, and project <br />implementation; and (5) meet future water demands at reasonable costs. The plan is prepared in coordination with <br />the City and County of Honolulu (CCH), Dept. of Planning and Permitting and in accordance with the State Water Code <br />Chapter 174C, HRS, and CCH Ordinance Chapter 30, ROH. The Central Oahu WMP is one of eight district WMP's that <br />comprise the Oahu WMP. <br />Total Contract Amount: $575K Client: Honolulu Board of Water Supply <br />e. <br />(1)TITLEAND LOCATION (CityandState) <br />(2) YEAR COMPLETED <br />Risk and Resiliency Assessment and Emergency Response Update, <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ifapplicable) <br />Hilo, Hawaii <br />2022 <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑x Check if project performed with current firm <br />Project Manager. BC performed a risk and resiliency assessmentthat included an evaluation of County of Hawaii, <br />Department of Water Supply (HDWS) seven largest systems that metthe threshold for America's Water Infrastructure <br />Act 2018 compliance requirements. BC developed a custom vulnerability assessmenttool that evaluated HDWS's <br />critical assets againstthe selected natural hazards and malevolent acts. The tool produced a prioritized risk score <br />for each asset based on the identified threat and the results will be used to support HDWS's future improvement <br />planning. BC also updated HDWS's Emergency Response Plan which included updates to the Action Plans to prepare <br />for, respond to, and recover from an emergency event. <br />Total Contract Amount: $535K Client: County of Hawaii, Dept. of Water Supply <br />BrownANoCaldwell I STANDARD FORM 330 (REV. 6/2006) : 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.