My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005629 06.30.23 CAROLLO ENGINEERS INC CAT PL.4
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.04 - Community, Regional Plans, General Plan, Climate Adaption
>
PL-INT-2023-005629 06.30.23 CAROLLO ENGINEERS INC CAT PL.4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2023 3:10:36 PM
Creation date
7/5/2023 11:35:40 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/30/2023
Permit Number
PL-INT-2023-005629
Description
CAROLLO ENGINEERS INC, PROFESSIONAL SERVICES FOR CAT PL.4
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRM OVERVIEW AND BACKGROUND <br /> I i, _ <br />�1 .. ill" f Pearl City Pump Station <br /> �, �`.v ' Upgrades Construction Management <br /> 4eI+ . <br /> 4,--i' fp.r <br /> pCITY AND COUNTY OF HONOLULU,DEPARTMENT OF ENVIRONMENTAL SERVICES, <br /> PEARL CITY,HAWAII <br /> ..- `-- Client Reference: <br /> Mr.Dan Brieck,Assistant Chief,Division of Environmental Quality, <br /> f,~---- Department of Environmental Services <br /> 808.670.4371 / dbrieck@honolulu.gov <br /> The 36-mgd Pearl City Wastewater Pump Station is located within the (' + \ <br /> 100-year floodplain and has experienced flooding issues in the past. a a ' <br /> This resiliency project includes site civil work to improve drainage r !I <br /> and raise the electrical equipment above the 100-year floodplain.A * 1 ' <br /> new mezzanine level will be added to the electrical building,and all li fo' <br /> four existing influent pumps will be replaced.The pump station must ° <br /> z <br /> remain in operation during construction,which is anticipated to be i RR - _< <br /> completed in 2023. ,o> ^I I ° <br /> ix 'I _ <br /> - D <br /> Summary of Construction r. __ _ D <br /> Management Services 1 _ D <br /> Carollo's construction management supported the City and County z <br /> HN c) <br /> of Honolulu from the pre-bid phase of the project and continues to 4 i o <br /> support through construction completion,and contract close out. '' <br /> r —1 <br /> P m <br /> Carollo performed a constructability review of the bid documents z <br /> and summarized key issues that needed to be clarified for bidding. <br /> Construction phase services include conducting weekly construction '°0 ° <br /> coordination meetings,contract administration,actively monitoring . w <br /> 0 <br /> the contractor's progress relative to schedule,monitoring the D <br /> contractor's safety program,assist with requests for information and <br /> review of submittals,review and negotiate project change orders, <br /> review and process contractors monthly pay application,provide w <br /> independent cost and quantity verification for contractors pay N <br /> IIS w <br /> application and change orders,provide monthly cash flow reports A <br /> and forecasts,and provide daily on-site inspections and quality -0 <br /> monitoring,special inspection and material testing services. Overcoming Project Challenges A <br /> o <br /> Carollo played a key role in developing and implementing the 0 <br /> contractor's sequencing and outage plans,collaborating with z <br /> the contractor,owner,and engineer.One of the biggest project <br /> challenges was keeping the existing pump station fully operational D <br /> while the new motor control center,electrical drives,and controls z <br /> were replaced.A complete temporary power system was constructed c <br /> in parallel with the existing system that allowed the new equipment to <br /> be replaced and tested one at a time.In addition to dual HECO power m <br /> feeds,two gas-driven generators were used on independent transfer o <br /> switches to provide redundant power to this critical infrastructure. D <br /> D <br /> O <br /> z <br /> CAROLLO / QUALIFICATIONS / JUNE 2023 73 <br /> 8:`,Pursuits,Client83(HOIM`,Hawaii County`,EnvMgmtDept,On-Call FY23-24`,Oua10623`,PL.4 CmntyPl ng_Cmnty Indd 01Firm Overs ew_PL4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.