Laserfiche WebLink
PLANNING DEPARTMENT, COUNTY OF HAWAI`I <br />HHF PLANNERS <br />places for people <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />John Hagihara Principal 11 10 <br />AICP <br />15. FIRM NAMEAND LOCATION (CityandState) <br />Helber Hastert & Fee, Planners, Inc. DBA HHF Planners, Honolulu, Hawaii <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(StateandDiscipline) <br />MA/Urban and Regional Planning <br />BA/Economics <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Olahu Bike Plan Update <br />Islandwide <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />2019 <br />n/a <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE <br />X Check if project performed with current firm <br />a. <br />Project manager for the update of the current update of the bike master plan. HHF worked closely with the City Department of <br />Transportation Services Complete Streets team in developing level of stress typologies and ensuring the complete streets projects <br />are closely integrated with the regional bikeway network. HHF led a series of regional community meetings, with all information <br />also available on a project website and via Facebook Live. Project Cost: $250K <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Honolulu Bikeshare Planning <br />Honolulu, Hawaii <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />2017 <br />n/a <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE <br />X Check if project performed with current firm <br />b. <br />Project manager of a collaborative effort with locally formed non-profit Bikeshare Hawaii (Biki) and Toole Design Group to plan a <br />150 station bike share system in urban Honolulu. The project included extensive community engagement to solicit input on the <br />proposed station locations, detailed site analysis to move the stations through the permitting process, and close coordination with <br />multiple City and County of Honolulu departments (DTS, DPP, and DFM). Project Cost: $45K <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Hele Kakou Kahului <br />Kahului, Maui <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />Ongoing <br />n/a <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE <br />X Check if project performed with current firm <br />Project managerforthe effort to identify roadway safety improvements that encourage active modes of transportation in Kahului. <br />This pilot project includes development of a wayfinding signage manual to guide the implementation ofwayfinding improvements <br />around the County. Proposed roadway safety improvements will focus on key routes identified and will complement Complete <br />Streets implementation projects recently completed or underway. The project has included extensive secondary research, <br />consultation with a range of stakeholders, and the use of online workshops, surveys, and interactive maps. Project Cost: $200K <br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (712021) <br />