My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005633 06.30.23 HHF PLANNERS CAT PL.4, PL.5, PL.6
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.04 - Community, Regional Plans, General Plan, Climate Adaption
>
PL-INT-2023-005633 06.30.23 HHF PLANNERS CAT PL.4, PL.5, PL.6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2023 3:14:32 PM
Creation date
7/5/2023 1:03:38 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/30/2023
Permit Number
PL-INT-2023-005633
Description
HHF PLANNERS, PROFESSIONAL SERVICES FOR CAT PL.4, PL.5, PL.6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HHF PLANNERS <br />PLANNING DEPARTMENT, COUNTY OF HAWAVI � places forpeople <br />21. TITLE AND LOCATION (City ond State) <br />Pu`uhonua o Honaunau National Historical Park PROFESSIONAL SERVICES <br />Remove & Replace Park Maintenance Facilities EA Ongoing <br />Honaunau-Ndpd`opo`o, Hawaii Island <br />23. PROJECT OWNER'S INFORMATION <br />22. YEAR COMPLETED <br />CONSTRUCTION (Ifopplicoble) <br />n/a <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Hennebery Eddy Architects Will Ives, AIA (503) 227-4860 <br />for National Park Service <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS SERVICE CATEGORY (Include scope, size, and cost) <br />HHF prepared a Federal National Environmental Policy Act (NEPA) <br />Environmental Assessment (EA) for a project to relocate existing <br />Pu`uhonua o Honaunau National Historical Park maintenance and <br />resource management functions from their current location in <br />substandard facilities in an area known to contain archeological <br />resources to new facilities at a more suitable location. The seven <br />existing structures were constructed as temporary facilities in the <br />1960s and are no longer physically adequate to meet current Park <br />needs. Their location does not support the Park's fundamental <br />resources and values as expressed in its cultural landscape. <br />HHF evaluated impacts on key environmental issue areas in three <br />NPS-owned project sites (two within the main Park boundaries <br />and one site three miles mauka); prepared materials in support of <br />the project's Endangered Species Act Section 7 consultation; <br />prepared NEPA scoping meeting graphic materials; and oversaw <br />biological surveys of all three sites. <br />Project Cost: $137,906 <br />25. FIRMS INVOLVED WITH THIS PROJECT <br />W <br />(1) FIRM NAME 2) FIRM LOCATION (Cityond Stote) (3) ROLE <br />a• AECOS, Inc. Honolulu, Hawaii Biological Resources Survey <br />
The URL can be used to link to this page
Your browser does not support the video tag.