Laserfiche WebLink
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br /> 26. NAMES OF KEY 27. ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F <br /> PERSONNEL CONTRACT (Fill in`Example Projects Key"section below before completing table. Place W under project key number for <br /> (From Section E,Block (From Section E,Block participation in same or similar role. <br /> 12) 13) 1 2 3 4 5 6 7 8 9 10 11 12 <br /> David Smith, P. E. Coastal Engineer X X X X X <br /> Chris Goody, P.E. Ocean Engineer X X X X <br /> Chris Conger Coastal Scientist X X X X X X <br /> Marc Ericksen Project Manger X X X X <br /> Scott Sullivan Project Manager X X X X <br /> Morgan Stephenson Ocean Engineer X X X X X <br /> 29. EXAMPLE PROJECTS KEY <br /> NO. TITLE OF EXAMPLE PROJECT(FROM SECTION F) <br /> 1 Hilo Harbor Breakwater Improvements—Basis of Design <br /> 2 Laupahoehoe Harbor Breakwater Repair Basis of Design <br /> 3 Hawaii DOT Scour Critical Bridge Project <br /> 4 Pohoiki Boat Ramp Repair Relocation <br /> 5 Waikoloa Beach Management Plan <br /> 6 Mauna Kea Shoreline Restoration Project <br /> 7 Project Conditions Survey Inspections of Federal Coastal Navigation Structures <br /> 8 Anaehoomalu Bay Tsunami Damage Repair <br /> 9 Keauhou Bay Offshore Mooring Design <br /> 10 Hilo WWTP Outfall Inspection <br /> 11 Post-Storm Hydrographic Survey Hilo Harbor <br /> 12 Laupahoehoe Boat Ramp Repair <br />