E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT Z t
<br />(Complete one Section E for each key person.) ClIllaE.$Ajt
<br />12. NAME
<br />Om Das, P.E., PMP
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Oceanit Laboratories. Inc. Honolulu. Hawai'i
<br />13. ROLE IN THIS CONTRACT
<br />Construction Project Manager
<br />14. YEARS EXPERIENCE
<br />a. TOTAL b. WITH CURRENT FIRM
<br />12 1 2
<br />"Ib. tuUL;A I IUN (uegree ana specianzaiion) 'I /. UUNNtN I NKUt-tssIUNAL NtUls I NA I IUN (state ana uiscipune)
<br />B.Tech, Chemical Engineering / 2008 Hawaii, Civil Engineering
<br />M.S., Civil Engineering /2011
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Project Management Professional (PMP), OSHA 30-Hour Construction Industry Outreach, OSHA 10-Hour Construction Industry
<br />Outreach. LEED Green Associate
<br />19. RELEVANT PROJECTS
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Water Systems Upgrade at the Waikiki Aquarium for the University of
<br />Hawaii, Manoa
<br />Current
<br />a.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br />Civil Engineer responsible for project management and project design, planning & permitting. Scope of project includes design
<br />of injection well system for the discharge of water effluent from the aquarium's exhibits.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />HNL NDWP IIT Mauka Extension, Daniel K. Inouye Intl Airport
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Honolulu, Hawaii
<br />2021
<br />2021
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br />Construction Project Manager responsible for the coordination of project work with the project stakeholders, coordination of
<br />b.
<br />design changes with the Owner, Designer & Contractor, inspecting Contractor's work in accordance with the Project
<br />Documents and negotiating change orders with the Contractor. Scope of the project included the demolition of the old
<br />Commuter Terminal and the construction of the new Inter -Island Terminal Mauka Extension at HNL. Approximate Construction
<br />Cost was $270 Mil.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />HNL HDWP Widen Taxilanes G&L Phase I, Daniel K. Inouye Intl
<br />Airport
<br />2018
<br />2018
<br />Honolulu, Hawaii
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br />C.
<br />Construction Project Manager responsible for the coordination of project work with the project stakeholders, coordination of
<br />design changes with the Owner, Designer & Contractor, inspecting Contractor's work in accordance with the Project
<br />Documents and negotiating change orders with the Contractor. Scope of the project included the widening & full pavement
<br />reconstruction of Taxilanes G & L to accommodate ADG-V type aircrafts. Approximate Construction Cost was $60 Mil.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Waiahole Water System Improvements for the State of Hawaii,
<br />Department of Agriculture
<br />2021
<br />Honolulu, Hawaii
<br />d.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br />Civil Engineer responsible for project design and permitting. Scope of project included the replacement of four irrigation siphons
<br />along the Waiahole Water System Improvements that convey irrigation water from one part of the Island of Oahu to another for
<br />agricultural use.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Lima Ola Work Force Housing Development for Kauai County
<br />Housing Agency
<br />2013
<br />Kauai, Hawaii
<br />e.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br />Civil Engineer responsible for the development of an environmental assessment report, preliminary engineering report and a
<br />water model for the project.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Force Main Condition Assessment for the Department of Design &
<br />Construction, City & County of Honolulu
<br />2014
<br />Honolulu, Hawaii
<br />f.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br />Civil Engineer responsible for developing a work plan for the condition assessment of three wastewater force mains at
<br />Kaneohe, Kailua and Halawa and documenting the findings of the condition assessment in an engineering report.