Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br />QUALIFICATIONS FOR THIS CONTRACT NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. 5 <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />North Kawaihae Small Boat Harbor Improvements PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Kawaihae, Hawaii 2021 2022 (est.) <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />Department of Land and Natural Mr. Finn McCall, P.E. (808) 587-3250 / finn.d.mccall@hawaii.gov <br />Resources Division of Boating and Ocean <br />Recreation <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Oceanit is currently under contract with the Department of Land <br />and Natural Resources Division of Boating and Ocean Recreation <br />(DLNR - DOBOR) to provide designs for repairs to the small boat <br />harbor. The main breakwater that is supposed to protect the <br />harbor has undergone major repairs in the past due to wave <br />damage. The most recent wave damage occurred in January <br />2020, rendering the marginal wooden wharf and much of the <br />harbor utilities unusable. The proposed improvements will <br />strengthen the compromised breakwater, construct a sand berm <br />along the shoreline to prevent sand from accumulating on the boat <br />ramp and replace or repair damaged infrastructure. These actions <br />will remove safety hazards, improve conditions, and increase the <br />usability of the harbor for harbor users. <br />Oceanit provided project management, topographic and <br />bathymetric surveys, damage assessment reports for the main <br />breakwater, marginal wharf, rock revetment, parking lot, boat <br />washdown and drainage improvements, utility upgrades, a <br />drainage evaluation, wave modelling and report, an Environmental <br />Assessment, and all required permits. <br />Estimated Construction Cost: Main Breakwater - $4.62 million, <br />Infrastructure Improvements: $1.16 million <br />W, <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. Oceanit I Honolulu, Hawaii I Prime consultant <br />STANDARD FORM 330 (REV. 7/2021) <br />