E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT -C
<br />(Complete one Section E for each key person.) CwManjt
<br />12. NAME
<br />Linyan Li Goo, PhD, PE
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Oceanit Laboratories, Inc, Honolulu, Hawai'i
<br />13. ROLE IN THIS CONTRACT
<br />Hydraulic Engineer/Coastal Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL b. WITH CURRENT FIRM
<br />4 4
<br />-1b. tuUL;A I IUN (uegree ana specianzaiion) "I /. UUNNtN I NKUt-tssIUNAL NtUls I NA I IUN (state ana uiscipune)
<br />BS Environmental Engineering 2008 State of Hawaii Professional Engineer License No. 20193
<br />MS in Environmental Science and Engineering (2011)
<br />PhD in Ocean and Resources Enaineerina (2018)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Yamazaki Y., Bai Y., Goo L.L., Cheung, K.F., Lay, T. (2023). Nonhydrostatic Modeling of Tsunamis from Earthquake Rupture to
<br />Coastal Impact. Journal of Hydraulic Engineering. [accepted in March 2023]
<br />*Li, L., Cheung, K.F. (2018). Numerical dispersion in non -hydrostatic modeling of long -wave propagation. Ocean Modeling. doi:
<br />10.1016/j.ocemod.2019.05.002.
<br />*Li, L., Cheung, K.F., Yue, H., Lay, T., and Bai, Y. (2016). Effects of dispersion in tsunami Green's functions and implication forjoint
<br />inversion with seismic and geodetic data: a case study of the 2010 Mentawai Mw 7.8 earthquake. Geophysical Research Letters,
<br />43(21), 11182-11191.
<br />*Li, L., Lay, T., Cheung, K.F., and Ye, L. (2016). Joint modeling of teleseismic and tsunami wave observations to constrain the 16
<br />September 2015 Illapel, Chile Mw 8.3 earthquake rupture process. Geophysical Research Letters, 43(9), 4303-4312.
<br />* Work published under maiden name Li
<br />19. RELEVANT PROJECTS
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />Kahana Nui Basin Dam Improvements, Maui, Hawaii
<br />PROFESSIONAL SERVICES
<br />I CONSTRUCTION (If applicable)
<br />ongoing
<br />a
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Project Engineer. Performed Hydrologic and Hydraulic modeling for the Kahana Nui watershed and reservoir using USACE's
<br />HEC-HMS and HEC-RAS (2D) model systems; Evaluated downstream flooding effects under various dam improvement
<br />alternatives; Prepared Hydrologic and Hydraulic Analysis Report and Downstream Flooding Effects Report.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2021
<br />I CONSTRUCTION (If applicable)
<br />Ala Wai Watershed Flood Mitigation, Honolulu, Hawaii
<br />b
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Project Engineer. Performed hydrologic and hydraulic modeling using HEC-HMS and HEC-RAS for various frequencies of flood
<br />events to assess hazards for the Ala Wai Watershed; Evaluated conceptual designs involving a set of tunnels, combined with
<br />ideas suggested by the community. Modeling results provided critical information for the design phase.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2021
<br />I CONSTRUCTION (If applicable)
<br />Kalakaua Floating Bridge Flow Condition Analysis, Honolulu, Hawaii
<br />C.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Project Engineer. Conducted hydraulic analysis to evaluate flood impacts of constructing a bridge, crossing Kalakaua bridge,
<br />along the Ala Wai Canal. Prepared a report to document the findings and potential impacts on general flood condition in the
<br />adjacent areas due to the proposed project.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />I CONSTRUCTION (If applicable)
<br />Kahana Bay Erosion Mitigation, Kahana, Maui, Hawaii
<br />d.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Coastal Engineer. Performed wave climate data analysis to define typical swell events for coastal erosion. Developed DEM
<br />(digital elevation model) by incorporating multiple data resources including Lidar, Multibeam, and Nautical charts etc.
<br />Performed wave modeling using SWAN (Simulating Waves Near Shore) to evaluate wave impacts and worked on beach
<br />stabilization structure design.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2021
<br />CONSTRUCTION (If applicable)
<br />Mangrove Eradication at Keehi Lagoon for DOT Airports, Honolulu,
<br />Hawaii
<br />e.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm
<br />Project Engineer/Construction Inspector. Conducted periodic BMP and environmental compliance inspections. Prepared written
<br />reports and photo log to document work progress. Helped on logistics/coordination/meeting minutes of regular project progress
<br />meetings.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />I CONSTRUCTION (If applicable)
<br />Pahonu Beach Restoration, Waimanalo, Hawaii
<br />on oin
<br />f
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br />Project Engineer. Performed offshore wave buoy data analysis. Collected exisiting oceanographic data for coastal hazard
<br />assessment. Compiled topography/bathymetry data for development of digital elevation model (DEM) around the project site;
<br />Created high -resolution elevation maps using ArcGIS; Performed wave modeling.
<br />STANDARD FORM 330 ( REV. 7/2021)
<br />
|