Laserfiche WebLink
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY <br /> (Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project) <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED <br /> Farrington Highway Intersection Improvements at Nanakuli Avenue and PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Haleakala Avenue, Island of Oahu, Hawaii 2014 On-going <br /> 23. PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER <br /> Hawaii Department of Transportation, Mr. Henry Kennedy (808) 692-7550 <br /> Highways Division <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> HDOT initiated the planning and design of the project in an effort to improve safety and operations along the Farrington Highway corridor in <br /> Nanakuli in the vicinity of the Nanakuli Avenue and Haleakala Avenue intersections. The project involves widening Farrington Highway by <br /> one lane between Nanakuli Stream and Helelua Street in order to provide dedicated left turn lanes at the intersections. In addition, <br /> drainage and highway lighting systems are being developed/upgraded and a multi-modal pedestrian facility added along the coastal side of <br /> the highway right-of-way. <br /> Due to the level of development close to the highway right-of-way on either side of the corridor and the existence of a historic railway <br /> alignment along one side of the corridor many resources were considered in the development of a least impact alternative design for the <br /> project. Significant coordination efforts were made with all stakeholders involved including DHHL, DOE, City and County of Honolulu Parks <br /> and Recreation, Nanakuli Village Center, Ka Waihona Charter School, Hawaiian Railway Society and the Historic Hawaii Foundation. <br /> Through these collaborative efforts at the aid of WSP, a least impact alternative was developed involving the realignment of a portion of the <br /> historic railway in order to provide much needed space to construct the proposed improvements. <br /> Project Elements: <br /> • Prepare Environmental Assessment <br /> • Permit coordination including: NPDES, SMA <br /> • Final design elements include: <br /> o Roadway widening <br /> o Drainage system design <br /> o Traffic Signal modifications <br /> o Culvert extension <br /> o Shared use path design <br /> o Railroad track realignment <br /> o Highway lighting improvements <br /> o Utility adjustments <br /> • Design Support During Construction <br /> Contract Value: $2.6 Million <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. WSP USA Inc. Honolulu, Hawaii Prime Consultant <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> b. MK Engineers, Ltd. Honolulu, Hawaii Subcontractor <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> c. Geolabs, Inc. Honolulu, Hawaii Subcontractor <br /> (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE <br /> d. Cultural Surveys Hawaii, Inc. Honolulu, Hawaii Subcontractor <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> e. ControlPoint Surveying, Inc. Honolulu, Hawaii Subcontractor <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 11 <br />