HomeMy WebLinkAboutPL-INT-2023-005609 06.28.23 WSP USA INC CAT PL.5 DeVera, Ashley
From: Janicki, Luke <Luke.Janicki@wsp.com>
Sent: Wednesday, June 28, 2023 12:08 PM
To: Planning Internet Mail
Cc: Waterbeck, Carol J; Yoshioka, Jovalene
Subject: SF33O - PL.5 Community Planning
Attachments: PL.5PIanningAnnualQualificationsFY2O24.pdf
Categories: Yellow Category
Hello Zendo,
Attached is the WSP team's submission to the Planning Department for PL.5 Community Planning (Environmental
Planning, Environmental Assessments, Environmental Impact Statements). Please let me know if you have any questions
about our submission.
All the best,
Luke Janicki
t'i, 'll s}> Luke Janicki
Marketing Coodinator III, Pacific Northwest
T+ 1 206-382-6344
M+ 1 206-718-7605
Email: Luke.Janickiwsp.com
WSP USA Inc.
1001 Fourth Ave., Suite 3100
Seattle, WA 98154
wsp.com
NOTICE:This communication and any attachments("this message")may contain information which is privileged,confidential,proprietary or otherwise subject to
restricted disclosure under applicable law.This message is for the sole use of the intended recipient(s).Any unauthorized use,disclosure,viewing,copying,
alteration,dissemination or distribution of,or reliance on,this message is strictly prohibited. If you have received this message in error,or you are not an
authorized or intended recipient,please notify the sender immediately by replying to this message,delete this message and all copies from your e-mail system and
destroy any printed copies.
1
June 30,2023
Mr.Zendo Kern,Planning Director
Planning Department
County of Hawaii
101 Pauahi Street,Suite 3
Hilo,Hawaii 96720
email:planning@hawaiicounty.gov
Subject: Professional Services for the Fiscal Year 2023 -2024
Dear Mr.Kern:
WSP USA Inc.is pleased to submit this letter of interest and SF330 to provide professional services to
the Planning Department for:
PL.5) Community Planning(Environmental Planning,Environmental Assessments,
Environmental Impact Statements)
We have been actively involved in a number of projects on the Big Island,such as NELHA Airport Access
Roads,Emergency Repair of Hakalau Bridge,EQ 2006 Earthquake Repair Projects,Nani Kailua Road
Extension Environmental Assessment(EA),Waimea Circulation Study,Puna Community Development
Plan,Replacement of Scotty White Bridge,Emergency Replacement of Kaalaala Bridge,Kuakini
Highway Improvements,and various traffic impact studies.This involvement has helped us become
familiar with the local issues and needs of the Island of Hawaii.
As a"full-service"engineering firm,we are also capable of providing assistance in any other discipline
should it become necessary for the successful completion of a project.Our general practice is to
enhance the team with qualified local consultants by subcontracting various specialty services.First
preference for subcontractors are those located on the Island of Hawaii.
We look forward to the opportunity to provide planning and engineering services to the Department.If
you have any questions or need additional information,please feel free to contact me at(808) 531-7094
or randall.urasaki@wsp.com.
' d ;1",-cl/se,fizt
andall M.Urasaki
Senior Vice President/Director-Local Business Leader
WSP USA
Suite 2400
1001 Bishop Street
Honolulu.HI 96813
Tel +1 808 531-7094
Fax:+1 808 528 2368
wsp.com
PROFESSIONAL SERVICES QUALIFICATIONS
PART I -SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION
2.PUBLIC NOTICE DATE 3.PROJECT CATEGORY:
June 1, 2023 PL.5) Community Planning (Environmental Planning,
Environmental Assessments, Environmental Impact Statements)
B.POINT OF CONTACT
4.NAME AND TITLE
Randall Urasaki, Senior Vice President, Director—Local Business Leader
5.NAME OF FIRM
WSP USA Inc.
6.TELEPHONE NUMBER 7.FAX NUMBER 8.E-MAIL ADDRESS
(808) 531-7094 (808) 528-2368 Randall.urasaki@wsp.com
In addition to the Form 330,we would like to provide the following information :
1. The name of the firm or person, contact information including email address, the principal place of business, and location of all its
offices:
WSP USA Inc.
The only office in Hawaii for WSP USA Inc.,
1001 Bishop Street, Suite 2400
Honolulu, Hawaii 96813
Contact Person: Randall Urasaki
randall.urasaki@wsp.com
2. The age of the firm and its average number of employees over the past five years:
Founded in 1933,WSP USA Inc. has over 90 years of engineering experience. Our Honolulu office was opened in April 1966 and
had an annual average number of 36 employees over the last five years.
3. The education, training, and qualifications of the individual, or if a firm, its key employees in accordance with HRS 103D-304 and/or
the professional and scientific occupation series contained in the United States Office of Personnel Management's Qualifications
Standards Handbook:
Please refer to the resumes in the Form 330, Section E and in the appendix.
4. A list of recent projects and the names of up to five clients who may be contacted, including at least two for whom services were
rendered during the preceding year:
Mr.Alexander Leonard Natural Energy Laboratory of Hawaii Authority 808-292-5157
NELHA Airport Connector Road Project, Kailua-Kona, Hawaii
Mr. Blaine Kawamura Dept.of Transportation Highways 808-587-2630
Earthquake Disaster Response and Project Delivery Program, Island of Hawaii, Hawaii
Mr. Stanley Katsura City&County of Honolulu DDC 808-768-8831
Program and Project Management for Rehabilitation of Streets, Oahu, Hawaii
DDC—Environmental Permitting Assistance
Mr. Henry Kennedy Dept. of Transportation Highways 808-692-7550
Farrington Highway Intersection Improvements at Nanakuli Avenue and Haleakala Avenue
Ms. Misako Mimura Dept.of Transportation Highways 808-692-7589
Hawaii Department of Transportation General Environmental Services IDIQ
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 1
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY
(Complete one Section E for each key person)
12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
Randall M. Urasaki, PE, LEED AP BD+C Principal in Charge (PIC)or Technical a.TOTAL b.WTH CURRENT
Resource/Quality Assurance FIRM
36 36
15.FIRM NAME AND LOCATION(City and State)
WSP USA Inc., Honolulu, Hawaii
16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
M.B.A. Hawaii, Professional Engineer;
B.S., Civil Engineering Hawaii, LEED AP BD+C
18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.)
American Society of Civil Engineers
19. RELEVANT PROJECTS
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Pali Highway Emergency Repairs and Landslide Mitigation Project, Oahu, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
Hawaii 2019 2020
(3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
a. Project manager for the planning, permitting and design of emergency repairs and permanent repairs to remediate damage caused by
landslides above the Old Nuuanu Pali Road and Pali Highway. Permanent repairs include design of an 80-foot long rock shed above
the Honolulu-bound lanes to provide additional protection and resiliency to the Highway. The project is funded with State and Federal
funding. The firm's scope of work includes obtaining the National Environmental Policy Act(NEPA)Categorical Exclusion, Section 7
ESA coordination, and Section 106 NHPA coordination with a Section 106 MOA. Design work includes slope stabilization, drainage,
and communication and electrical ducts. Contract Fee: $1.3 million.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Kauai Emergency Flood Repairs and Cleanup at Various Locations April 2018, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
Northern and Eastern Kauai, Island of Kauai, Hawaii 2018 On-going
b. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
Project manager for environmental permitting and civil design for the emergency repairs to restore the closed portions of Kuhio
Highway from Hanalei to Kee. Project scope included plans,specifications, and cost estimate (PS&E), and coordination of NEPA,
Section 106, Section 7 environmental clearances, and 404 Permits for over 26 individual repair sites. Contract Fee: $1.1 million.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
County of Hawaii's Hakalau Stream Bridge (Bridge No. 29-3)Emergency PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Repairs, Hilo, Island of Hawaii, Hawaii 2017 2018
c. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
Project manager for environmental permitting and civil design associated with scour repair at the County of Hawaii's Hakalau Stream
Bridge. WSP coordinated and prepared documentation for environmental clearances in NHPA Section 106, ESA Section 7,
Magnuson-Stevens Fisheries Act, Fish and Wildlife Coordination Act, Section 4(f), CWA Section 404, CWA Section 401,CZM, and
NEPA Categorical Exclusions. Contract Fee: $247 thousand.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Natural Energy Laboratory of Hawaii Authority (NELHA)Airport Connector PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
Road Project, Kailua-Kona, Hawaii 2019 2019
(3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
d. Project manager for the planning, permitting and design of approximately 3 miles (4.8 kilometers)of new roadways within the NELHA
property. The project is funded with State and Federal funding. The firm's scope of work includes obtaining the National
Environmental Policy Act(NEPA)Categorical Exclusion and Coastal Zone Management Certification. Design work includes roadway
alignment, roadway construction, drainage, pavement markings and signing, potable water, salt water, permanent best management
practices (BMPs), and communication and electrical ducts.
Contract Fee: $974 thousand.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Earthquake Disaster Response and Project Delivery Program, Island of PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
Hawaii, Hawaii 2010 2011
e. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
Project manager for this emergency project to provide assistance to the HDOT-Hawaii staff after a powerful earthquake and
aftershocks caused damages to the HDOT's roadway system island-wide. We provided on-site assistance in management and
coordination. We also coordinated and applied for necessary permitting for the various projects.
Contract Value: $770 thousand
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 2
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY
(Complete one Section E for each key person.)
12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
Todd S. Nishioka, PE Environmental Task Leader or a.TOTAL b.WITH CURRENT
Technical Resource/Quality Assurance FIRM
(Environmental) 26 8
15. FIRM NAME AND LOCATION(City and State)
WSP USA Inc., Honolulu, Hawaii
16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
B.S., Civil Engineering Hawaii, Professional Engineer
18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.)
19. RELEVANT PROJECTS
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Environmental Permitting Assistance, Honolulu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
On-going
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
Deputy project manager for the City and County of Honolulu Department of Design and Construction Environmental Permitting Project.
a. His duties include developing the City and County of Honolulu, Department of Design and Construction's (DDC)Specification Policy
and Procedures, developing DDC environmental program including but not limited to environmental templates,training DDC staff on
environmental regulations,training DDC staff on how to identify and navigate environmental requirements for their projects, assisting
DDC staff on developing schedules etc. His other duties will include developing a staff study to determine the new environmental
structure within DDC.
Contract Value: $4 million
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
HDOT's Environmental Permitting and Compliance Section PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
Hawaii 2016
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE n Check if project performed with current firm
Assisted in the development of HDOT's Environmental Permitting and Compliance Section. This effort consisted of developing the
b. Section's functional description, position descriptions and hiring of the employees within this Section. He played a lead role in the
development of the policy and procedures of HDOT's environmental program. He had oversight over the development of Section 106
of the National Historic Preservation Act, Section 7 of the Endangered Species Act, the National Environmental Policy Act, Hawaii
Revised Statutes 343 Environmental Impact Statement guidelines. His Section served to provide environmental guidance and
direction to the Highways Division and the County Federal Aid Program. His section also served as the primary environmental clearing
house for emergency related projects.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
HDOT's Storm Water Management Program Plan PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
2016
c. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE n Check if project performed with current firm
Assisted in the development of the Storm Water Management Program Plan. From 2005 until 2016, he served to develop and manage
the Permanent Best Management Practices (PBMPs) program. He worked with consultants in providing guidance and direction on
which PBMPs were most appropriate for the project and the life cycle analysis for the program.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
HDOT's Modified Water Quality Certification Process PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
2016
(3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE n Check if project performed with current firm
d. Was the lead role in the development of the modified Water Quality Certification Process. He worked with the Federal Highways
Administration, Central Federal Lands to develop An Integrated Storm Water Management Approach and a Summary of Clear Water
Diversion and Isolation Best Management Practices for Use in the State of Hawaii, by the Federal Highway Administration and Hawaii
Department of Transportation, Practitioners Guide. This new process serves as the example for interagency coordination and an
expedited process to Storm Water Management.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 3
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY
(Complete one Section E for each key person)
12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
Darin N. Chinen, PE Civil Task Leader or Technical a.TOTAL b.WITH CURRENT
Resource/Quality Assurance (Civil) FIRM
34 34
15. FIRM NAME AND LOCATION(City and State)
WSP USA Inc., Honolulu, Hawaii
16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
M.B.A. Hawaii, Professional Engineer
B.S., Civil Engineering
18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.)
American Society of Civil Engineers; Consulting Engineers Council of Hawaii
19. RELEVANT PROJECTS
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Program and Project Management for Rehabilitation of Streets, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
Oahu, Hawaii On-going On-going
(3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
a. Project manager responsible for the execution of various program and project management services. Project scope includes planning
and management of the City and County of Honolulu's rehabilitation of streets Capital Improvement Program (CIP). Tasks include
preparation of annual CIP budgets, programming of new projects, tracking of program funds, project management of individual
consultant and construction contracts, and preparation of construction documents for in-house design projects.
Current Contract Fee: $8.0 million.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Traffic Improvements at Various Locations, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
2003 2004
b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
Project manager responsible for providing planning and engineering services for traffic improvements to existing intersections and
highway facilities on Oahu. Project scope included traffic studies, environmental documentation, conceptual engineering designs,
public presentations, and final PS&E for projects ranging from intersection modifications to traffic calming improvements.
Contract Fee: $600 thousand.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Kapiolani Boulevard Reconstruction, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
2011 2015
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
c. Project manager responsible for the design of this roadway reconstruction project. The project includes reconstruction of existing
asphalt concrete pavement, installation of portland cement concrete (PCC) pavement bus lanes, pavement markings design,
reconstruction of existing concrete curbs, concrete catch basin repair, and street light and traffic signal systems. Project scope
includes preparation of final plans,specifications, and cost estimate (PS&E), and coordination of permitting required for project
construction.
Contract Fee: $662 thousand.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Reconstruction of Wilhelmina Rise, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
2018 2018
d. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
Project manager responsible for the design of this PCC pavement reconstruction project. The project includes reconstruction of PCC
pavements, pavement markings design, reconstruction of existing concrete curbs concrete catch basin repair, and tree removals.
Project scope includes preparation of final PS&E, and coordination of permitting required for project construction.
Contract Fee: $197 thousand
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Waipio Point Access Road Improvements, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
2010 2016
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
e.
Project manager responsible for the design of this roadway improvements project. The project includes reconstruction of existing
roadway, new pedestrian and bikeway facility, drainage and grading improvements, signing and striping, street lighting systems, utility
relocations, and permanent best management practices. Project scope includes preparation of final PS&E, drainage report and
calculations, and coordination of permitting required for project construction.
Contract Value: $455 thousand
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 4
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY
(Complete one Section E for each key person)
12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
Allen Kam Project Manager or Environmental Task a.TOTAL b.WITH CURRENT
Leader FIRM
30 < 1
15. FIRM NAME AND LOCATION(City and State)
WSP USA Inc., Honolulu, Hawaii
16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
Juris Doctorate
B.S., Environmental Design
18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.)
Professional Certificate in Real Estate, New York University
19. RELEVANT PROJECTS
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Planning Department Head, Belt Collins Hawaii/B+K Consulting, Honolulu, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Hawaii 2013
(3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE n Check if project performed with current firm
a.
Strategized project approaches to obtain land use approvals and entitlements, prepare community lans, and coordinated public
engagement. Prepared and presented projects to clients, project executive teams, and the public. Prepared and processed
environmental reviews at the National Environmental Policy Act(NEPA)and Hawaii State (Hawaii Revised Statutes [HRS] 343) level,
as well as land use and zoning permits. Prepared master plans and community update plans, including strategizing the public
engagement process. Coordinated and managed a team of subconsultants to fulfill project needs in multiple capacities.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Commercial Property Manager, State of Hawaii Office of Hawaiian Affairs, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Honolulu, Hawaii 2010
b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE n Check if project performed with current firm
Established a new Commercial Property department for the Office of Hawaiian Affairs (OHA). Created a development strategy for
approximately thirty acres of waterfront property in Kakaako Makai. Oversaw and supervised master planning efforts and community
outreach efforts for the Kakaako Makai Master Plan. Managed and supervised internal staff as well as teams of consultants that
included professionals with a variety of focus and levels of involvement.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Associate, Booz Allen Hamilton, Honolulu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE n Check if project performed with current firm
`' Embedded consultant in Marine Forces Pacific, Defense Policy Review Initiative—Environmental Department.Assisted in the overall
strategy and preparation of the Commonwealth of the Northern Mariana Islands (CNMI)Joint Military Training (CJMT) NEPA
Environmental Impact Statement(EIS). Coordinated NEPA EIS contract tasks with Naval Facilities Pacific, supervised staff and
external consultants.Acted as Interim Environmental Team Lead, briefing unit commander, Marine Forces Pacific(MARFORPAC)
Executive Director and Headquarters, and U.S. Marine Corps (HQMC)staff on project updates.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Undersea Cable Permitting Specialist, State of Hawaii Department of PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Department of Business, Economic Development&Tourism, Honolulu, Hawaii
(3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE n Check if project performed with current firm
Oversaw the preparation of the Hawaii Interisland Renewable Energy Program EIS. In conjunction with the state of Hawaii Office of
d' Environmental Quality Control, developed a strategyto complete a legally-defensible programmatic EIS, despite significant ambiguous
components,which satisfied the requirements of both HRS Chapter 343 and NEPA. Established and maintained relationships with
various other Federal and State agencies, and in particular with the U.S. Department of Energy and U.S. Fish &Wildlife Services,
negotiating roles for such agencies in the project to help mitigate the State of Hawaii's risk. Established budget for EIS and planning
efforts.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 5
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY
(Complete one Section E for each key person.)
12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
Nami Ohtomo Project Manager or Planning Task Leader a.TOTAL b.WITH CURRENT
FIRM
30 11
15. FIRM NAME AND LOCATION(City and State)
WSP USA Inc., Honolulu, Hawaii
16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
M.P.P., Public Policy, and M.S., Natural Resources& Environment;
A.B., East Asian Languages &Civilizations
18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.)
Hawaii Association of Environmental Professionals, Board member; Women in Renewable Energy
19. RELEVANT PROJECTS
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Pali Highway Emergency Repair Project and Pali Highway Landslide PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
Mitigation Project, Oahu, Hawaii 2019 2020
a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
Lead environmental planner on fast-track emergency project to repair landslide areas and to build a protective structure above the
highway. Responsible for client coordination on all environmental clearances for this federally funded project, including National
Historic Preservation Act(NHPA)Section 106, U.S. Department of Transportation Act Section 4(f)evaluation, Endangered Species Act
(ESA)Section 7, and other federal coordination. Contract Fee: $500 thousand.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Kauai Emergency Projects, Kauai, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
2012 2014
b. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
Environmental planner on multiple Hawaii Department of Transportation projects with emergency federal assistance at various
locations, to repair roadway connectivity disrupted by heavy rainfall. Responsible for preparing U.S.Army Corps of Engineers permit
applications and review/submittal of Historic American Engineering Record (HAER)documentation of impacts to historic bridges.
Contract Fee: $314 thousand.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
HNL Biometric Facial Recognition Project, Honolulu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
On-going
c. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
Environmental planner for a project to design, deploy, and provide CM support services for a facial recognition system at international
departure gates in the Daniel K. Inouye International Airport,to enhance customer experience and operational efficiency. Prepared
federal Categorical Exclusion (CatEx)documentation pursuant to the National Environmental Policy Act(NEPA).
Contract Fee: 1.8 million.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Kauai Emergency Flood Repairs and Cleanup at Various Locations April 2018, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
Kauai, Hawaii 2018 On-going
d.
(3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
Prepared U.S.Army Corps of Engineers permit applications on emergency federal assistance projects at various locations to repair
roadway connectivity disrupted by heavy rainfall, for Hawaii Department of Transportation.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Kauai Bridge Rehabilitation projects, Kauai, Hawaii PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Ongoing
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
Project manager responsible for obtaining environmental permit clearances for three County of Kauai bridge rehabilitation projects-
e' Hana e e Bridge, Koloa Bridge, and Kipu Bridge. The most complex of these is the federally-funded Hana e e Bridge Rehabilitation,
p ppp Y p p
requiring U.S.Army Corps of Engineers (USACE)and U.S. Coast Guard (USCG)Section 404 and Section 10, State Historic
Preservation Officer(SHPO)on National Historic Preservation Act(NHPA)Section 106; HRS Chapter 6E-8; U.S. Fish and Wildlife
Service (Endangered Species Act[ESA] Section 7); state Department of Land and Natural Resources on biological resources (HRS
Chapter 195d), and preparation of a National Environmental Policy Act(NEPA)Categorical Exclusion (CatEx), and HRS Chapter 343
Exemption clearances.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 6
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY
(Complete one Section E for each key person)
12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE
Pamela K. Uyeda, PE, LEED AP BD+C, CISEC Project Manager or Civil Task Leader a.TOTAL b.WITH CURRENT
FIRM
27 27
15. FIRM NAME AND LOCATION(City and State)
WSP USA Inc., Honolulu, Hawaii
16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
M.S., Civil Engineering Hawaii, Professional Engineer
B.S., Civil Engineering Hawaii, LEED AP BD+C
Certified Inspector Sediment and Erosion Control
18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.)
19. RELEVANT PROJECTS
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Lydgate Park-Kapaa Bike/Pedestrian Path, Phases C &D, Kauai, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
On-going On-going
(3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
a. Project manager responsible for overseeing the preliminary right-of way acquisition, permitting, and development of conceptual design
plans for a new coastal shared use path through resort properties near Kapaa. Project scope also includes preparation of easement
maps, land appraisals for each affected property(11 total), assisting in a deed transfer document, and processing the first SMA/SSV
applications under the County new shoreline ordinance.
Contract Fee: $1.3 million
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Total Maximum Daily Loads (TMDL) Monitoring and Best Management PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
Practices (BMP)Activities Tracking, Oahu, Hawaii On-going
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
Project manager responsible for assisting the City and County of Honolulu, Department of Environmental Services (ENV) in meeting
b regulatory requirements of its Municipal Separate Storm Sewer System (MS4) permit. Duties include reviewing Environmental
Protection Agency/Department of Health (EPA/DOH) permit language revisions, developing end-of-pipe and stream monitoring plans,
developing a work plan for establishing local event mean concentration loads for urban land uses, developing implementation and
monitoring plans for TMDL watersheds, and tracking and calculating load reductions for the City's BMP activities. Supplementary tasks
include assisting ENV with watershed water quality modeling efforts, preparation of a Green Infrastructure Handbook, tracking TMDL
development nationwide, and preparation of the Annual Monitoring Plan and Annual Monitoring Report for submittal to DOH.
Contract Fee: $5.5 million.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Middle Street Pavement Reconstruction, North King Street to Kamehameha PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
Highway, Oahu, Hawaii 2013 On-going
(3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
`'
Project manager responsible for preparing civil designplans and permittingdocuments for an FHWA Highway for LIFEgrant project to
1 9 p p p 9 9 9 Y p 1
demonstrate innovative concrete pavement construction techniques, including precast concrete panels and post-tensioned precast
panels. The accelerated construction techniques allowed for minimal traffic disruption while accommodating the exceptionally heavy
truck and bus traffic along this corridor(Keehi Transfer Station and the Kalihi-Palama Bus Facility are located along this portion of
Middle Street). Contract Value: $237 thousand
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Interstate Route H-1 Rehabilitation, Middle Street to Vicinity of Ward Avenue, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
Oahu, Hawaii 2014 2014
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
Project manager responsible for overseeing the completion of environmental clearances, permitting requirements, and PS&E
d. development for the resurfacing and rehabilitation of 3.5 miles of Interstate Route H-1 throughout the most heavily traveled corridor in
Honolulu. Project design elements included assessing the pavement condition; determining an appropriate repair; restriping the
interstate to add an additional through lane; ancillary safety improvements; installing a geosynthetic reinforced soil wall for slope
stability; and bridge widening. The project also required obtaining numerous design exceptions from FHWA;A+B contracting including
road user cost analysis; incentive/disincentive specifications; and coordination with landowners and lessees for construction parcels.
Contract Fee: $2.0 million.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 7
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY
(Complete one Section E for each key person)
12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
Wayne Y. Yoshioka a.TOTAL b.WITH CURRENT
Traffic/Transportation Task Leader FIRM
43 14
15. FIRM NAME AND LOCATION(City and State)
WSP USA Inc., Honolulu, Hawaii
16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
B.S., Civil Engineering Colorado, Professional Engineer
18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.)
19. RELEVANT PROJECTS
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Honoapi'ilani Highway Improvements, Milepost 10.5 to Milepost 18.0, Maui, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
Hawaii On-going
a. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
Project Manager for NEPA/343 EIS and Preliminary Engineering leading to an RFP for Design-Build solicitation. Project proposes to
realign Honoapi'ilani Highway inland to address sea-level rise.
Contract Value: $1.3 million.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
West Waikiki Study, Honolulu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
2007
(3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
b. Project manager for the project that examined safety and traffic operations at five Waikiki intersections. Microsimulation incorporating
vehicle and pedestrian data was performed for Kalakaua Avenue intersections from Saratoga Road to Royal Hawaiian Avenue. New
pedestrian-only phases were recommended at the Lewers and Royal Hawaiian intersections which reduced vehicle-pedestrian
conflicts while reducing delay and queuing on Kalakaua Avenue.
Contract Fee: $193 thousand.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Nani Kailua Road Extension, Kailua-Kona, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
2007
c. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
Transportation engineer responsible for studying the impact of a new mauka-makai connector roadway between Kuakini Highway and
Alii Drive, two high-volume but distinctive character roadways in Kailua-Kona. Traffic control alternatives such as traffic signals and
roundabouts are being considered.
Contract Value: $1.1 million.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
North South Road EA, Kapolei, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
2007
d. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
Project Manager for NPEA/343 EA and Preliminary Engineering for a new arterial roadway and H-1 interchange. Project dealt with
endangered Abutilon Menziesii plant. Successful clearance of EA and preliminary engineering led to current Kualaka'i Parkway and
interchange.
Contract Value: $2.6 million.
(1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
Saddle Road Extension EIS,Waikoloa, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
e. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE n Check if project performed with current firm
Project manager for transportation element of EIS for a proposed extension of Saddle Road (Daniel K. Inouye Highway) between
Mamalahoa Highway and Queen Ka'ahumanu Highway. Involved both transportation forecasting and intersection operational analyses.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 8
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY
(Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project)
21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED
Environmental Permitting, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
On-going
23. PROJECT OWNER'S INFORMATION
a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER
City and County of Honolulu, Department of Mr. Wilfred Kiyotoki (808)768-8832
Design and Construction
24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
WSP is providing of providing technical engineering services to assist the City in the project management and compliance with various
environmental permits/clearances required for City projects. Project scope involves the following:
• Assisting the City in overseeing, determining, organizing, and compiling all necessary environmental permit compliance documents to
meet Federal, State and City statutes.
• Coordinating, reviewing, and following up on the permit compliance work activities, meetings,submittals, documentations, and
schedule.
• Assisting in the preparation and review of permit applications and related documents and amendments and obtaining approvals.
• Coordinating permit compliance work requirements, amendments, non-compliance/violations with other City, State and Federal agency
requirements and acting as a liaison with such agencies.
• Permits include the following:
1. National Pollutant Discharge Elimination System(NPDES)General Permit,Appendices C and A,Authorizing Discharges of Storm
Water Associated with Construction Activities
2. National Pollutant Discharge Elimination System(NPDES)General Permit,Appendices F and A,Authorizing Discharges of
Hydrotesting Waters
3. National Pollutant Discharge Elimination System, Individual Permits
4. Noise Variances
5. Section 401 Water Quality Certification
6. Department of the Army Permits—Section 10 of the Rivers and Harbors Act; Section 404 of the Clean Water Act; Section 103 of
the Marine Protection, Research, and Sanctuaries Act; and other laws
7. Hawaii Revised Statutes (HRS)343/National Environmental Policy Act (NEPA)
8. HRS 6E/Section 106 of the National Historic Preservation Act(Section 106)
9. HRS 195D, Section 7 of the Endangered Species Act
10. HRS 174C State Water Code
11. HRS 205A Coastal Zone Management
Contract Value: $4 million
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
a. WSP USA Inc. Honolulu, Hawaii Prime Consultant
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 9
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY
(Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project)
21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED
East Kapolei Rail Station Multimodal Access Improvements, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
On-going
23. PROJECT OWNER'S INFORMATION
a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER
City and County of Honolulu Honglong Li (808) 768-5472
24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
WSP is providing planning,environmental, and design services to City and County of Honolulu Department of Transportation Services to
complete Federal Transit Administration (FTA)environmental clearances associated with constructing multimodal access improvements for
the future East Kapolei Rail Station. The purpose for the project is to create multimodal connections including bus to rail, bike to rail, and
walk to rail between adjacent land uses/community and the East Kapolei station.
In developing the improvements, the Department of Transportation Services (DTS)would incorporate the City's Complete Streets Design
Manual guidelines and evaluate various crossing alternatives, including signalization, to maintain safe and efficient traffic operations. DTS
also envisions integrating a context sensitive solutions (CSS)approach to the planning and design by meeting with surrounding land uses
and major stakeholders including the University of Hawaii's West Oahu, Salvation Army's Kroc Center, the Department of Hawaiian
Homelands, DR Horton, Oahu Transportation Services, and others. The preferred design would be coordinated with Hawaii Department of
Transportation (HOOT), owner of Kualakai Parkway. Funding from the FTA would be utilized in the design phase therefore the proposed
project must also comply with federal requirements.
Contract Value: $2.1 million
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
a. WSP USA Inc. Honolulu, Hawaii Consultant
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
b.
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
C.
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
d.
(1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE
e.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 10
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY
(Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project)
21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED
Farrington Highway Intersection Improvements at Nanakuli Avenue and PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
Haleakala Avenue, Island of Oahu, Hawaii 2014 On-going
23. PROJECT OWNER'S INFORMATION
a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER
Hawaii Department of Transportation, Mr. Henry Kennedy (808) 692-7550
Highways Division
24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
HDOT initiated the planning and design of the project in an effort to improve safety and operations along the Farrington Highway corridor in
Nanakuli in the vicinity of the Nanakuli Avenue and Haleakala Avenue intersections. The project involves widening Farrington Highway by
one lane between Nanakuli Stream and Helelua Street in order to provide dedicated left turn lanes at the intersections. In addition,
drainage and highway lighting systems are being developed/upgraded and a multi-modal pedestrian facility added along the coastal side of
the highway right-of-way.
Due to the level of development close to the highway right-of-way on either side of the corridor and the existence of a historic railway
alignment along one side of the corridor many resources were considered in the development of a least impact alternative design for the
project. Significant coordination efforts were made with all stakeholders involved including DHHL, DOE, City and County of Honolulu Parks
and Recreation, Nanakuli Village Center, Ka Waihona Charter School, Hawaiian Railway Society and the Historic Hawaii Foundation.
Through these collaborative efforts at the aid of WSP, a least impact alternative was developed involving the realignment of a portion of the
historic railway in order to provide much needed space to construct the proposed improvements.
Project Elements:
• Prepare Environmental Assessment
• Permit coordination including: NPDES, SMA
• Final design elements include:
o Roadway widening
o Drainage system design
o Traffic Signal modifications
o Culvert extension
o Shared use path design
o Railroad track realignment
o Highway lighting improvements
o Utility adjustments
• Design Support During Construction
Contract Value: $2.6 Million
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
a. WSP USA Inc. Honolulu, Hawaii Prime Consultant
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
b. MK Engineers, Ltd. Honolulu, Hawaii Subcontractor
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
c. Geolabs, Inc. Honolulu, Hawaii Subcontractor
(1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE
d. Cultural Surveys Hawaii, Inc. Honolulu, Hawaii Subcontractor
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
e. ControlPoint Surveying, Inc. Honolulu, Hawaii Subcontractor
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 11
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY
(Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project)
21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED
County of Hawaii's Hakalau Stream Bridge (Bridge No. 29-3)Emergency PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Repairs, Hilo, Island of Hawaii, Hawaii 2017 2018
23. PROJECT OWNER'S INFORMATION
a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER
County of Hawaii, Department of Public Allan Simeon (808) 961-8321
Works
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
The County of Hawaii's Hakalau Stream Bridge (Bridge No. 29-3)was built in 1930 as a stream crossing for the Old Mamalahoa Highway.
Over time, Hakalau Stream severely eroded the historic bridge's northern abutment creating a large scour cavity beneath the footing. On
February 9, 2017, Mayor Harry Kim issued an emergency proclamation recognizing the"imminent threat of the bridge suddenly collapsing"
and "the need for government agencies and/or representatives from the private sector to mobilize and provide immediate services". The
extent of the scour compromised the bridge's stability, and ultimately affected its ability to safely sustain vehicle loads. The County closed
the bridge to prevent the possibility of property damage and/or bodily injury.
Challenges of this project involved developing an appropriate fix for a historic bridge in the midst of U.S. Fish and Wildlife and National
Marine Fisheries concerns for numerous Section 7-protected species, including the Hawaiian Hawk, nesting waterbirds, and water quality
impacts to essential fish habitat downstream. The project team developed a feasibility study and coordinated with resource agencies to
identify the preferred solution. Relying heavily on
national research, the team developed and i - F j 9 ^..
designed an environmentally-sensitive approach s ,r
using grout bags to contain the slurry and fill the >- `"
growing scour cavity.` j
4
WSP coordinated and prepared documentation for
environmental clearances in NHPA Section 106, �'
ESA Section 7, Magnuson-Stevens Fisheries Act, .-.- or-, 1 f
Fish and Wildlife Coordination Act, Section 4(f),
CWA Section 404, CWA Section 401, CZM, and _ '-----,_!!,:.=Z- ...7 I - i
. -'_
NEPA Categorical Exclusions. , '
Compliance with Section 401 of the Clean Water _ '''''.i-0,...;-,'--21.-,.,-� 11' "'"''
Act utilized the Hawaii Department of a,,v ,,,, ,
Transportation's (HDOT) innovative In-Stream ��� �' " ` � .
Manual. WSP provided in-water inspections to 1` -. 4'4,- ,
monitor water quality throughout the duration of " t
construction,which verified water quality research a,1 ''� r1 t .- -� 1
and assumptions undertaken during design. .. . ._"-' .- `�`f \ii
Furthermore, the inspections ensured consistentl''''''‘'',''°:;':::‘-:::',''''''''N'::::
implementation of HDOT's 401 WQC monitoring "� �''"S°'program as agreed upon with the Hawaii wDepartment of Health. ro '
The PS&E, and all clearances were obtained in - " ;r ;Ty
less than 6 months.
Contract Value: $247 thousand
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
a. WSP USA Inc. Honolulu, Hawaii Subconsultant
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
b. KSF, Inc. Honolulu, Hawaii Prime Consultant
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 12
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY
(Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project)
21.TITLE AND LOCATION (City and State) 22.YEAR COMPLETED
Kauai Emergency Flood Repairs and Cleanup at Various Locations April 2018, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Northern and Eastern Kauai, Island of Kauai, Hawaii 2018 2019
23. PROJECT OWNER'S INFORMATION
a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER
Hawaii Department of Transportation, Larry Dill (808) 241-3006
Highways Division
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Mid-April 2018, record rains,wind, and flooding triggered landslides and undermined portions of Kuhio Highway,forcing its closure from
Hanalei to Kee. WSP assisted HDOT in the response to this unprecedented disaster through the preparation of Detailed Damage
Inspection Reports, environmental documents and permit applications, construction and permanent easement maps, and plans and
specifications for the recovery efforts spanning more than 26 individual sites. Sites included seventeen (17)slope clean-up sites with
slope faces as high as 70 feet; 3 roadway stabilizations,2 historic bridge replacements, 1 historic bridge rehabilitation, 1 CRM Wall
replacement, and repair of 2 stream/river crossings. Innovative methods were employed using a fiber reinforced polymer(FRP)to
rehabilitate the historic Waioli Bridge and negotiate the Section 106 Memorandum of Agreement.
WSP coordinated and prepared documentation for environmental clearances in NHPA Section 106 (including a Section 106 MOA), ESA
Section 7, Section 4(f), CWA Section 404 (4 letters of No Permit Required;5 Pre-Construction Notices/404 Permits), NEPA Categorical
Exclusions, and CWA Section 402 NPDES permits.
All clearances were obtained with 6 months. A summary of the repairs and locations are listed below.
Haena to Hanalei
1. Kuhio Highway(Route 560), Milepost(MP) 10 at Kee State Park: Reconstruct roadway
2. Limahuli Stream Crossing (Route 560), MP 9.55,: Repair concrete section lost in flooding. Resurface entire ford crossing;
3. Kuhio Highway(Route 560), MP 8.87 at Haena Beach Park: Repair roadway shoulder;
4. Manoa Stream Ford Crossing (Route 560), MP 8.76 near Haena Beach Park: Repair the entire crossing;
5. Kuhio Highway(Route 560), MP 6.5 (Repair Site 2): Roadway stabilization area with only 1 lane remaining: Debris removal, slope
wall installation including soil nails, foot of slope revetment, guardrail/sign replacement, pavement repair;
6. Kuhio Highway(Route 560), 15 locations or more from MP 6.5 through MP 4.4: Debris removal, slope scaling, slope stabilization,
guardrail replacement, pavement repairs;
7. Kuhio Highway(Route 560), MP 5.8: Stockpile area;
8. Kuhio Highway(Route 560), MP 4.5 (Repair Site 1): Roadway stabilization area: Debris removal, slope wall installation including
soil nails, foot of slope revetment, guardrail/sign replacement, pavement repair;
9. Kuhio Highway (Route 560), MP 4.4: Stockpile area;
10. Waikoko Bridge (Route 560): Replace existing bridge;
11. Waipa Bridge (Route 560): Replace existing bridge;
12. Kuhio Highway (Route 560), MP 3.7: Staging area;
13. Waioli Bridge (Route 560): Replace existing bridge; debris removal from under bridge
14. Kuhio Highway (Route 560), MP 1: Debris removal, slope scaling, guardrail replacement, minor pavement repair;
15. Kuhio Highway (Route 560), MP 0.5: Debris removal;
Kalihiwai
16. Kuhio Highway(Route 56), MP 25: Debris removal, slope scaling;
17. Kuhio Highway(Route 56), MP 24.9: Debris removal from under bridge, and concrete rubble masonry(CRM)wall replacement;
Wailua
18. Wailua Bridge (Route 56): Debris removal from river under bridge.
Contract Value: $1.1 million
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
a. WSP USA Inc. Honolulu, Hawaii Subconsultant
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
b. KSF, Inc. Honolulu, Hawaii Prime Consultant
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 13
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY
(Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project.)
21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED
Maluhia and Koloa Road Improvements PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Kauai, Hawaii On-going On-going
23. PROJECT OWNER'S INFORMATION
a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER
County of Kauai, Department of Public Mr. Troy Tanigawa (808)241-4154
Works
24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
WSP led a team to complete environmental clearances and design documents to reconstruct and rehabilitate Maluhia Road and Koloa
Road to maintain the riding surfaces for these increasingly utilized roadways. Involvement of federal funds also required the Kaua'i
County Department of Public Works(DPW)to comply with applicable federal and State design standards, including upgrading the
roadways to meet current safety standards where feasible. Based on the available right-of-way and the roadside topography,the project
involved adding 2-foot to 6-foot wide shoulders on each side of the roadway where it could be reasonably accommodated. The addition of
paved shoulders along this corridor was intended to provide a refuge area for disabled vehicles, as well as for bicyclists and pedestrians
(walkers and joggers). Additionally, the shoulders were intended to provide lateral support for the pavement structure, keeping the sub-
base in place to support the riding surface. They also channel storm water runoff farther away from the travel lanes which provides for
safer travel during periods of heavy downpours, but also reduces seepage into the pavement which can prolong the pavement life. In all,
the planned project included the following general tasks:
• Pavement rehabilitation, including
resurfacing and reconstruction, where
needed, on Koloa Road Kaumuali'i A .?'t
Highway to Po'ipu Road)and Maluhia Road : $
(Kaumuali'i Highway to Koloa Road), 4
oriP
• Extending the pavement shoulders by up to ;j , �6 • t ,� }
6 feet in each direction, where it can be . 4p4'
accommodated within the existing roadway -- f 4,04°'
right-of-way, .c �` "� ,, 'r
r #a 3 t.E
• Addition of a left-turn auxiliary lane on 1 ,
Koloa Road at Piko Road and Lauoho ► rtkikiiik- + . s
Road, ' L .:r,: •
• Addition of a left-turn pocket on Maluhia
Road from Ala Kinoiki,
• Restriping and pavement widening to '
create a left-turn auxiliary lane on Koloa "
Road at'Oma'o Road, 1111111101i 4 1 + - .
• Installation of a roundabout at the
intersection of Koloa Road and Ala •*
Kalanikaumaka, and
• Ancillary improvements, including minor
structural improvements at select and
discrete locations, such as endpost
construction, guardrail repair, drainage •
modifications, and other safety
improvements.
Environmental clearances involved with the project included:
• National Environmental Policy Act(NEPA), Categorical Exclusion
• National Historic Preservation Action (NHPA)Section 106, no adverse effect
• Endangered Species Act(ESA)Section 7, no effect
• Coastal Zone Management
Majority of the work was performed in-house, using WSP staff.
Contract Value: $896 thousand
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
a.
WSP USA Inc. Honolulu, Hawaii Prime
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 14
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY
(Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project)
21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED
Kamehameha Highway Realignment, Vicinity of Laniakea Beach, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
On-going
23. PROJECT OWNER'S INFORMATION
a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER
State of Hawaii, Department of Mr. Darell Young (808) 587-1835
Transportation, Highways Division
24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
A section of Kamehameha Highway at Laniakea is threatened by a variety of coastal hazards including chronic erosion, seasonal wave
overtopping, flooding and storm surges. The State Department of Transportation (HDOT)contracted WSP to perform investigations, studies,
peripheral planning and conceptual design analyses, and preliminary civil engineering services for the realignment of Kamehameha Highway
in the vicinity of Laniakea Beach.
WSP evaluated realignment alternatives using a Context Sensitive Solutions (CSS)approach consisting of a community advisory board,
meeting with individual resource agencies, major land owners, and adjacent residents. Agencies include the Department of Land and
Natural Resources' Office of Coastal and Conservation Lands (OCCL), Coastal Zone Management, State Historic Preservation Division, U.S.
Fish and Wildlife Service, National Marine Fisheries Service, the City and County of Honolulu's Parks and Recreation, and others to identify
a least impact alternative or preferred alignment. The preferred alternative involves naturalizing portions of the existing Kamehameha
Highway, and
implementing HDOT's
shoreline retreat policies. Co . EPT - " " ��` "
WSP is preparing an HRS t
343/NEPA environmental
assessment document. .41Ij
Other environmental
clearances include Section
4(f)Constructive Use,
Section 4(f)for Use of ""°
Parklands, Section 106 of
the NHPA, Section 7 of the
ESA, floodplain
4 �
yA
management, and 404
coordination. Of particular r,,,�
concern is minimizing
impacts to
Kahokuwelowelo, a heiau
significant for wayfinding in
•
which the Polynesian
Voyaging Society ,
perpetuates this traditional
practice.
Contract Value: $1.4 million
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
a. WSP USA Inc. Honolulu, Hawaii Prime
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
b.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 15
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY
(Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project.)
21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED
General Civil Engineering Services for Pavement Preventive Maintenance, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Statewide, Project Assignment Order#2: Interstate Route H-1 Rehabilitation, 2013 2015
Middle Street to Vicinity of Ward Avenue, Honolulu, Hawaii
23. PROJECT OWNER'S INFORMATION
a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER
Hawaii, Department of Transportation Mr. Ross Hironaka (808) 692-7575
24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
As part of an indefinite delivery contract with the Hawaii Department of Transportation (HDOT), WSP led a team to complete environmental
clearances; permitting requirements; and plans,specifications, and estimate (PS&E)for the rehabilitation of Interstate Route H-1, Middle
Street to Vicinity of Ward Avenue. We performed the bulk of the work in-house, including all environmental, permitting, and civil
engineering activities, under a very compressed schedule (nine months total). The project involved federal-aid through the Federal
Highways Administration (FHWA); therefore, both State of Hawaii and Federal requirements applied.
The project was completed in less than one year, including all environmental clearances and permits, from receiving notice to proceed.
Environmental clearances involved included:
• Federal:
o National Environmental Policy Act(NEPA), Categorical Exclusion
o National Historic Preservation Action (NHPA)Section 106, no adverse effect; activities conducted by WSP to reach this outcome
included several consultations with Native Hawaiian organizations (NHOs)and meetings with the State Historic Preservation
Division (SHPD)
o Endangered Species Act(ESA)Section 7, no effect
o Department of Transportation Act 1966, Section 4(f), de minimis
• State:
o Hawaii Revised Statutes (HRS)Chapter 343, Environmental Assessment/Finding of No Significant Impact(FEA/FONSI)
o HRS Chapter 6E, no inventory survey required
During the scoping and design process we were careful to avoid triggering certain permits. We were able to design a bridge widening to
avoid triggering a Clean Water Act(CWA)Section 404 Department of Army and a CWA Section 401 Water Quality Certification. The Army
Corps of Engineers reviewed our plans and agreed that a CWA Section 404 permit would not be required. Permits that were required
included the following:
• Coastal Zone Management(CZM) Federal Consistency
• National Pollutant Discharge Elimination System (NPDES),general permit with site-specific BMPs
• Noise Permit
• Noise Variance
We completed the PS&E package and assisted the HDOT during bidding. The project design included:
• Repaving, reconstruction, and rehabilitation of interstate, as appropriate, including repair of water seepage areas
• Restriping of the interstate to accommodate four through lanes in each direction, including regulatory,warning, and destination sign
modifications
• Design exception approval from FHWA
• Widening of the Nu'uanu Stream Bridge
• Geosynthetic Reinforced Soil (GRS)wall for slope stability
• Modifications to retaining walls, guardrails, crash attenuators, and other interstate features necessary to accommodate the four
through lanes
• Transportation management plan,which included complete closure of the interstate
• Highway lighting upgrades to meet future LED light fixture illumination levels
• Coordination with land owners, lessees, and the HDOT for construction parcels
• A+B bidding specifications, including road user cost analysis
• Incentive/disincentives for early completion
We managed two public informational meetings for the project. The meetings were primarily held to support the HRS Chapter 343 process
and the Noise Variance, but included detailed project plans. The team made all arrangements for the meetings; sent invitations to the
public, including bulk mail and legal ads; drafted press announcements; prepared meeting materials such as posters and handouts; and
interacted with the attending public, including making presentations and answering questions.
Contract Value: $1.75 million
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
a.
WSP USA Inc. Honolulu, Hawaii Prime
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 16
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY
(Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project.)
21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED
Hardy Street Improvements PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Kauai, Hawaii 2012 2015
23. PROJECT OWNER'S INFORMATION
a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER
County of Kauai Mr. Douglas Haigh (retired) (808)241-4849
24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
WSP led a team to complete environmental clearances and RFQ procurement documents/technical provisions for a complete streets
design-build project in the heart of Lihue town. WSP performed the bulk of the work in-house, including all environmental clearances and
civil engineering activities. The project involved Federal aid through the Federal
Highways Administration (FHWA); therefore, County, State of Hawai'i, and Federal
requirements applied.
The project emphasized implementing complete street concepts to improve
vehicular, pedestrian, and bicycle circulation along Hardy Street in the vicinity of the
Civic Center. The project's conceptual design also included:
`, j�
• Reconstruction of traffic lanes, �"
• Addition of left turn lanes,
• Reconstruction of sidewalk and driveway areas, ® a�
• Designation of bike lanes,
• Construction of a roundabout with a central feature to showcase the
entrance to the civic center area,
• Landscaping,
• Utility adjustments and undergrounding of utility lines,
• Improvements to a bus bay pullout, and
• Drainage improvements.
Environmental clearances involved with the project included:
• National Environmental Policy Act(NEPA), Categorical Exclusion
y ;
• National Historic Preservation Action (NHPA)Section 106, no adverse
effect
• Endangered Species Act(ESA)Section 7, no effect ,,
• Coastal Zone Management {{
WSP provided technical review of each Offeror's design concept proposal and assisted during the team interviews. WSP also prepared a
detailed bid evaluation package which included a written evaluation of each submittal, preparation of interview questions, meeting minutes
for each team interview, compilation of panel's evaluation scores and comments, tabulation of Contractor's bids, documentation of
discussions with bidder's regarding apparent line item discrepancies, and tabulation of the final design concept+ price score.
Contract Value: $262 thousand
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
a.
WSP USA Inc. Honolulu, Hawaii Prime
b. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
C.
d (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
e.
f (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 17
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY
(Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project)
21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED
Honoapi'ilani Highway Improvements PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Maui, Hawaii On-going
23. PROJECT OWNER'S INFORMATION
a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER
Hawaii Department of Transportation Ms. Genevieve Sullivan (808)587-1834
Highways Division, Planning Branch
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
The scenic coastal Honoapi'ilani Highway(State Route No. 30) is a two-lane highway that currently serves as the primary access route
to and from West Maui. This project is proposed to improve the resiliency of approximately six miles of the highway between
Ukumehame and Launiupoko. Flooding caused by high wave wash are regular occurrences on this low-lying highway,which results in
hazardous conditions, delay and roadway closures.As the primary access to West Maui,when these road closures occur, they have
significant impacts on the quality of life for West Maui residents, and the West Maui economy.
` \
l e 4
1
�
px��'w 3
ASL ': r
For the Hawai'i Department of Transportation (HDOT), and in collaboration with the Federal Highway Administration (FHWA), WSP is
providing comprehensive transportation planning, preliminary design, and cultural and environmental impact assessment for the
Honoapi'ilani Highway Improvements Project in West Maui. This important resiliency project is evaluating the realignment of about six
miles of the coastal highway which is a key arterial providing the main access to West Maui for workers, visitors, and goods movement.
The project is intended to address existing coastal erosion and flooding, as well as future coastal erosion and flooding caused by
anticipated sea level rise that have been identified as exposed and potentially vulnerable to sea level rise.The project has been awarded
a Rebuilding American Infrastructure with Sustainability and Equity (RAISE)grant which established a timeline for completion of an
Environmental Impact Statement(EIS), pursuant to the National Enviornmental Policy Act(NEPA)and the Hawai'i Enviornmental Policy
Act(HEPA).
WSP helped establish a reasonable range of alternatives in collaboration with HDOT and FHWA and facilitated early public and agency
outreach to refine the alternatives to be evaluated in the EIS. In the fall of 2022, FHWA issued a Notice of Intent to prepare an EIS and
initiated scoping, agency coordination and development of the USDOT dashboard, and public scoping meetings. The WSP team
coordinated the development of the scope, the hybrid in-person and virtual meetings, and is leading the EIS technical work including the
cultural resources work as part of the Section 106 and Hawai'i 6E processes.A Scoping Report summarizing the scoping process and
public comment on the scope of work was issued in May 2023. The draft EIS will assess four alternatives across a comprehensive array
of environmental impact assessment analyses including natural resources (i.e., seal level rise,wetlands,threatened and engangered
species,water quality), the built environment(i.e.,traffic and transportation, air quality, noise), and social and community context(i.e.,
land use, Environmental Justice, historic and archeological resources). This evaluation will lead to the selection of a Preferred Alterantive
which will be the basis for more refined preliminary and final design. More information can be found at
https://www.honoapiilanihwyimprovements.com/
Contract Value: $1.3 million
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
a. WSP USA Inc. Honolulu, Hawaii Prime consultant
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 18
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY 28. EXAMPLE PROJECTS LISTED IN SECTION F
PERSONNEL 27. ROLE IN EXAMPLE (Fill in "Example Projects Key"section below before completing
(From Section E, PROJECT table. Place"X" under project key number for participation in same or
Block 12) similar role.)
1 2 3 4 5 6 7 8 9 10
Randall Urasaki PIC or Technical Resource/ X X X X X X X X X X
Quality Assurance
Todd Nishioka Technical Resource/Quality X X X
Assurance (Environmental)
Darin Chinen Technical Resource/Quality X
Assurance (Civil)
Allen Kam Project Manager or
Environmental Task Leader
Nami Ohtomo Project Manager or X X X X X
Environmental Task Leader
Pamela Uyeda Project Manager or Civil Task X X X X X
Leader
Wayne Yoshioka Traffic/Transportation Task X
Leader
29.EXAMPLE PROJECTS KEY
NO. TITLE OF EXAMPLE PROJECT(FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT(FROM SECTION F)
1 DDC Environmental Permitting, Oahu, Hawaii 6 Maluhia and Koloa Road Improvements
East Kapolei Rail Station Multimodal Access Improvements, General Civil Engineering Services for Pavement
2 Oahu, Hawaii Preventive Maintenance, Statewide, Project Assignment
Order#2: Interstate Route H-1 Rehabilitation, Middle Street
to Vicinity of Ward Avenue
3 Farrington Highway Intersection Improvements at Nanakuli 8 Kamehameha Highway Realignment, Vicinity of Laniakea
Avenue and Haleakala Avenue, Island of Oahu, Hawaii Beach
4 County of Hawaii's Hakalau Stream Bridge (Bridge No. 29- 9 Hardy Street Improvements
3) Emergency Repairs, Hilo, Island of Hawaii, Hawaii
Kauai Emergency Flood Repairs and Cleanup at Various Honoapi'ilani Highway Improvements
5 Locations April 2018, Northern and Eastern Kauai, Island of 10
Kauai, Hawaii
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 19
H.ADDITIONAL INFORMATION
30.PROVIDE ANY ADDITIONAL INFORMATION AT YOUR DISCRETION.ATTACH ADDITIONAL SHEETS AS NEEDED.
Additional information is presented in the Firm Qualifications section.
I.AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
31.SIGNATURE 32.DATE
June 30, 2023
33.NAME AND TITLE
Randall M. Urasaki, Senior Vice President, Director—Local Business Leader
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 20
1. SOLICITATION NUMBER (If any)
ARCHITECT-ENGINEER QUALIFICATIONS PL.5)Community Planning (Environmental
Planning, Environmental Assessments,
Environmental Impact Statements)
PART 11-GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM(OR BRANCH OFFICE)NAME 3. YEAR ESTABLISHED 4. Unique Entity Identifier
WSP USA Inc. Honolulu Office-1966 C52ATLNG1MJ9
2b STREET 5. OWNERSHIP
1001 Bishop Street, ASB Tower,Suite 2400 a.TYPE
Corporation
2c. CITY 12d STATE 12e.ZIP CODE b.SMALL BUSINESS STATUS
Honolulu HI 96813
6a,POINT OF CONTACT NAME AND TITLE 7. NAME OF FIRM(if block 2a is a branch office)
Randall M. Urasaki, Senior Vice President, Director—Local business Leader WSP USA Inc.
6b, TELEPHONE NUMBER 6c EMAIL ADDRESS
808-566-2260 rand al I.u rasaki(c�wsp.com
8a.FORMER FIRM NAME(S) (If any) 8b.YR.ESTABLISHED 8c. Unique Entity Identifier
Parsons Brinckerhoff Quade&Douglas until 11/2006 PB Americas, Inc. 1933 05-666-8700
until 11/1/2011 Parsons Brinckerhoff, Inc. until 05/2017
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a Function c.No of Employees a Profile cl Revenue
Code b Discipline (1)FIRM (21 BRANCH Code b Experience Index
02 Administrative 1533 2 A06 Airports;Terminals and Hangars;Freight Handling 1
07 Biologist 42 1 B02 Bridges 2
08 CADD Technician 245 4 C15 Construction Management 4
12 Civil Engineer 1159 19 D04 Design-Build-Preparation of Requests for Proposals 1
24 Environmental Scientist 473 6 E09 Environmental Impact Studies;Assessments or Statements 3
29 GIS Specialist 53 2 Ell Environmental Planning 3
Other Employees 5392 H01 Harbors;Jetties;Piers;Ship Terminal Facilities 1
H07 Highways;Streets;Airfield Paving;Parking Lots 6
106 Irrigation;Drainage 4
L01 Laboratories;Medical Research Facilities 1
L03 Landscape Architecture 5
P05 Planning(Community,Regional.Area wide and State) 5
P06 Planning(Site,Installation and Project) 1
R03 Railroad;Rapid Transit 3
S13 Storm,Water Handling&Facilities 4
T03 Traffic and Transportation Engineering 3
Total 8897 34
11.ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX BY NUMBER
SERVICES REVENUES OF FIRM
FOR LAST 3 YEARS 1. Less than$100,000 6. $2 million to less than$5 million
(Insert revenue Index number shown at right) 2. $100,000 to less than$250,000 7. $5 million to less than$10 million
a.Federal Work 10 3. $250,000 to less than$500,000 8. $10 million to less than$25 million
4. $500,000 to less than $1 million 9. $25 million to less than$50 million
b Non-Federal Work 10 5. $1 million to less than$2 million 10.$50 million or greater
c.Total Work 10
12.AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts
a. SIGNA b
DATE
* May 2022
C. AME AND TITLE
Randall M. Urasaki, Senior Vice President, Director—
Local Business Leader
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2006)PART II- PAGE 21
*Reflects staff and revenue as of this date
NNS I )
FIRM QUALIFICATIONS
WHO WE ARE
Established in 1933, WSP USA Inc. (WSP) has over 90 years of engineering experience.
Resources Available: The Honolulu office was opened in April 1966 and our current local Honolulu staff
numbers 42, including 16 licensed professional engineers, two certified inspectors in sediment and erosion
control(CISEC), and two AICP professionals. The Honolulu office is highly capable of providing professional
services to assist the County in the planning and design of public works projects.
We are very interested in providing planning and design services to the County of Hawaii. We have a broadly
capable, flexible and knowledgeable staff with skills in planning and design readily available to work with the
County's staff.We offer a strong, locally experienced team with knowledge in all phases of federal-aid and
non-federal-aid roadway projects. This team will be highly responsive to the County's requirements.
The three most prominent qualities that WSP will bring to the County of Hawaii are below:
— Extensive relevant experience with federal-aid and non-federal aid projects.
— High technical competency in project management, planning and design.
— Project Engineers with access to a large pool of technical and management resources.
Some other advantages that our firm offers include:
— Over 57 years of success in delivering projects in Hawaii.
— Depth,breadth and quality of planning and engineering resources, anchored in Honolulu.
— "One-stop shopping"resulting in faster and better work production,
— Project managers with experience in all phases of planning and design.
— Complete familiarity with the Federal, State and county standards and procedures.
— Long-standing relationship with Federal, State and county regulatory agencies.
Our management approach provides the team with the advantage of operating as a local firm with rapid
response to the County's needs,while simultaneously having access to resources and expertise of a large,
multi-disciplined consulting firm. Team members have worked on projects that range in sizes from small
intersection improvements to major roadway construction contracts. The volume of repeat clients testifies to
the level of client satisfaction WSP enjoys on small, as well as large projects.
We have extensive experience in the preparation of plans, specifications and estimates (PS&E) for public
works projects in the State of Hawaii, and have a proven repeat-business track record that attests to our
capability to produce quality work on time and within budget.
Commitment to Equal Opportunity: WSP is firmly committed to the principles and practices of Equal
Opportunity and has demonstrated such commitment in the past through hiring and through the selection of
qualified Disadvantaged Business Enterprise (DBE) and Woman-Owned Business Enterprise (WBE) firms for
participation on project teams.
We take our commitment to diversity as seriously as we take our commitment to technical excellence. In
order for our commitment to be of real value,we recognize that it is not enough to simply assign DBE firms a
role on our project team,but rather to match firm capabilities, interests and opportunities for growth with
NN )
meaningful roles. Ifseycedf£apoec assignment,we will strive to include DBE firms to the maximum
extent practicable.
EXPERIENCE OF WSPUS INC HONOLULU PROFESSIONAL STAFF
Planning \ Design ) CM/PM )GIS
) .EE 2 :: ) \
4. \ / /
EE } - \ { 4. k
} § k • & 2 2 ) { / ±
g _ § _
° EE 2 } CO CD a B - ) \ ( /
§ / } / \ / •: » 7 } k } \ \ 2 .. \
% E _ y \ K \ ) / r _ , 2 / m a
/ ) ® / \ 7 3 / :i:1!. \ ) E [
I @ / » E & . ± > u 2 /
E § ./ ) ./ E E § :. \ \ / E a g o § ® \ Q / \
.. > o � 2 m u
Name \ 2 . = ) = } d. ., 2d. .• . ti,
.% . Ed. ., . JI
A y man, Nana (C PM) 13 \ / \ e e I \ \
Amemiy , Eveett 1 § { ( ® ) ƒ
Andrade, Gerald (PE, CISEC) 30 1: •• | • [ •e •e •e •e •e •e / •e •• \ •
Bautista, Nick 12 / { { •• • • ) ƒ e
Bueno, Valentin (PE) 28 •) • | • F. e e e e e e / e • \
chnen, Darin (PE) 34 / • • { • \ • • • • ) • • /
]delaCuz, Eugenio 32 \ • •• •• •e •e \
\) ƒFkkPadgq 40 • • e • • • e e
) \
Gohenouer, Benjamin 3 • •• )
e
Hk$Justin 3 ] / ® •
\ ®
\ • • • /Ho, Douglas 5 §Huhes, Makm&mea 1 ) e •e }
Kam,Allen 30 ) •• • •• ••
Kaematsu, Lara (PE) 19 ] •• • e •e •e •e .. •e )
e
KasammG Robin (PE) 25 \ e ; • : e • e e e ; • • / •
{ e •\ }K7k1G am§ 16 • •• . e
Lau, Ethan
1 ) • • • \ e
\) )9mmuan, Randall 54 : e
)
9kmnaa, P@mp7G 20 \ •
• ••
\} j
McClellan, 9e,+ Ig ) e •e e • •
)NakmmG Megan 2 : •
Nakasone,Trevor 3 ] • (
Nishak,Todd (PE) 28 ) • \ •• •• •• ( •• •• •• /
J \Ohtomo, Nami 30 ) •• • • • • : • • ra !! • e e
R ichelder! r,Jan (CPG) 38 ) •• } • • { • •. }
\• • • • • •S+vdoR]7eph (PE) 19 •• e
\\Sato, Larissa (PE) 36 e { • • • \ • • • • e ra }
)Sv Jr,] Dennisnets(rA 26 • / •• •• •• •• ! • E
NNS I )
EXPERIENCE OF WSP USA INC HONOLULU PROFESSIONAL STAFF
Planning I Design 1 CM/PM i§iGIS
c
O
o
I Q
W
•
c
E
U Gp in
v •
° a-+ i h0 N N
C p�,p O O "� i3 CO Q _ (6 C
N to ato-
C c >, +' I3j1ij
O I ao cii:cc ; o. a � +. E E v, a
Ec = ao
U) E ° c v E > o m v 2 aoi o a ° aoi
Name > a s W a u 1- z m 1— o u - o
;
Small, Matthew(AICP) 22 • • • • •
Sugibayashi,Jason (PE) 16 • • •• •• •
•
Torres, Selena 7 • • •
•
Urasaki, Randall (PE, LEED AP) 36 • •• •• • •• •• •• •• •• ••
Uyeda, Pamela (PE, LEED AP, CISEC) 27 • • • • • • • •
Weiss, Amber 1 •
• • • •
Wong, Kevin (PE) 48 • • • • • • • • • •
Yoshioka, Wayne 43 • • •
QUALIFICATIONS, EXPERIENCE AND CAPABILITIES OF WSP
ENVIRONMENTAL PLANNING
PREPARATION OF ENVIRONMENTAL DOCUMENTS
We have extensive experience and a thorough knowledge of both State and Federal regulations in the
preparation and processing of environmental impact statements (EIS), categorical exclusions (CatEx),
environmental assessments (EA),and Section 4(f) evaluations.
The following projects are examples of our services in this area:
— Farrington Highway Improvements at Nanakuli and Haleakala Avenues
— Fort Barrette Road Widening
— Honolulu High-Capacity Transit Corridor
PERMITS
WSP has gained extensive experience and a thorough knowledge of State of Hawaii and Federal regulations
and guidelines in the preparation and processing of national pollutant discharge elimination system(NPDES)
permits, grading and grubbing approvals, hazardous materials coordination and procedures, and many other
environmental procedures and documents. Examples of our capabilities in this area include the Big Island
Earthquake Assistance project,Waipio Point Access Road project, Kaumualii Highway-Permitting Support
for Final Design project, Statewide Storm Water Management Program, and many other projects.
" N I )
PUBLIC PARTICIPATION MEETINGS
Public participation efforts can be a key part of successful projects. The following are examples of projects in
which we had an active public involvement program:
— Honolulu High-Capacity Transit Corridor
— Honoapiilani Highway Widening/Realignment
— Kamehameha Highway Improvements, Waihona Street to Center Drive
— Statewide Storm Water Management Program-the public outreach portion won several awards
ENVIRONMENTAL COMPLIANCE SERVICES
We have extensive experience and a thorough knowledge of State of Hawaii, county, and Federal Highways
Administration(FHWA) regulations and guidelines in the preparation and processing of EAs, findings of no
significant impact(FONSIs), CatExs, Section 106 memoranda of agreement(MOAs), Section 7 coordination,
wetlands delineations and functions and values assessments, U.S.Army Corps of Engineers (USACE) permits,
NPDES permits, grading and grubbing approvals, compliance with Section 343 of Hawaii Revised Statutes,
hazardous materials coordination and procedures,Burial Council approvals, and many other environmental
procedures and documents.Examples of our capabilities in this area include the Interstate Route H-3 project,
the Farrington Highway Improvements at Nanakuli and Haleakala Avenues project, the Statewide Storm
Water Management Program, and most of the other projects presently underway in the office.These projects
all involve the coordination of numerous professionals with expertise spanning a broad range of disciplines.
"NN I )
•
Regulatory Appraisal • • • • • • • • • •
•
Socio-Economic • • • • • • • • • • • •
•
Visual and Aesthetic Studies • • • • • • • • • •
•
Farmland Conversion Assessment • • • • •
•
Air Quality Studies • • • • • • • • • •
eg Noise and Vibration Studies • • • • • • • • • • • •
•
'' Wetland Delineation • • • •
C •
g Floodplain Studies • • • •
0
.5 Jurisdictional Determinations • • • • •
C •
re Botanical • • • • • • • • •
•
Wildlife/Avi-Faunal • • • • • • • • • • • `o
w •
Historic and Archaeological Study • • • • • • • • • • • • • • •
•Phase 1 Site Assessment • • • •
E
Hazardous Waste Assessment • • • • • • * coo a
Grading Permit • • • • m
,-
Building
Building Permit • ' E
ro •
Navy Site Plan Review td
Letter of Map Revision(FEMA) • �' a
FAA Approval •
Underground Injection Control • 1 'i.
° Noise Variance • • • • • • • • • g g
a o .5 •
yd NPDES • • • • • • • • • • • • • • • • • • • • .5 a
U w
'° wu -
u
= ' Permit Special Management Area Use • • • • •
'C" Conservation District Use Permit • • • G �u
= °" ESA Section 7 Consultations • • • • • • ,,
WMHPA Section 106,including MOAs • • • • • • • • A •
Stream Channel Alteration Permit • • • • • • • 'i.g N' .P
•
= Water Quality Certification(Sec.401) 5 • • • • • •
x
11
E Department of the Army Permit(Sec.404) • • • • • • • .5 x
E W •
= CZM Consistency Determination • • • • • • • • • • w ¢ .p
O °
S.5 d
Section 4(f) • • • • • • • • • • o
= Task Force • • • w
W o Public Hearing/Meetings • x x - x w U
G HRS Chapter 343 ^ d UUd U .- .^ d ddd Q U d U d -/ - -/ -/ -/ r,14
yi a Environmental Impact Statement • • • b.0°°
G.) a° x Environmental Assessment/FONSI • • • • • • • • •
CA u
Exemption • • • • • • • • U
C
gNational Environmental Policy Act d d U U U U - d U d U U U U U U -/ - C..) d
° Supplemental EIS •
w w Environmental Impact Statement/ROD • • •
Z
Environmental Assessment/FONSI • • • • • • •
Categorical Exclusion • • • • • • • • • • • • •
•
Type of Facility a 124 - 124124 122 122 122H 122 122 122 122 122 122 - - - 122 122 122re
rx rx rx - rx rx rx rx rx rx rx U
'6. 6
f
ro ..
a
., o . I o
ate °
G oN a x
is ¢ P 2., :- o.E6 g ob o
a ab ., Px . 9 ° o t - ,q)- , g •p
,' b 3 3 Ji! j op° ° N °5.•Cax a °
a O C a4 p o n G - o ° 0. 7 `g v a w x a
° '[�+ N ,, 2 0:::LL / o .d c- ° P.' ,t1,1"- "> '61' ->.' a' ° '0' spy
'� �' yr y o o yr '� .° '� •
.� .� aro ` ° .� o ° :�1 r > '°'
' , , 4 O R. v `d3 p y to R, 4' ° e o d ❑p
b. m v oGp w d' o ,ra ,r� o ° O 6 yr , . ° ro o ,-.
Fol,x sii w 33Lxx :- - .� • . b a y t, E- w • ° o ; za 22 G � -
Ua12H-w G °o x b' AA 'u .� o am w� ., Ed >, °, " app ° ob o
-.27.'
v . 7, rot o .� o 8 Ag -gtx j 3U . .o . 1 o :o
° z s z E�
a xo Pxxxx931 ' zo. a A looa41 A o. 3 Jww° x :0, •
" � ! r
COMPUTER IMAGING
To respond to community concerns regarding potential visual impacts of a project and the successfulness of
proposed visual mitigation techniques,WSP can provide computer-generated visual simulations.We have
developed a unique computer rendering process which can accurately depict projects from conceptual
planning through construction and operations.
Using a combination of 3D computer modeling,
scanned photography, and high resolution
computer painting and retouching techniques,
our firm has produced images of the Castle - ' '.• a '4,
Junction Rockfall Protection,Thirty Meter1
Telescope EIS and Historic Preservation Process, I 110111 I
and Honolulu High-Capacity Transit Corridor
projects.
GEOGRAPHIC INFORMATION SYSTEM (GIS)
WSP has successfully used GIS technology as both a tool in every day planning and design services, as well as
in providing highly customized technical services, and has innovatively applied GIS technology for a variety
of federal-aid, State, City, and private infrastructure and transportation projects.Assignments have included
the design, development, and implementation of web applications for progressive asset and program
management.The firm has also built comprehensive inventories/databases for island-wide studies,
incorporating Global Positioning Systems (GPS)technology into a seamless web-based application,resulting
in up-to-date, field verified information that is readily available to all users over the worldwide web. In
addition to application and data development,we have successfully employed GIS on a wide range of
infrastructure projects, including transportation corridor (highway and railroad) analyses, site selection
analyses (Statewide), regional planning and major investment studies, environmental impact and natural
resource management projects,utility, and facility projects.
Our GIS software capabilities include:Arclnfo;ArcEditor;ArcView/ArcMap;ArcGIS Engine; ERDAS Imagine;
Intergraph MGE and GeoMedia; Mapinfo;AutoCAD Map;TransCAD, as well as Pathfinder Office and Terrasync
for GPS field work.We have the capacity to code GIS based applications using Java, and Visual Basic
programming languages.For database management,we have the capability to integrate, and produce data in
many file formats as well as link spatial data with PC and multi-user databases, such as Access, SQL Server,
and Oracle.
One of our recent project experience with GIS mapping and application development is the creation of an
asset management system under our contract with Hawaii Department of Transportation(HDOT) to develop
a Statewide Storm Water Management Program(SSWMP).
WATER QUALITY MONITORING
We have experience in stormwater quality monitoring using automated refrigerated samplers for both in-
stream and end-of-pipe applications. A typical site is equipped with a rain gage, area velocity flow meter or
bubbler, data logger, automated refrigerated sampler, cellular modem for remote access, and power source
(batteries with photovoltaic backup). We have also conducted grab samples and collected various Quality
Control (QC) samples to identify, quantify, and document any bias and variability in the data that results from
the collection, processing,transportation, and/or handling of the samples. The sampling results have been
NNS I )
used to calculate Event Mean Concentrations (EMC) for specific land uses which have been used to
demonstrate compliance with Total Maximum Daily Load(TMDL) requirements.
ENVIRONMENTAL PROTECTION AGENCY(EPA) CONSENT DECREE COMPLIANCE
SERVICES
We have extensive experience in EPA Consent Decree compliance,having developed and managed HDOT's
SSWMP in response to HDOT's EPA Consent Decree.We also have extensive experience in working with the
State of Hawaii, Department of Health, Clean Water Branch's engineering and enforcement sections with
regards to the NPDES and 401 WQC requirements. Similarly,we have worked with the Department of Health,
Solid Waste Program's personnel on permitting and compliance issues. Examples of our capabilities in this
area include the SSWMP and EPA Public Outreach and Training Program(Both with HDOT). These projects
involve the coordination of numerous professionals with expertise spanning a broad range of disciplines.
CIVIL ENGINEERING
Our civil engineers have a broad range of design experience on federal-aid and non-federal-aid projects and
have the skills and knowledge to take a project from preliminary design through final design, and including
construction management. Constructibility,with special consideration for maintenance of traffic, property
adjustments, utility relocations, environmental protection, and other constraints, is our specialty in the
preparation of construction plans and specifications.The NELHA Airport Connector Roads and Other Roads
on Host Park and Farrington Highway Improvements at Nanakuli Avenue and Haleakala Avenue are examples
of our capabilities in this area. Our civil engineering staff is experienced in the latest State and Federal
standards and requirements, and is capable of providing the following services:
— Conceptual Design Studies
— Program Management
— Project Management
— PS&E Preparation
— Construction Management
HYDROLOGY AND HYDRAULICS DESIGN
We have extensive experience in hydrology and hydraulics. Our projects have advanced the state-of-the-art
and have won numerous awards for engineering technology, and have designed open channels and closed
conduit, storm drain systems, catch basins, energy dissipater structures, inlets, and outlets.
Examples of our drainage designs and stream improvements in Hawaii include Waimanalo Flood Control and
Drainage, Interstate Route H-3, Moanalua Road, and Keehi Interchange.For the Hawaii Water Systems
Technical Studies Program Statewide Dam Break Analyses State of Hawaii for the USACE/Department of Land
and Natural Resources (DLNR), our team was tasked with performing field investigations, hydrologic and
hydraulic modeling of various dam break scenarios, and flood inundation mapping for the Puu Lua Reservoir
on the island of Kauai and the Kualapuu Reservoir on the island of Molokai. In addition,we provided services
on the Central Oahu Watershed Study,Phase 2 for the USACE/City and County Department of Environmental
Services. On that project,the team was tasked with selecting an appropriate watershed model and then
applying that model to the Waikele watershed.
NNS I )
CIVIL/SITE DEVELOPMENT DESIGN
Our engineers are very proficient in site development services, including grading, access roads,parking lots,
water and wastewater facilities, fencing, etc. The NELHA Airport Connector Roads and Other Roads on Host
Park and HART On-Call Construction Contractor projects are examples of our capabilities in this area.
ROADWAY REHABILITATION DESIGN
WSP has been contracted by the City and County of Honolulu (City), Department of Design and Construction
(DDC) to design roadway rehabilitation projects for various streets in Honolulu. Design responsibilities
included field reconnaissance of existing conditions for roadway, sidewalk, curb and gutter, and drainage
facilities;preparation of plans and specifications, and coordination with the City's Department of Facility
Maintenance on proposed remedial work; coordination with the City's Department of Transportation
Services on replacement and/or modifications of existing pavement markings; and preparation of bid
documents and addenda for project construction contracts. Responsibilities during construction included
design support services for preparation of Post Contract Documents (PCD), and review of contractor
submittals and requests for information(RFIs).
SEWER DESIGN
We are experienced in sewer rehabilitation work throughout various communities on the island of Oahu.The
work involved rehabilitating small mainline sewer systems using the cured-in-place pipe method as well as
replacing deteriorated sections of sewer line.Also included in this work was the rehabilitation of existing
sewer manholes.
WSP is experienced in the conversion of Large Capacity Cesspools (LCC) and the permitting as required by
EPA and the Department of Health.We have performed Cesspool Conversion studies for the USACE at the
Pohakuloa Training Area and Kilauea Military Camp (KMC) on the island of Hawaii. For KMC,we designed 18
Individual Water Systems (IWS), converting 16 cesspools, abandoning two cesspools and obtaining all
necessary permits.Permits for the conversion work included obtaining Approval to Construct, the IWS
Variance, Construction Inspection and Approval to Use letters from the Department of Health(DOH),
Wastewater Branch; permit to operate and a permit to abandon from DOH Safe Drinking Water Branch; and a
NPDES permit from DOH Clean Water Branch.
TRENCHLESS TECHNOLOGY
The Honolulu office staff has incorporated trenchless technology design in the H-3 Roadway Finish Unit II
project in Aiea where micro-tunneling design solutions were used for waterline installation under the heavily
traveled H-1 Freeway to minimize disruption to traffic.
Our available technical resources include individuals at the forefront of the advance of trenchless technology.
Several are members of the North American Society of Trenchless Technology(NASTY) and sit on various
committees.We offer services including feasibility studies; cost comparisons of micro-tunneling vs.
conventional trenching; preparation of plans and specifications; and development of initial support systems
for larger tunnels.
NNS I )
ROADWAY SAFETY IMPROVEMENTS
We are fully knowledgeable in the latest Federal requirements for guardrails and other roadway features.We
have trained staff familiar with AASHTO's Roadside Design Guide and with the National Cooperative Highway
Research Program's Report 350.
TRANSPORTATION PLANNING/TRAFFIC ENGINEERING
The Honolulu office has extensive experience in transportation planning studies including traffic impact
studies, alternative analyses,transportation system management(TSM) studies, high occupancy vehicle
(HOV) planning and transit planning. Our traffic engineering experience includes highway and intersection
capacity analyses,traffic signal design and optimization, and the development of maintenance of traffic
plans.
TRAFFIC IMPACT ASSESSMENT SERVICES
We have conducted numerous traffic impact analyses throughout Hawaii and are aware of the types of issues
that are often raised. Our strengths lie in our ability to listen to those issues and in our comprehensive
knowledge and experience base that help us develop cost-effective solutions to those issues.The Waimea
Circulation Study is an example of our ability to address community concerns.
TRAFFIC SIGNAL DESIGN
WSP is experienced in traffic signal design for standalone and for multi-signal systems applications. Our staff
is familiar with state-of-the-art signal design elements and has completed traffic signal installations in
Hawaii.We are familiar with local practices for signal design and in preparing PS&Es according to HDOT and
FHWA standards.We are also committed to thoroughly understanding the project issues so that the traffic
signal is well integrated with the intersection in terms of signal phasing, signal timing, and intersection
channelization.
TRAFFIC CONTROL
Many design and construction projects require complex traffic control plans or detour plans to re-route
traffic. The transportation/traffic group provides expertise in providing innovative and creative solutions to
minimize traffic impacts during construction. The Farrington Highway Improvements at Nanakuli Avenue
and Haleakala Avenue and Interstate Route H-1 Rehabilitation projects are examples of our capabilities in this
area,where high volumes of traffic flow had to be maintained during the construction of highways and
complex highway interchanges in urban areas of Honolulu.
CONSTRUCTION/PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
Our firm provided construction management services for the Interstate Route H-3 Trans-Koolau Tunnel
project which was constructed through six separate construction projects:Halawa Approach and Tunnels,
Haiku Approach and Tunnels,Ventilation Fans, Traffic Control Systems,Tunnel Mechanical/Electrical/
Architectural Finishes, and Exploratory Tunnel Finishes. Our construction management staff dealt with the
complex challenges of coordinating and interfacing unique construction contracts into the final tunnel
product.We provided the overall construction management of multiple contractors, construction
NNS I )
engineering, post-design services, and construction inspection services.At the peak of this project,nine
engineers and 17 inspectors were part of the on-site construction management staff provided by our firm.
We provided full construction management services for Interstate Route H-3. Our management
responsibilities included assisting the HDOT in implementing construction management techniques such as
dispute review boards,value engineering analysis,partnering, and planning coordination.
Currently,we are providing engineering and inspection services for pavement preservation projects at
various locations on Oahu.Work includes engineering and inspection duties under the direction of a City
project manager.
The Honolulu engineering staff also provides engineering support during construction, permit application
support,value engineering support, and claims resolution.
PROGRAM MANAGEMENT
We are providing program management services for the City's rehabilitation of streets program.Work
includes coordination of City in-house designs, preparation of standard specifications and plan details, and
miscellaneous program management services.
We provided full program management services for the Interstate Route H-3 project which included the
development of standards, methods, criteria and procedures for the design process; project scheduling;
preparation of design scopes for section engineers, and supervision and coordination of design teams. Our
services further included:
— Review of numerous studies, design plans, specifications and estimates prepared by section engineers
— Assistance and guidance to section engineers in resolving technical and environmental issues
— Preparing applications for numerous permits
— Participation in public hearings/meetings in support of permit applications
— Monitoring of environmental compliance
— Construction support
MISCELLANEOUS
ABILITY TO COMPLETE PROJECT ON TIME
We have the "full service"resources necessary to provide quality services within necessary schedule
requirements.The scheduling method we utilize on our projects includes preparing milestone summary
schedules that establish the major work task sequences, interrelationships, and critical milestones for the
project. These milestones are developed and approved with the client, and become the basis for all further
schedule development.
COST CONTROL AND SCHEDULING TECHNIQUES:
To control the costs of its services,we utilize a cost and schedule control system for all our projects. Our
computerized management information system(MIS) monitors cost on a project-by-project basis. The MIS
provides a biweekly breakdown of costs attributed to the project. This frequent reporting allows our project
managers to track project costs against schedule and helps preventing project overruns. Our system assists
project managers in identifying and rectifying discrepancies in a timely manner.The system also enables us
to maintain accurate information for client billing.
NNS I )
Historically, our cost and schedule control system has been extremely effective by minimizing design costs as
well as reducing time required to complete projects. Typically, Microsoft Project software is used to track
project performance schedules.
Our cost and schedule control system provides four major benefits to the project:
— It serves as the basis for decision making since there is a single, clearly defined scope of work and
schedule.
— It serves as the basis for reporting.Detailed reports are available for in-house review and the same data is
used for client reports.
— It provides a well-documented, clear record of performance.
— It establishes a base for corrective action evaluations, if required.
CADD CAPABILITY
Virtually all design drawings and exhibits prepared by the Honolulu office are done on CADD systems.The
Honolulu office is equipped with PC computer-aided design and drafting work stations utilizing both Bentley
(Microstation/Inroads) and Autodesk(AutoCAD/Civil 3D) design and drafting software and has personnel on
staff knowledgeable of both systems.Plotting is accomplished via OCE (a Canon Company) electrostatic and
Hewlett-Packard ink jet plotters.
COMMUNICATIONS
The Honolulu office is connected to WSP's Wide-Area Network(WAN) that electronically connects most of
the firm's offices in the U.S. The WAN allows the rapid exchange of documents, drawings, e-mail, and other
data. There are many benefits which can be gained, including expedited decision making, and reduced travel
time and expenses,but most importantly, it is a tool to provide improved services to our clients through
accessibility and efficient communication.
PROJECTSOLVE2(PS2)
One effective method of communicating project information is the use of ProjectSolve®, our proprietary web-
based project management software platform. PS2 has been implemented and successfully utilized by over
200 clients in the Transportation, Construction,Facilities Management,Telecommunications, Rail, FEMA, and
Program Management industries. It was developed in response to the growing demand for centralized
information management and decision support in the midst of today's decentralized project teams and
distributed production environments. Fast, efficient, user friendly, and easy to deploy,Websites developed
using PS2 allow each project team to consolidate and coordinate information and activities from anywhere in
the world using an Internet connection.We can customize PS2 for specific business practices, offering a
comprehensive array of implementation and support services.
QUALITY CONTROL PRACTICES/TECHNIQUES
We have attained ISO 9001 certification. This assures our clients that our quality system is in compliance with
the highest standards of the profession.We have standardized procedures for maintaining quality and
projects are audited internally for conformance with the procedures.
In addition, the firm maintains two vigorous programs to foster a commitment to quality in the professional
management and execution of projects:
— QA/QC: our project manager will prepare a project quality control plan specifically for each project.
NNS I )
— QIS:As part of our commitment to producing the highest quality work,the firm also implements a Quality
Improvement Systems (QIS),which is based on the principles of Total Quality Management(TQM).The
quality improvement initiative is a complement to, not a replace of, the existing QA/QC system.
The project manager has overall responsibility for implementing a comprehensive and appropriate QA/QC
program which forms the foundation of the quality control program. Our approach to controlling technical
quality and minimizing design errors can be summarized as follows:
— Assignment of appropriate technically qualified personnel to the project.
— Prompt communication of project requirements to the technical staff.
— Independent technical review of project deliverables by qualified senior staff prior to submittal to the
client.
— Frequent reviews and performance assessment by all levels of management.
We have developed our own Quality Manual and the Honolulu staff has received training in the application of
the quality process. Our staff recognizes the importance of adherence to the quality process that includes the
following:
— Preparation of a Project Quality Plan
— Checking and Backchecking Procedures
— Reviews by Project Manager
— Peer Reviews
— Constructibility Reviews
— Documentation
ERRORS AND OMISSIONS
Any time a design error is discovered or any other unforeseen condition arises during construction,we are
committed to assigning highest priority to addressing the issue at the earliest possible time. Our staff is
acutely aware of and recognizes that any construction issues, including design errors,requests for
clarification, or construction problems, must be resolved without delays so that the contractor may proceed
unimpeded. Our staff also recognizes that determining the causes of errors or problems are of secondary
importance and should be deferred until the issue is resolved.
" Si ) GERALD D. ANDRADE, PE, CISEC
Vice President, Civil Engineer
CAREER SUMMARY
Gerald Andrade is a project manager and civil engineer with experience in preparing
Act_ hydrologic analyses,hydraulic models,and scour analyses.His design experience
includes highway design,construction traffic control design,ADA curb ramp design,
traffic signal design,water distribution system design,retaining wall design and deep
foundation design as well as the preparation of plans,specifications,and estimates
(PS&Es).He is also experienced in construction management and inspection for various
project types including curb ramp projects,intersection improvement projects,
pavement reconstruction and rehabilitation projects,roadway widening projects and
bridge construction projects.
PROFESSIONAL EXPERIENCE
29 years with the firm
— Hana Highway Emergency Culvert Repairs at Waipio Stream(2021),Waipio,Maui:
29 years total project manager(PM)for the project which consists of the preparation of
environmental documentation under Governor Emergency Proclamation and
Professional qualifications design PS&E package development for the full replacement of a culvert crossing
Professional Engineer under Hana Highway at Milepost 3.Major elements of the project include
Hawaii(#70377),2007 development of a bypass road,temporary traffic control,and design of a precast
concrete box culvert to be constructed utilizing a cut-and-cover approach.
Certified Inspector
Sediment and Erosion — Interstate Route H-1 Safety Improvements Palailai Interchange to Waiawa
Control(CISEC),2070 Overpass,Ewa,Oahu(ongoing):project manager(PM)for the project which
consists of the preparation of environmental documentation and design PS&E
Education package development for the safety improvements along approximately 9 miles of
B.S.,Civil Engineering, Interstate Route H-1.Major elements of the project include shoulder resurfacing,
University of Hawaii, 7994 high friction surface treatments on ramps,rumble strips,striping and drainage
improvements.
Areas of prat*6-p
— Maui Storm Water Management Program,Maui,Hawaii(2019):project manager
Project Management responsible for the development of a Storm Water Management Program for HDOT
Environmental Permitting Maui District's Municipal Separate Storm Sewer System(MS4)permit.Program
elements include the development of a GIS-based Asset Management System,
Civil Engineering Public Involvement and Public Education and Outreach programs,Construction
Hydraulics/Hydrology Site Runoff Control program,Post Construction Storm Water Management
Program(Permanent Best Management Practices),Good Housekeeping Program
Best Management (Street Sweeping,Inlet Cleaning and Maintenance Facilities Management),and an
Practices Illicit Discharge Detection Program.
Geotechnical — Farrington Highway Intersection Improvements at Nanakuli Avenue and Haleakala
Construction Management Avenue,Oahu,Hawaii(on-going):project manager(PM)for the project which
consists of the preparation of an environmental assessment(EA),permitting and
Inspection PS&E package development for a 1 mile widening of Farrington Highway in
Geographic Information Nanakuli.Major elements of the project include utility relocations,sidewalk and
Systems/Asset traffic signal improvements and the relocation of a historic railroad alignment.
Management System — East Kapolei Rail Station Multimodal Access Improvements,Kapolei,Hawaii
(ongoing):deputy project manager responsible for the development of
environmental clearance coordination and design for multimodal access
improvements along Kualakai Parkway in support of the Honolulu Rail
Transportation Project.Major project elements include shared use path design,bus
stop design,street lighting,striping and utility relocation.
Vt ' ) VALENTIN (VAL) BUENO, PE
Assistant Vice President, Civil Engineer
CAREER SUMMARY
11110 Val Bueno is a civil engineer with experience in highway and roadway design,
hk
construction site runoff control,transit engineering,drainage,utility relocation,
r�.
Americans with Disabilities Act(ADA)accessibility design,individual wastewater
r-. systems(IWS)and wastewater treatment works(WTW)design,drafting and drafting
standards.Val's responsibilities include highway and roadway design of high-speed
highways and low speed roadways,performing spot checks of construction sites,
reviewing best management practice(BMP)plans and amendments to BMP plans and
reviewing storm water pollution prevention plans(SWPPP)for Hawaii Department of
Transportation(HDOT)construction projects.For transit,street,utility,accessibility,
and wastewater improvement projects,his duties included design and drafting
coordination with teams of engineers and technical personnel.Val's responsibilities
20 years with the firm have included project scheduling,client presentations,and preparing construction
documents,basis of design analysis reports and cost estimates.
31 years total
Professional qualifications PROFESSIONAL EXPERIENCE
Professional Engineer, — Honoapiilani Highway Improvements,Mile Post 10.5 to Milepost 18.0(on-going):
Hawaii(#72372),2006 Lead Civil Engineer responsible for civil design of the roadway alternatives,plan
and profile exhibits for the preparation of the EIS and the preparation of 30%plans
Education for RFP documents.
Graduate Certificate, — Kamehameha Highway Drainage and Safety Improvements,Vicinity of Laniakea
Public Health, 7995 Beach,MP 3.06 to MP 3.54(on-going):deputy project manager and lead civil
B.S.,Civil Engineering, 7993 engineer responsible for the design and coordination of a team of engineers and
sub-consultants working on the realignment of Kamehameha Highway.Duties
Areas of practice included design and drafting of construction documents,preparation of design
Environmental Permitting reports,agency review and coordination.
Civil Engineering — Miscellaneous Permanent Best Management Practices on Oahu,Hawaii(2019):
engineer responsible for the design of permanent BMPs along Interstate Route H-3,
Hydraulics/Hydrology/ Kaneohe Bay Drive and Kamehameha Highway;preparation of final contract
Wastewater documents;and contractor submittal coordination.
Best Management — Natural Energy Laboratory of Hawaii Authority,Airport Connector Roads and
Practices Other Roads for HOST Park,Island of Hawaii,Hawaii(2020):engineer responsible
Construction Mgmt. for roadway modelling and waterline design.
Inspection — Pohakuloa Training Area and Kilauea Military Camp Class IV Injection Well Study,
Island of Hawaii,Hawaii(2005):engineer responsible for collecting field data of
existing class IV injection wells(cesspools),conceptual design of IWS,cost
estimates and final study preparation.
— Farrington Highway Intersection Improvements at Nanakuli and Haleakala
Avenues,Oahu,Hawaii(on-going):Val was the civil engineer responsible for
coordination of the Farrington Highway Intersection Improvements including
QA/QC review,design and coordination of utility relocations,preparation of final
contract documents,and request for information(RFI)and Contractor submittal
coordination.
— EPA-Public Education and Training Program,Oahu,Hawaii(2021):inspector
responsible for coordinating site visits to assess the compliance of construction
BMP's for HDOT projects,reviewing SWPPPs for HDOT construction projects,and
also assisting in the development of annual BMP training material.
Vt ' ) DARIN N. CHINEN, PE
Senior Vice President, Civil Engineer
CAREER SUMMARY
Darin Chinen is a senior supervising civil engineer experienced in the design and
construction management of roadway projects.His project management duties include
supervising and executing all project work and coordinating the necessary resources
within WSP to deliver the project.He has also been involved with the management of
consultant design contracts and submittals.
,, PROFESSIONAL EXPERIENCE
4 �� W — Rehabilitation of Streets,Oahu,Hawaii(on-going):project manager responsible for
i �' i the execution of various program and project management services.Project scope
''J/ U m' _�' '� included planning and management of the City and County of Honolulu's
34 years with the firm rehabilitation of streets Capital Improvement Program(CIP).Program
management tasks included preparation of annual CIP budgets,programming of
34 years total new projects,tracking of program funds,and project management of individual
consultant and construction contracts.Project design scope includes preparation
Professional qualifications of final plans,specifications,and cost estimate(PS&E),and coordination of
Professional Engineer, permitting required for construction of various roadway projects on Oahu.
Hawaii(#7977), 7993 — Guardrail Improvements,FY 2014,Oahu,Hawaii(on-going):project manager
ducation responsible for the design of guardrail improvements at various locations.The
project includes development of standard guardrail and end treatment details,
M.B.A., University of guardrail designs,and traffic control plans.Project design scope includes
Phoenix,2005 preparation of final plans,specifications,and cost estimate(PS&E),and
B.S.,Civil Engineering, coordination of permitting required for project construction.
University of Washington, — Kapiolani Boulevard Reconstruction,Oahu,Hawaii(2015):project manager
7988 responsible for the design of this roadway reconstruction project.The project
Areas of pra included reconstruction of existing asphalt concrete pavement,installation of
rtirp
Portland cement concrete(PCC)pavement bus lanes,pavement markings design,
Project Management reconstruction of existing concrete curbs,concrete catch basin repair,and
Environmental Permitting streetlight and traffic signal systems.Project design scope included preparation of
final plans,specifications,and cost estimate(PS&E),and coordination of
Civil Engineering permitting required for project construction.
Construction Management — Waipio Point Access Road Improvements,Oahu,Hawaii(2016):project manager
Program Management responsible for the design of this roadway improvements project.The project
included reconstruction of existing roadway,new pedestrian and bikeway facility,
_ drainage and grading improvements,signing and striping,street lighting systems,
utility relocations,and permanent best management practices.Project design
scope includes preparation of final PS&E,drainage report and calculations,and
coordination of permitting required for project construction.
— Curb Ramps at Various Locations,Oahu,Hawaii(2009):project manager responsible for providing construction
management and inspection services for curb ramp construction projects at various locations on Oahu.Project scope
included construction engineering and management of subconsultant construction inspection services.Construction
engineering tasks included coordination and monitoring of contractor construction schedules,review of contractor
Requests for Information(RFIs),preparation of monthly progress payments,and coordination and preparation of
construction contract change orders for unforeseen site and field conditions.
— Peninsula at Hawaii Kai Off-Site Improvements,Oahu,Hawaii(2004):project manager responsible for the PS&E
preparation for off-site improvements and development interfaces with City and County of Honolulu roadway
facilities.Project scope included a new traffic signalized intersection with interconnect and modifications to the
adjacent signalized intersection,ADA improvements,and striping modifications.
" Si ) EUGENIO DELA CRUZ
Senior Consultant, Civil Engineer
CAREER SUMMARY
Eugenio dela Cruz is a Civil Engineer in the Honolulu office with experience in roadway
design,site grading,curb ramp design,signing and striping,hydrology and hydraulics,
traffic signals and the preparation of plans,specifications,and estimates(PS&E).
PROFESSIONAL EXPERIENCE
I 40
- Natural Energy Laboratory of Hawaii Authority(NELHA)Airport Connector Roads,
Kailua-Kona,Hawaii:civil task lead responsible for designing the connector road
that connects NELHA to the Kona International Airport as well as provide access
between Queen Kaahumanu Highway and the other roads within NELHA's
property.Use of Civil 3D to design two lane roadway with side swales and crossing
Years with the firm culverts for site drainage.
23 — Oceanic Institute Feeds Research and Pilot Production Facility,Kailua-Kona,
Hawaii:civil designer responsible for grading project site using Civil 3D;providing
Years total ADA compliant parking lot and stalls;preparation of plans for site cross sections
37 and signing and striping plans for parking lot,and details for pavement roadway
construction.
Education
— Kaumualii Highway Pavement Preventative Maintenance,Kauai,Hawaii:assistant
A.S., Drafting Technology, civil designer responsible for prioritizing and assessing pavement damage on
Honolulu Community nearly 26 miles of road and mapping and cataloging of pavement damage with the
College, 7999 use of GPS.
Areas of prartif-p — Interstate Route H-1 Resurfacing from Middle Street to Vicinity of Ward Avenue,
Honolulu,Hawaii:assistant civil designer responsible for signing and striping
Civil-Highways plans;spot elevation plans on portion of the highway reconstruction and traffic
Hydraulics/Hydrology/ control plans with full closure of the Interstate.
Wastewater — Middle Street Reconstruction,Honolulu,Hawaii:assistant civil designer
Traffic/Transportation responsible for curb ramp and sidewalk reconstruction that is ADA compliant and
production of traffic control plan sheets.
Languages
— Lumahai Retaining Wall,Kauai,Hawaii:assistant civil designer responsible for spot
English elevations on reconstructed roadway pavement;striping plan with use of non-
traditional pavement markings for enhanced safety and production of grading and
traffic control plans.
— Traffic Control Signal,Phase XI,Honolulu,Hawaii:assistant civil designer
responsible for traffic signal design rehabilitation on various locations in Oahu and
production of all plan sheets.
— Traffic Signals,Phase 15,Honolulu,Hawaii:assistant civil designer responsible for
traffic signal design for various locations on Oahu;curb ramp and sidewalk
reconstruction compliant to ADA standards and plan and profile sheets production
of new traffic signal conduits.
— Ala Moana Trunk Sewer Rehabilitation,Honolulu,Hawaii:assistant civil designer
responsible for production of plan and profile sheets of rehabilitation of existing
major sewer line running under Ala Moana Boulevard;production of sewer,
pavement reconstruction and miscellaneous details sheets and traffic control
plans.
%% Si I ) PAUL N. FUJII, PE
Assistant Vice President, Civil Engineer
CAREER SUMMARY
Paul Fujii,a civil engineer with more than 35 years of experience,has been heavily
involved in design projects for WSP.His project work includes assisting in the
i preparation of numerous project plans,specifications,and estimates(PS&E)for the City
and County of Honolulu Storm Water Quality Division(DFM-SWO),Board of Water
Supply(BWS),Honolulu Authority for Rapid Transportation(HART);State of Hawaii
Department of Transportation(HDOT);and other clients.
"'"/
EXPERIENCE
— NPDES Storm Water Monitoring Project,various locations on Oahu,Hawaii
\,1 JAI' (current):lead civil designer for city's storm water quality monitoring stations.
35 years with the firm Paul is responsible for designing and permitting of automated water quality
monitoring stations(15)for streams and outfalls;and stand-alone telemetered
35 years total weather stations(7).Paul is assisting in the development of a Palolo watershed
mitigation program involving right-of-entry negotiations and establishment of
Professional qualifications partnerships with private landowners.
Professional Engineer, — Barbers Point 215 Water System Improvements,Ewa,Oahu,Hawaii(current):
Hawaii(#8267), 7994 project manager/lead civil designer for City's Barbers Point 215 WSI project.Paul is
Education preparing plans for potable water reservoir waterline and drainline improvements.
Paul coordinates with landowner's representatives,client,and subconsultants to
B.S.,Civil Engineering, 7988 meet project requirements.
B.S.,Mechanical — Honolulu Rapid Transit Project(HRTP),Honolulu,Hawaii(2014):drainage task
Engineering, 7983 leader for the HART's twenty-mile overhead transit system from East Kapolei to
Ala Moana Center.Paul was responsible for the guideway drainage,roadway
Areas of practice
drainage,and station drainage for the twenty-mile project.Paul prepared the
Project Management drainage criteria and wrote the permanent best management practice(BMP)
Environmental Permitting planning concept report,which the transit drainage BMP designs are based upon.
Paul reviewed contractor/designer submittals;and coordinated various drainage-
Civil Engineering related issues amongst the various transit contracts(WOFH,KHG,MSF,Airport
Hydraulics/Hydrology Guideway,City Center Guideway,WOSG,KHSG,and ASG).
Best Management — Storm Water Management Program,various locations within the State of Hawaii
Practices (2008):design team program maintenance scheduler/task leader for erosion
control BMP program/civil designer for HDOT Highway Division's storm water
Program Management management program,which included the development of an asset management
system for all of the Highway Division's facilities within the state;and BMP
development and monitoring.
— Barbers Point 215 Water System Improvements,Ewa,Oahu,Hawaii(on-going):
project manager/designer for the Barbers Point 215 WSI project.Paul is preparing
conceptual plans for reservoir waterline and drainline improvements.Paul
coordinates with client,and subconsultants to meet project requirements.
— Nimitz Highway 16-inch Water Main,Honolulu,Hawaii(2016):deputy project
manager/designer for the Nimitz Highway 16-inch water main(Waikamilo to
Sumner)project.Paul prepared the preliminary plans for the mile-long water main
replacement project along one of Honolulu's most congested roadways.Paul also
prepared the trenchless alternative design report,which provided an alternative
design incorporating trenchless technology.
NN N I ) ALLEN KAM
Vice President, Environmental Planner
CAREER SUMMARY
Allen Kam is an environmental planner with experience in management of special
projects,and an attorney experienced in land use laws,zoning regulations,and the
regulatory frameworks at the County,State,and Federal levels.He is well-versed in a
wide range of disciplines with a skillset that includes master planning,plan
implementation,financial pro formas,community outreach,government relations,and
property management.
Prior to joining WSP in 2023,Allen was the Planning Department Head at a Hawaii
consulting firm,where he led a growing team of environmental professionals and
coordinated efforts to expand the firm's services to meet the requirements of new and
developing markets.
<1 Year with the firm PROFESSIONAL EXPERIENCE
30 years total — Planning Department Head,Belt Collins Hawaii/B+K Consulting,Honolulu,Hawaii:
Strategized project approaches to obtain land use approvals and entitlements,
Education prepare community plans,and coordinated public engagement.Prepared and
Juris Doctorate presented projects to clients,project executive teams,and the public.Prepared and
Rutgers Schools of Law, processed environmental reviews at the National Environmental Policy Act(NEPA)
Newark,NJ, 7999 and Hawaii State(Hawaii Revised Statutes[HRS]343)level,as well as land use and
zoning permits.Prepared master plans and community update plans,including
B.S.,Environmental Design, strategizing the public engagement process.Coordinated and managed a team of
University of subconsultants to fulfill project needs in multiple capacities.
Massachusetts,
Amherst,MI, 7994 — Commercial Property Manager,State of Hawaii Office of Hawaiian Affairs,
Honolulu,Hawaii:Established a new Commercial Property department for the
Professional Certificate in Office of Hawaiian Affairs(OHA).Created a development strategy for
Real Estate approximately thirty acres of waterfront property in Kakaako Makai.Oversaw and
New York University, supervised master planning efforts and community outreach efforts for the
New York, NY,2005 Kakaako Makai Master Plan.Managed and supervised internal staff as well as teams
areas of practice of consultants that included professionals with a variety of focus and levels of
involvement.
Program Management
— Associate,Booz Allen Hamilton,Honolulu,Hawaii:Embedded consultant in Marine
Project Management Forces Pacific,Defense Policy Review Initiative-Environmental Department.
Master Planning Assisted in the overall strategy and preparation of the Commonwealth of the
Northern Mariana Islands(CNMI)Joint Military Training(CJMT)NEPA
Strategic Planning Environmental Impact Statement(EIS).Coordinated NEPA EIS contract tasks with
Natural Resource/ Naval Facilities Pacific,supervised staff and external consultants.Acted as Interim
Environmental Planning Environmental Team Lead,briefing unit commander,Marine Forces Pacific
(MARFORPAC)Executive Director and Headquarters,and U.S.Marine Corps
Environmental Permitting (HQMC)staff on project updates.
Community Outreach/ — Undersea Cable Permitting Specialist,State of Hawaii Department of Department of
Education Business,Economic Development&Tourism,Honolulu,Hawaii:Oversaw the
preparation of the Hawaii Interisland Renewable Energy Program EIS.In
conjunction with the state of Hawaii Office of Environmental Quality Control,
developed a strategy to complete a legally-defensible programmatic EIS,despite
significant ambiguous components,that satisfied the requirements of both HRS
Chapter 343 and NEPA.Established and maintained relationships with various
other Federal and State agencies,and in particular with the U.S.Department of
Energy and U.S.Fish&Wildlife Services,negotiating roles for such agencies in the
project to help mitigate the State of Hawaii's risk.Established budget for EIS and
planning efforts.
Vt N I ) LARA KARAMATSU, PE
Lead Consultant, Civil Engineer
CAREER SUMMARY
Lara Karamatsu is a civil engineer experienced in highway engineering,drainage and
right of way.Lara's responsibilities include creation of contract plans,project schedules
and estimates.She has also helped with developing drainage calculations and plans.
Lara has also been serving as a certified internal auditor for the past eight years.
PROFESSIONAL EXPERIENCE
— NPDES MS4 TMDL Structural BMP Improvements Program,Honolulu,Hawaii(On-
going):Lara is currently working to identify potential locations for structural BMP
improvements to assist the City in meeting its TMDL reduction goals for sediment
and nutrients.Her responsibilities include desktop analysis(GIS),structural BMP
15 years with the firm research,product applicability and efficiency assessment,field reconnaissance,
coordination with stakeholders,and reporting requirements.Ultimately,the BMP
19 years total projects selected for implementation will be developed into PS&Es for
construction.
Professional qualifications
— Ka Makana Alii Development,Honolulu,Hawaii(2016):Lara was the primary
Professional Engineer designer on two of three off-site improvement projects for a 67-acre shopping
Hawaii(#75390),2073 center development.She was responsible for the drainage and roadway design of a
Professional Engineer new signalized intersection and a modification to an existing intersection,
Washington(#44238), providing access into the site.She was in charge of developing the plans,estimate,
2007 specs and reports and coordinating with other disciplines.
Education — Rehabilitation of Streets,Various Locations,Honolulu,Hawaii(2016):Lara was
working on City and County of Honolulu street rehabilitation projects.Her
B.S.,Civil Engineering, responsibilities included conducting field work to build the street improvements
University of Portland, inventory,creating striping plans and back checking estimates for several projects.
2003
— Honolulu Rail Transit Project(HRTP),Honolulu,Hawaii(2014):Lara was one of the
Areas of practice GEC civil engineering group designers on the 20-mile HRTP.
Permitting — During the Environmental Impact Statement(EIS)Phase of the project Lara
helped develop the plans for the alignment and right-of-way impacts along the
Civil-Highways alignment.She worked with various subconsultants to determine the right-of-
Hydraulics/Hydrology way impacts along the 20-mile corridor,produced numerous quantities and
exhibits for environmental documents,evaluated possible staging areas,and
Best Management helped complete track alignment speed calculations.
Practices — During the Preliminary Engineering(PE)Phase of the project Lara was
Program Management involved with various aspects of the project.Lara designed the new alignment
and profile for two access roads leading up to one of the transit stations.She
Geographic Information looked at different alternatives for the profile of the access road as it impacted
System/AMS other road alignments within the area.Lara calculated the quantities and
constantly coordinated with the engineers working on an adjacent contract
that would tie into the alignment.After reviewing all options,Lara produced a
matrix comparing the cut/fill and other determining factors between the
different alternatives and presented it to project managers and an alternative
was chosen.Lara then produced the plan and profile drawings and estimate
for the Preliminary Engineering package.
— Lara also reevaluated property impacts previously outlined in the EIS phase
and determined if the PE design kept within the limits of impact.She also
developed PE plan sheets showing the existing right-of-way lines and
proposed impacts due to the project.
Vt ' ) ROBIN A. KASAMOTO, PE
Lead Consultant, Civil Engineer
CAREER SUMMARY
Robin is a civil engineer with experience in general civil design,as well as preparing
sot hydrologic analyses,hydraulic models,scour analyses,and traffic analyses.Design
experience includes highway design,traffic signal design,ADA curb ramp design,storm
water runoff distribution design,as well as the preparation of plans,specifications,and
estimates(PS&E).
. , y "'>, PROFESSIONAL EXPERIENCE
F ' i '°' — Honolulu High-Capacity Transit Corridor,Oahu,Hawaii:civil engineer responsible
/ for providing general engineering support for the design and construction of an
=' 4i•
elevated rail transit system traversing the Honolulu primary transportation
corridor.Tasks included preparation of traffic control plans for the archaeological
22 Years with the firm inventory survey(AIS)associated with the project;review and revision of contract
standard and directive plans;preparation of plans associated with change orders
25 Years total and request for information(RFI)responses;and review of roadway and guideway
Professional qualifications drainage reports submitted by contractors.
Professional Engineer, — Rehabilitation of Streets,Oahu,Hawaii:
Hawaii(72366-C),2007 — Moanalua Road and Kaahumanu Street:civil engineer responsible for the
preparation of the final PS&E package for roadway maintenance/repair design
Education of Moanalua Road and Kaahumanu Street.The project includes
B.S.,Civil Engineering, repaving/reconstruction of asphalt concrete pavements,pavement marking
University of Hawaii, 7996 and vehicle loop detector installation,concrete bus pad installation,utility
manhole adjustments,and reconstruction of existing concrete curbs and/or
areas of pracL,ce gutters.
Environmental Permitting — St.Louis Heights:civil engineer responsible for the preparation of final PS&E
package for roadway improvements on St.Louis Heights.The project consists
Civil-Highways of driveway reconstructions and roadway repaving/reconstruction of portions
of various streets on St.Louis Heights.
Hydraulics/Hydrology/ — Aiea Heights Drive and Kaneohe Bay Drive:civil engineer responsible for the
Wastewater preparation of final PS&E package for roadway improvements on Aiea Heights
Construction Management Drive and Kaneohe Bay Drive.The projects consist of a roadway
repaving/reconstruction and guardrail installation project on Aiea Heights
Inspection Drive and Kaneohe Bay Drive.Also responsible for compilation of National
Geographic Inf.System/ Pollutant Discharge Elimination System(NPDES)permit applications.
AMS — Various Locations:civil engineer for this project for the City and County of
Honolulu,which consisted of the inspection,and repair and maintenance
design of various streets located around the island of Oahu.Compiled NPDES
permit applications for multiple contracts.Participated in field inspection for
some of the streets included in the project.Assisted in the development of
plans for the repaving and re-striping of various locations.Also responsible for
post-construction design in various areas,including the design for
reconstruction of driveways on St.Louis Heights.
— Fort Barrette Roadway Improvements,Oahu,Hawaii:civil engineer responsible for
the conceptual design and final PS&E package for a roadway widening project in
leeward Oahu.Project is a 1.2-mile widening project with associated drainage and
utility improvements.
— Pedestrian Facilities and ADA Compliance,Island of Hawaii:civil engineer
responsible for design of curb ramps traffic signals,and other pedestrian facility
improvements along selected State of Hawaii highways on the island of Hawaii.
Responsibilities also included preparation of Technical Infeasibility Statements and
design review of selected locations included in the project.
Vt ' ) ANTTI KOSKELO, CPSWQ
Lead Consultant, Environmental Scientist
CAREER SUMMARY
7 Years with the firm Antti Koskelo is an environmental scientist experienced in the study of various aspects
of the natural environment,especially water resources.He specializes in stormwater
runoff water quality monitoring,Total Maximum Daily Loads,pollutant load modeling,
16 Years total desktop analysis(GIS),Best Management Practices,rain and flow monitoring,research,
data analysis/statistics,and scientific writing.
Educatic+M
MS.,Environmental PROFESSIONAL EXPERIENCE
Sciences, University of
Maryland,2008 — City and County of Honolulu,Department of Facility Maintenance,Stormwater
Quality Branch,TMDL EMC Monitoring,Honolulu,Hawaii(On-going):Antti is
B.A.,Environmental currently engaged in a multi-year study of stormwater quality at various MS4 end-
Sciences,Lehigh University, of-pipe and stream locations throughout Oahu to assist the City in meetings its
2007 NPDES/TMDL requirements.His responsibilities include collecting water quality
Professional qualifications samples during storm events with automated samplers,installation and
maintenance of monitoring equipment,staff management and supervision,
Certified Professional in desktop analysis(GIS),coordination with client/stakeholders,data analysis and
Stormwater Quality statistics,research,and technical writing.
A re. •Yf practice — NCHRP Transportation Research Board,National Academies of Science,State
Departments of Transportation Stormwater Monitoring Program Goals,Objectives,
Stormwater Quality and Protocols.Antti was a senior author on a nation-wide research study and
Monitoring report that provided guidance to all State Departments of Transportation on how
TMDLs to design and implement an effective stormwater monitoring program.Study was
published by the Transportation Research Board of the National Academy of
Pollutant Load Modeling Sciences.
Best Mgmt. Practices Previous Experience
Geographic Inf.System Before joining WSP,Antti's project experience with other consulting firms included:
Scientific Research — Clarksburg Special Protection Area(SPA)WQ Monitoring Projects,Montgomery
Data Analysis and County,MD:Antti served as a project manager/environmental scientist
Statistics responsible for five water quality monitoring projects in the Clarksburg,MD SPA.
Tasks included collecting stormwater samples at various sediment ponds and post-
construction BMPs using automated samplers;and monitoring of groundwater,
surface water,and stream geomorphology within the SPA.Managed staff for field
monitoring and sampling,hired and supervised interns,coordinated with
clients/regulators,tracked budgets,performed quality control reviews on
monitoring data,prepared field equipment,conducted data analysis and statistics,
and wrote reports.
— Anne Arundel County Department of Public Works,TMDL Implementation Plan for
Bacteria,Anne Arundel County,MD:environmental scientist responsible for
writing Bacteria TMDL Implementation Plan for 19 watersheds in Anne Arundel
County,MD.Conducted literature review,modeled bacteria loads using Watershed
Treatment Model(WTM),and analyzed cost-benefit of various structural and non-
structural load reduction strategies to help the County meet their TMDL
stormwater wasteload allocations.
NN N ) PHILLIP (PHIL) MATSUNAGA, PE
Lead Consultant, Transportation Engineer
CAREER SUMMARY
Phil Matsunaga is a transportation engineer with experience in traffic data collection
and in evaluation of traffic data to develop recommendations regarding intersection
geometry and traffic control.He also has experience writing traffic evaluations,TMPs,
dealing directly with government agencies,and presenting at public meetings.
Phil is experienced in utilizing software such as the Highway Capacity Software(HCS),
along with Synchro,SimTraffic,and SIDRA to evaluate traffic operations for signalized
and unsignalized intersections.
PROFESSIONAL EXPERIENCE
— Kamehameha Highway Realignment in the Vicinity of Laniakea Beach,Haleiwa,
19 years with the firm Hawaii(on-going):conducted traffic data collection,performed traffic analysis for
19 years total future traffic for short and long-term solutions,wrote short-term and long-term
memos.
Professional qualifications — West Waikiki Study,Honolulu,Hawaii(2015):traffic engineer for the project that
Professional Engineer, examined safety and traffic operations at five Waikiki intersections.
Hawaii(73005),2008 Microsimulation incorporating vehicle and pedestrian data was performed for
Kalakaua Avenue intersections from Saratoga Road to Royal Hawaiian Avenue.New
Education pedestrian-only phases were recommended at the Lewers and Royal Hawaiian
B.S.,Engineering, University intersections which reduced vehicle-pedestrian conflicts while reducing delay and
of Pennsylvania,2003 queuing on Kalakaua Avenue..
t.rraa of practic_ — Queen Kaahumanu Highway Re-Evaluation,Kailua-Kona,Hawaii(2014):organized
traffic data collection,conducted traffic analysis for future background traffic
Project Management including future developments,trip generation and distribution,made roadway
Transportation Planning and intersection improvement recommendations.
Traffic/Transportation
— East Kapolei Commercial,Kapolei,Hawaii(2010):coordinated traffic data collection
and summarization as part of a study to identify roadway improvements to
accommodate future traffic demand of a proposed shopping center.Performed
intersection level of service analysis within the study area using Synchro and
SimTraffic.Produced future background traffic and performed trip generation and
distribution.Wrote report including recommendations.
— Nani Kailua Road Extension(Oneo Lane EA),Kailua-Kona,Hawaii(On-going):traffic
engineer responsible for studying the impact of a new mauka-makai connector
roadway between Kuakini Highway and Alii Drive,two high-volume but different
character roadways in Kailua-Kona.Traffic control alternatives such as traffic
signals and roundabouts are being considered.
— Maui Research and Technology Park,Kihei,Maui,Hawaii(On-going):coordinated
data collection and summarization as part of a study to identify roadway
improvements to accommodate future traffic demand of a proposed mixed-use
development.Performed intersection level of service analysis within the study
area using Synchro and SimTraffic.Produced future background traffic and
performed trip generation and distribution.Wrote report including
recommendations.Attended community and agency meetings as a representative
of WSP.
— Farrington Highway Intersection Improvements,Leeward Coast,Hawaii(On-
going):conducted Pedestrian Safety Study,collecting and analyzing pedestrian
data to recommend adding,removing,or modifying existing unsignalized
crosswalks.Analyzed the modification or removal of existing bus stops.
Vt ' ) MALIE J. A. MCCLELLAN
Lead Consultant, Environmental Planner
CAREER SUMMARY
Malie McClellan is an environmental planner and has worked in transportation and
development planning as well as environmental consulting for government and private
clients.Her largest role to date was acting as the permitting lead for WSP on the$6.7
billion Honolulu Rail Transit Project.She was responsible for the drafting of at least 30
different permits for this project alone.Other responsibilities have included
compliance activities;facilitating public involvement and community outreach;
document compilation;and administrative activities such as scheduling.Malie has
experience performing data collection and research;writing and editing environmental
documents and permit applications;conducting geographic information systems(GIS)
mapping and analysis;developing and working with AutoCAD drawings;producing
graphics and materials for presentation at meetings;and coordinating with agencies,
15 years with the firm organizations,and individuals with various interests.
19 years total PROFESSIONAL EXPERIENCE
Education — Oahu Railway and Land Company,General Environmental Engineering Services,
B.S.,Natural Resources and Statewide;Integrity Assessment,Historic Context Report,and Programmatic
Environmental Management, Agreement,Oahu,Hawaii(2020):environmental planner to the process of
University of Hawaii,2007 developing a comprehensive approach to evaluating federal and state
undertakings regarding this railroad and associated right-of-way;a portion of the
Areas of practice resource is listed on the National Register of Historic Places and other portions are
Environmental Planning considered as eligible to be listed.Malie has been highly involved in the field work
for the integrity assessment portion of this project,walking the entire railway
Environmental Permitting right-of-way,taking pictures,and providing support to other field team members.
Community She was instrumental in drafting the Work Plan,which outlined the approach to
Outreach/Education developing the Programmatic Agreement.
Program Management — Lydgate Bike/Pedestrian Path-Phase D and Portion of Phase C,Kapaa,Kauai,
Hawaii(2017):as an environmental planner,Malie worked to draft various permits.
Geographic Information She worked to provide a CZM Consistency application,a SMA permit application,
System/AMS and also a Shoreline Setback Variance permit application for a shared use path that
would provide a much-needed connection between existing facilities.
— Honolulu High-Capacity Transit Corridor Project,Kapolei to Honolulu,Oahu,
Hawaii(2011):environmental planner to the EIS phase of the 20-mile(32-
kilometer)corridor between east Kapolei and Ala Moana.The EIS was prepared per
the Federal Transit Administration(FTA)New Starts policy.The project goals
included determining and minimizing community and environmental impacts and
coordinating with other planning efforts throughout the corridor.Her initial
duties included field data collection and geographic information systems(GIS)
imagery and analysis.Malie volunteered numerous times to attend public meetings
as a project representative,wrote and edited sections of the EIS,and offered
support to various efforts,including agency coordination and permit preparation.
— Earthquake Disaster Response and Project Delivery Program,Various Locations,
Hawaii Island,Hawaii(2011):permit compliance manager for permanent roadway
repairs related to earthquake damage.Malie managed permit preparation and
submittal as well as agency coordination efforts as appropriate for three individual
project units.Permits and clearances included in the effort were Section 404 DA,
Section 402 NDPES,Section 7,Section 106,and CZM.
" Si ) TODD NISHIOKA, PE
Vice President, Civil Engineer
CAREER SUMMARY
Todd Nishioka is a civil engineer with more than 25 years of experience in federal-aid
transportation projects with responsibilities including project management,design,
environmental permitting and compliance,conducting public involvement activities,
and contract administration.In the area of project management,his experience
includes evaluating consultant proposals and billings;managing design consultants;
preparing plans,specifications,and estimates(PS&E);project scheduling;review of
contractor's request for information(RFI)and shop drawings submittals.
4 PROFESSIONAL EXPERIENCE
— Environmental Permitting Assistance,Honolulu,Hawaii(2021):deputy project
8 years with the firm manager for the City and County of Honolulu Department of Design and
Construction Environmental Permitting Project.His duties include developing the
26 years total City and County of Honolulu,Department of Design and Construction's(DDC)
Specification Policy and Procedures,developing DDC environmental program
Professional qualifications including but not limited to environmental templates,training DDC staff on
Professional Engineer, environmental regulations,training DDC staff on how to identify and navigate
Hawaii(#9490), 7998 environmental requirements for their projects,assisting DDC staff on developing
schedules etc.His other duties will include developing a staff study to determine
Education the new environmental structure within DDC.
B.S.,Civil Engineering,
University of Hawaii, 7993 PREVIOUS PROFESSIONAL EXPERIENCE
Prior to rejoining the firm in late 2016,Todd worked for the State of Hawaii,
141raa of practic.. Department of Transportation,Highways Division for nearly 20 years.His project
Project Management experience included in-house design,consultant management,development of the
Statewide Storm Water Management Program,and the development of the HDOT
Environmental Planning Highways Environmental Program.
Environmental Permitting — Assisted in the development of HDOT's Environmental Permitting and Compliance
Community Outreach/ Section.This effort consisted of developing the Section's functional description,
Education position descriptions and hiring of the employees within this Section.He played a
lead role in the development of the policy and procedures of HDOT's
Civil Engineering environmental program.He had oversight over the development of Section 106 of
Best Management the National Historic Preservation Act,Section 7 of the Endangered Species Act,
Practices the National Environmental Policy Act,Hawaii Revised Statutes 343 Environmental
Impact Statement guidelines.His Section served to provide environmental
Program Management guidance and direction to the Highways Division and the County Federal Aid
Program.His section also served as the primary environmental clearing house for
emergency related projects.
— Assisted in the development of the Storm Water Management Program Plan.From
2005 until 2016,he served to develop and manage the Permanent Best
Management Practices(PBMPs)program.He worked with consultants in providing
guidance and direction on which PBMPs were most appropriate for the project and
the life cycle analysis for the program.
— Assisted as the Highways liaison with other regulatory agencies such as the
Department of Health,Clean Water Branch(DOH),the United State Army Corps of
Engineers,the Office of Planning,the Department of Land and Natural Resources
(DLNR)etc.In this capacity,he developed MOUs with various agencies such as DOH
and DLNR to streamline interagency environmental processes.
NN N ) NAMIOHTOMO
Assistant Vice President, Environmental Planner
CAREER SUMMARY
Nami Ohtomo is an environmental planner with experience in defense,transportation
(maritime,highways,transit,and multimodal),and renewable energy projects.She is
well-versed in a wide range of disciplines,including environmental planning,facilities
planning,operational planning,and communications and public relations.Nami has
experience in natural resource management and environmental planning,including
preparation and review of a number of environmental compliance documents.Her
strength is in coordinating and managing complex environmental regulatory
compliance efforts,providing client support,and strategizing for effective use of
' ' project team resources and technically sound project analysis,support,and delivery.
'' She was instrumental in developing WSP Honolulu's in-house geographic information
systems(GIS)capability.
11 years with the firm
PROFESSIONAL EXPERIENCE
30 years total
— HNL Biometric Facial Recognition project,Honolulu,Hawaii(on-going):
'duration environmental planner for a project to design,deploy,and provide CM support
services for a facial recognition system at international departure gates in the
M.P.P., Public Policy, Daniel K.Inouye International Airport,to enhance customer experience and
University of Michigan,Ann operational efficiency.Prepared federal Categorical Exclusion(CatEx)
Arbor, 7998 documentation pursuant to the National Environmental Policy Act(NEPA).
M.S.,Natural Resources& — Interstate Route H-1 and H-201 Destination Sign Upgrade/Replacement,Phase 3,
Environment, University of Honolulu,Hawaii(on-going):planner responsible for submitting various permit
Michigan,Ann Arbor, 7997 applications,including community noise permit and noise variance applications,
A.B.,East Asian Languages Endangered Species Act(ESA)Section 7 and Hawaii Revised Statutes(HRS)Chapter
&Civilizations, Harvard 195d reviews,Hawaii Environmental Policy Act(HEPA)HRS Chapter 343
University, 7997 Exemption,NEPA CatEx,and other federal requirements for a highway signs
replacement project.
..,�of practices
— Kauai Emergency Flood Repairs and Cleanup at Various Locations April 2018,Kauai,
Program Management Hawaii(on-going):Prepared U.S.Army Corps of Engineers permit applications on
Project Management emergency federal assistance projects at various locations to repair roadway
connectivity disrupted by heavy rainfall,for Hawaii Department of Transportation.
Strategic Planning
— Wahiawa Pedestrian Bridge Environmental Assessment,Wahiawa,Hawaii(2020):
Natural Resource/ QA/QC and technical reviewer for the development of an Environmental
Environmental Planning Assessment(EA)to consider the construction of a path to create a new non-
Environmental Permitting motorized direct access between two communities,including a bridge over a
stream.Reviewed all aspects of draft EA,including required agency coordination
Facilities Planning/ and technical sufficiency of analysis.
Maritime Ports Planning
— Kauai Bridge Rehabilitation projects,Hawaii(on-going):project manager
Community Outreach/ responsible for obtaining environmental permit clearances for three County of
Education Kauai bridge rehabilitation projects:Hanapepe Bridge,Koloa Bridge,and Kipu
Geographic Information Bridge.The most complex of these is the federally-funded Hanapepe Bridge
Systems/Asset Rehabilitation,requiring U.S.Army Corps of Engineers(USACE)and U.S.Coast
Management System Guard(USCG)Section 404 and Section 10,State Historic Preservation Officer
(SHPO)on National Historic Preservation Act(NHPA)Section 106;HRS Chapter 6E-
- 8;U.S.Fish and Wildlife Service(Endangered Species Act[ESA]Section 7);state
Department of Land and Natural Resources on biological resources(HRS Chapter
195d),and preparation of a National Environmental Policy Act(NEPA)Categorical
Exclusion(CatEx),and HRS Chapter 343 Exemption clearances.
" Si ) JAN REICHELDERFER, CPG
Assistant Vice President, Environmental Planner
CAREER SUMMARY
Jan Reichelderfer is an environmental planner and is responsible for permitting and
physical environmental issues.Jan has extensive experience in permitting and
environmental compliance.She has obtained permits such as Section 401 Water Quality
Certifications,National Pollutant Discharge Elimination System(NPDES)Permits,
m" Coastal Zone Management Consistency Determinations,Stream Channel Alteration
Permits,and Army Corps of Engineers Permits for a variety of projects to improve
l,m infrastructure.Jan is often responsible for permitting requirements and conditions,the
inspection of best management processes(BMPs)and water quality monitoring.She
has written numerous reports for Safe Drinking Water Act's Sole Source Aquifer
program.She is also involved with the production of environmental impact statement
(EIS)and environmental assessment(EA)documents for transit projects,harbor
31 years with the firm development,and roadway improvements.
38 years total PROFESSIONAL EXPERIENCE
Education — NPDES Storm Water Monitoring and TMDL,Oahu,Hawaii(On-going):planner
Professional Certificate, involved in the production of implementation and monitoring plans and water
Environmental Planning, quality monitoring and maintenance to meet permit requirements.
University of Hawaii, 7995 — Statewide Noxious Invasive Pest Program,Maui,Hawaii(On-going):project
MS, Geology, University of manager responsible to provide all environmental clearances to remove invasive
Illinois, 7985 species and plant native species along a portion of Haleakala Highway
BS,Geology, University of — Fort Weaver Road Widening Design/Build Project,Oahu,Hawaii(2010):Jan was
Delaware, 7982 responsible for obtaining all the necessary environmental permits for this design-
build project.
Professional qualifications
— NPDES Municipal Separate Storm Sewer System(MS4)Permit,Maui,Hawaii(2019):
Certified Professional Jan was involved in the implementation of maintenance and permanent BMPs
Geologist(8750),American requirements for the highway system in Kahului and Kahului Harbor.
Institute of Professional
Geologists — Guam Islandwide Program Management Services,Guam(On-going):involved in
permitting for bridge replacements.
Envision Sustainability
Professional — Kamehameha Highway Realignment,Vicinity of Laniakea Beach.Oahu,Hawaii(On-
going):environmental lead for an EA realigning the roadway threatened by
Areas of practice erosion.The project incorporates significant community involvement and
Environmental Permitting outreach.
Community Outreach/
— NELHA Airport Connector Roads and Other Roads in HOST Park,Kailua-Kona,
Education Hawaii(2019):planner involved in producing an EA for proposed roadway
connections on the island of Hawaii.
Program Management
— Honolulu High-Capacity Transit Corridor Project(HHCTCP)/Honolulu Rail Transit
Project(HRTP),Oahu,Hawaii(Fed-Aid)(2014):as an environmental planner for the
project,Jan wrote and coordinated natural science sections of the Alternatives
Analysis(AA)and the EIS.She participated in numerous public outreach programs
and worked on the project's compliance with the EIS and the Record of Decision
(ROD)mitigation commitments along with obtaining and tracking the numerous
permits needed for project construction.
— North South Road,Phase 1,Oahu,Hawaii(2004):Jan wrote and coordinated
numerous sections of the EA for the new road,especially those involving
groundwater and hazardous waste for the preparation of the joint federal and State
EA of this proposed roadway in the Ewa District of Oahu.
Vt ' ) JOSEPH R. SALVADOR, PE
Assistant Vice President, Civil Engineer
CAREER SUMMARY
Joseph Salvador is a civil engineer with experience in general civil design.His design
experience includes roadways,drainage,including hydrologic analyses and hydraulic
modeling,traffic control,Americans with Disabilities Act(ADA)curb ramps,and storm
water runoff distribution.Joseph is also experienced in the preparation of plans,
specifications,and estimates 41Nv PROFESSIONAL EXPERIENCE
lJ; — Honoapiilani Highway Shoreline Protection for Tsunami Damage in Ukumehame,
,,+� , (f Maui,Hawaii:engineer responsible for design and preparation of construction
i '011A plans for this emergency project for sea revetment and roadway reconstruction.
- 0 h Job duties included roadway/alignment design;signing and pavement marking
17 years with the firm design;erosion and sediment control;traffic control;and utility coordination.
18 years total — Piilani Highway,Traffic Operational Improvements at Ohukai Road,Maui,Hawaii:
engineer assisting in storm water runoff analysis and preparation of drainage
Professional qualifications report.
Professional Engineer, — Natural Energy Laboratory of Hawaii Authority(NELHA)Airport Connector Road
Hawaii(74094),2070 Project,Kailua-Kona,Hawaii:engineer assisting in the design of approximately 3
miles(4.8 kilometers)of new roadways within the NELHA property.The project is
Education funded with state and federal funding.Design work includes roadway alignment,
B.S.,Civil Engineering, roadway construction,drainage,pavement markings and signing,potable water,
University of Hawaii,2003 salt water,permanent best management practices,and communication and
electrical ducts.
Professional memberships
— Honolulu Rail Transit Project,Oahu,Hawaii:engineer responsible for conducting
American Society of Civil field visits and inspections of active construction sites for this project that entails a
Engineers(ASCE) proposed 20-mile(32-kilometer),east-west elevated rail line to connect Kapolei in
West Oahu with the urban core of Honolulu.Job duties included field oversight for
Areas of practice various contractor activities.
Civil-Highways — Statewide Storm Water Management Program(SSWMP),Hawaii:engineer for
Hydraulics/Hydrology/ providing support in developing top priority erosion sites for mitigation,including
Wastewater cataloguing erosion sites for the islandwide erosion assessment of Hawaii
Department of Transportation(HDOT)properties and assisting in PS&E
Best Management preparation.
Practices
— Fort Weaver Road Widening,Oahu,Hawaii:engineer for final design for the design-
Inspection build widening of an existing 2.6-mile(4.2-kilometer)section of four-lane roadway
Geographic Information to a six-lane highway.Tasks included signing and pavement marking design;
System/AMS temporary traffic control layout;verifying drainage using StormCAD;curb ramp
design;erosion control;permanent BMPs and grading;riprap revetment design;
grade adjustments;and other various support in preparation of PS&E package.
— Big Island Earthquake Emergency Project,Hawaii,Hawaii:engineer for this
emergency project to assist the HDOT-Hawaii staff after a powerful earthquake and
aftershocks caused damage to HDOT's roadway system islandwide.WSP provided
on-site assistance in management and coordination.
— Kailua Road Emergency Bypass,Oahu,Hawaii:temporary emergency road to
provide temporary traffic relief to Kailua motorists.The existing roadway was
partially closed off due to potential hazards caused by landslides/rockfall.Engineer
assisting in preparation of PS&E to temporarily realign the roadway into the
grassed median.
Vt N I ) LARISSA M. L. SATO, PE
Vice President, Civil Engineer
CAREER SUMMARY
Larissa Sato is a civil engineer with more than 30 years of experience in federal-aid
transportation projects with responsibilities including project management,design,
.,et:, rconstruction support,environmental permitting and compliance,the preparation of
' environmental impact statements(EIS)and environmental assessments(EA),
transportation planning,conducting public involvement activities,and contract
administration.In the area of project management Larissa's experience includes
evaluating consultant proposals and billings;managing design consultants;preparing
plans,specifications,and estimates(PS&E);project scheduling;review of contractor's
request for information(RFI)and shop drawings submittals;change order
development;and claims evaluation.
34 years with the firm PROFESSIONAL EXPERIENCE
36 years total — Environmental Permitting,Hawaii(2021):project manager responsible for assisting
the City County of Honolulu,Department of Design and Construction,Civil
Professional qualifications Division.Since 2015,Larissa has assisted the City and County of Honolulu,
Professional Engineer, Department of Design and Construction,Civil Division(DDC CD)with
California(#46987), 7991 environmental compliance in construction.In this role she has worked on the
majority of DDC CD construction projects on Oahu. Larissa assists DDC CD with the
Professional Engineer, development and implementation of environmental efforts at both the program
Hawaii(#7337), 7997 and project level.These work items have included focus on the Clean Water Act
Education (CWA)Section 404 and Section 10 and CWA Section 401 Water Quality
Certifications(WQC).Another,seeming larger focus has become attention to the
B.S.,Civil Engineering, CWA Section 402 National Pollutant Discharge Elimination System(NPDES)
University of Hawaii, 7987 applications,including the development and review of Storm Water Pollutant
Areas of practice Prevention Plans,discharge reporting,and the overall development of guidelines
and implementation of processes to ensure environmental compliance during
Project Management construction.Larissa also assists DDC CD with applying for NPDES,Section 404,
Environmental Planning Section 401 WQC and Community Noise Variances and has assisted in the
development,review,and finalizing of environmental and in-water specifications.
Environmental Permitting She has consulted and met with various Regulatory Agencies on multiple occasions
Community Outreach/ for items ranging from rulemaking to environmental project compliance.This
Education approach has led to a collaborative effort between agencies that has streamlined
the permitting process.
Civil Engineering
— Environmental Protection Agency(EPA)Public Education and Training Program,
Best Management Hawaii(2020):project manager responsible for assisting the State of Hawaii,
Practices Department of Transportation,Highways Division(HDOT)in assisting HDOT with
Construction Mgmt. environmental compliance in construction.This includes training HDOT
construction personnel,consultants,and contractors on environmental permitting
Inspection issues.The project involves developing processes and procedures,conducting
Program Management trainings and assisting HDOT to ensure compliance with HDOT's Consent Decree,
Municipal Separate Storm Sewer System(MS4)National Pollutant Discharge
Geographic Information Elimination System(NPDES)Permit,Oahu Storm Water Management Program
Systems/Asset Plan,and projects'environmental permits.In this role Larissa has assisted HDOT in
Management System applying for and assisting with program and project level environmental
compliance with NPDES,Clean Water Act(CWA)Section 404 and Section 10,CWA
Section 401 Water Quality Certifications(WQC),and Community Noise Variances.
NN N ) DENNIS SILVA, JR., AICP
Senior Lead Environmental Planner
CAREER SUMMARY
Dennis Silva,Jr.is a Senior Lead Environmental Planner with experience in planning and
permitting processes in the City and County of Honolulu and the State of Hawaii. He is well
versed in projects related to Special Management Areas(SMA),Rezoning,and Environmental
Assessments(EA)related to affordable housing,SMA,and rezoning projects.His strength is
ensuring planning projects are compliant with Federal,State and Local regulations and
ordinances.He excels in communicating complex projects to the team,clients,stakeholders,and
t elected officials.Prior to joining WSP,Dennis was in private consulting,managing and
i +� / 0 Vii,, completing various land use,environmental and zoning projects for private clients.He was also a
^ I.;
��a` %`t= � -�� ��'t; Planner at the City and County of Honolulu,specializing in subdivision projects,park dedication,
ti and long-range planning related to Development Plans,Sustainable Communities Plans,and
Transit-Oriented Development(TOD)Plans.
<1 Year with the firm
PROFESSIONAL EXPERIENCE
24 years total
— Hana Highway Mile Post 10 Rockfall Protection,Paia-Haiku,Hawaii(on-going):
ducation environmental planner for the rockfall protection project.The Federal Highway
Administration(FHWA),in cooperation with the State of Hawaii Department of
M.S. Urban Planning Transportation(HDOT),is planning the Hana Highway Rockfall Protection and Slope
University of Arizona, Stabilization MP 10.18 to MP 10.49 project.A NEPA Categorical Exclusion(CatEx)will be
Tucson, 7998 completed for this project.
B.A. Political Science, — Hana Highway Mile Post 4.3 Culvert Repair,Maui,Hawaii(on-going):environmental planner
University of Hawaii at for the culvert repair project.The Hana Highway Culvert is located at Milepost 4.3 of the
Manna, 7993 Hana Highway(Route 360)approximately 2.5 miles east-southeast of Haiku on the island of
Registrations/ Maui.The culvert consists of grouted rubble abutments with a concrete deck spanning
Certifications approximately 7 feet.A NEPA CatEx is also required as part of project scope.
American Institute of — Nanue Stream Bridge,Hamakua,Hawaii(on-going):environmental planner.Rehabilitating
Certified Planners(AICP) the Nanue Stream Bridge by addressing the deterioration in the superstructure by repairing
steel truss members,bearings,gusset plates,rivets,etc.that have corrosion and section loss;
dons addressing spalls delamination in the concrete deck,bridge railings,column pedestals and
American Planning foundations;and addressing other significantly deteriorated bridge elements.
Association
PREVIOUS PROFESSIONAL EXPERIENCE
.reas of practice
— Kualoa,Kaaawa,Punaluu,and Hauula Shoreline Erosion Mitigation(2021-2022):lead
Project Management environmental planner for the preparation of the Hawaii Environmental Policy Act(HEPA)
Land Use Planning Draft Environmental Assessment,NEPA CatEx,and other related environmental permits.
The State of Hawaii Department of Transportation(HDOT)is proposing to implement
Environmental Permitting permanent roadway protection measures along Kamehameha Highway,from the south end
Environmental Planning of Kualoa Ranch to Hauula town.The proposed project will involve erosion mitigation and
protection.
Land Use and Zoning
Regulations — Puunene Avenue Widening Safety Improvements,Wailuku,Hawaii(2021-2022):lead
environmental planner for the HEPA Draft EA,NEPA CatEx,Section 7,195d,and other
Community environmental permits...Increase roadway safety and capacity by adding two additional
Outreach/Education vehicle lanes and shared shoulders.Construct new sidewalks on both sides of Puunene
Avenue,linking Wakea Avenue to Kuihelani Highway.
— Farrington Highway Safety Improvements,Kapolei,HI(2020-2022):lead environmental
planner.The project encompasses a 4.13-mile segment of Farrington Highway from
Pohakunui Avenue(Nanakuli)to Interstate H-1.A NEPA CatEx was completed for this
project.
Vt N I ) MATTHEW SMALL
Lead Consultant, Environmental Planner
CAREER SUMMARY
Matthew Small is a planner with experience in public education,training,
environmental planning,international development,and organizational dynamics.He
' has worked extensively in all aspects of training including coordination,logistics,
training materials development,and leading sessions.He has facilitated trainings on
topics such as construction best management practices,post-construction best
management practices,maintenance facilities management,chemical application,and
illicit discharge inspection.He has lead training sessions on storm water awareness,
\UNational Pollution Discharge Elimination System(NPDES)permit compliance,
�. �f g y
r % �4 construction best management practices,facilities maintenance,and materials storage
practices.Matthew has coordinated public education activities including web
development,printed materials development and production,TV and radio public
10 years with the firm service announcements,school visitations and public event participation.
22 years total PROFESSIONAL EXPERIENCE
Education — Honoapiilani Highway Improvements,West Maui,Hawaii:Currently coordinating
agency and public involvement and outreach in support of the preparation of a
BFA, Fine Arts, University of joint NEPA/HEPA EIS.This includes completing demographics and Environmental
Hawaii, 7995 Justice analysis,writing the NEPA compliant Agency Outreach and Public
Areas of prate+i Involvement Coordination Plan,public meeting and public hearing preparation
and coordination,and GIS analysis.
Environmental Planning
— Interstate H-1 Eastbound Widening from Waiawa Interchange to Waiau
Environmental Permitting Interchange,Honolulu,Hawaii:planner leading environmental compliance with
Community Outreach/ NEPA and HRS Chapter 343.Coordinating the preparation of HRS Chapter 343 EA,
Education NEPA CatEx,including coordination of technical studies,public involvement,and
coordination with relevant federal,state,and county regulatory agencies,
Program Management including USFWS,NMFS,Army Corps of Engineers,SHPO,and Department of
Geographic Information Health.WSP is providing environmental documentation/permitting and design
System/AMS services for the widening of Interstate H-1 from the Waiawa Interchange to the
Waiau Interchange.The purpose of this project is to provide short-term congestion
relief on Interstate H-1 in the eastbound direction in the vicinity of Waikele to the
vicinity of Halawa.
— State Highway Climate/Natural Hazards Resiliency Plan,Statewide,Hawaii:
planner for coordinating GIS data collection and GIS mapping for vulnerability
assessment of State roadway network.
— Kamehameha Highway to Laniakea Realignment,Oahu,Hawaii:planner currently
facilitating environmental compliance and public involvement to comply with
NEPA and HRS Chapter 343.Environmental compliance for this project includes
Section 106,Chapter 6E,Section 7,Chapter 195d,and SMA coordination.WSP led
preparation of a Chapter 343 and National Environmental Policy Act document to
realign Kamehameha Highway in the vicinity of Laniakea Beach.At completion,the
planning study produced conceptual engineering of a preferred improvement
alternative at the corridor level and carried the various phases of the preferred
alternative through the environmental planning process.
— Hana Highway Flood Scour Projects,Maui,Hawaii:planner responsible for
coordination of emergency flood damage repairs at three locations along the
historic Hana Highway,including all NEPA and Chapter 343 compliance and
permitting.
NN N ) JASON SUGIBAYASHI, PE, CISEC
Lead Consultant, Civil Engineer
CAREER SUMMARY
Jason Sugibayashi is a civil engineer performing a wide variety of civil designs.His
broad range of experience covers drainage studies and analysis,grading work,
infrastructure and utility design,as well as preparing engineering reports while
working with numerous government and private agencies.His thorough understanding
of civil design requirements adds value to his participation in the permitting process
and achieving construction documents compliance.
PROFESSIONAL EXPERIENCE
— Ala Moana Elevated Pedestrian Walkway;Honolulu,Hawaii(In Construction):civil
engineer responsible for developing construction documents for a new multi-use
path crossing Ala Moana Boulevard and providing post-design services to the
5 Years with the firm client.
15 Years total — Kuakini Highway Drainage Improvements,Vicinity of Mile Post 114;Honalo,
Hawaii(In Construction):civil engineer responsible for developing construction
Professional qualifications documents for a new localized drainage system to mitigate damage to adjacent
Professional Engineer properties caused by storm runoff and providing post-design services to the client.
Hawaii(#75370),2073 — State of Hawaii-Hawaii Housing Finance&Development Corporation,Villages of
Certified Inspector of Kapolei Dedication Project,Kapolei,Hawaii(On-going):civil engineer responsible
Sediment and Erosion for assessing existing infrastructure,developing construction documents,and
Control,CISEC Inc,2022 providing post-design services for work to facilitate the dedication of roads and
infrastructure to the City&County of Honolulu.
Education
— City&County of Honolulu,Department of Design&Construction Environmental
B.S.,Civil and Permitting Support,Honolulu,Hawaii(2021):civil engineer responsible for
Environmental assisting the City&County of Honolulu's Department of Design&Construction
Engineering, University of with assembling their environmental permitting for various city road construction
Hawaii,2008 projects.
Areas of practice — Hawaii Department of Transportation,EPA Public Education and Training,Oahu,
Hawaii(2020):Civil engineer responsible for assisting the Department of
Permitting
Transportation with assembling their environmental permitting for various DOT
Hydraulics/Hydrology road construction projects.
Best Management PREVIOUS PROFESSIONAL EXPERIENCE
Practices
— Fisher Distribution Center Warehouse,Kalaeloa,Kapolei,Oahu,Hawaii(2017):
Site Infrastructure project engineer/manager responsible for design of the infrastructure for two new
Subdivision Design warehouses in the Malakole Industrial Park.Services included utility design,site
layout,grading,design computations and permitting.
Geographic Inf.
Systems/AMS — New Napa Warehouse,Waipahu,Oahu,Hawaii(2017):project engineer/manager
responsible for design of the infrastructure for a new warehouse at the existing
Napa Distribution Center.Services included utility design,site layout,grading,
design computations and permitting.
— Consolidated POL PMRF,Pacific Missile Range Facility,Barking Sands,Kauai,
Hawaii(2015):project manager/engineer responsible for the design build project,
including site layout,grading,infrastructure,drainage and pump calculations,and
permitting.The project included new aboveground storage tanks and replacement
of fuel dispensers,renovation/replacement of existing jet fuel piping,
renovation/replacement of two existing truck fill stands,renovation of nine jet
fuel pump houses,and replacement of nine fuel pumps servicing the truck fuel
stands.
Vt ' ) RANDALL M. URASAKI, PE, LEED AP BD+C
Senior Vice President, Local Business Leader
CAREER SUMMARY
Randall is a senior area manager for the West Region and possesses a comprehensive
' background in the preparation of a variety of different types of projects,involving
different types of funding sources.He is currently the project manager of several
ongoing projects such as the Kauai Emergency Projects.
PROFESSIONAL EXPERIENCE
— Natural Energy Laboratory of Hawaii Authority(NELHA)Airport Connector Road
Project,Kailua-Kona,Hawaii(2019):project manager for the planning,permitting
and design of approximately 3 miles(4.8 kilometers)of new roadways within the
NELHA property.The project is funded with State and Federal funding.The firm's
36 years with the firm scope of work includes obtaining the National Environmental Policy Act(NEPA)
36 years total Categorical Exclusion and Coastal Zone Management Certification.Design work
includes roadway alignment,roadway construction,drainage,pavement markings
Professional qualifications and signing,potable water,salt water,permanent best management practices
(BMPs),and communication and electrical ducts.
Professional Engineer,
Hawaii(#7269), 7992 — Kauai Emergency Projects,Kauai,Hawaii(On-going):project manager for
U.S. Green Building Council environmental permitting and civil design for various locations on the island of
(USGBC)LEED Accredited Kauai to provide emergency assistance to maintain roadway connectivity
Professional,2009 disrupted due to heavy rainfall.The firm's scope of work included obtaining
Categorical Exclusions and permits;assisting the Hawaii Department of
:duration Transportation(HDOT)in preparing Detailed Damage Inspection Reports for
M.B.A., University of Hawaii, federal assistance;and preparing civil plans.Civil design included temporary
7993 bypass roads,roadway construction,drainage and grading,signing and pavement
markings,and traffic control plans.
B.S.,Civil Engineering, 7986
Areas of practice — Fort Weaver Road Widening Design-Build,Oahu,Hawaii(2013): project manager
on this design-build roadway widening project teamed with Hawaiian Dredging
Project Management Construction Company.The project included widening the roadway from four to
Environmental Permitting six lanes and includes,two new pedestrian bridges,retaining walls,drainage and
grading,signing and striping,traffic signal systems,closed circuit television
Civil Engineering (CCTV)systems,utility ductbank,utility relocations,bus turnouts,stream
Hydraulics/Hydrology dredging,permanent BMPs,landscaping and irrigation.Project scope also included
preparation of PS&E,structural and drainage reports and calculations,public
Best Management informational meetings,and coordination of permitting.
Practices
Construction Management — Big Island Earthquake Emergency Project,Hawaii,Hawaii(2007):project manager
for this emergency project to provide assistance to the HDOT-Hawaii staff after a
Program Management powerful earthquake and aftershocks caused damages to the HDOT's roadway
system island-wide.WSP provided on-site assistance in management and
coordination,and also coordinated and applied for necessary permitting for the
various projects.
— H-1 Rehabilitation Project,Eastbound Lanes,Waiau Interchange(I/C)to Kaimakani
Street,Honolulu,Hawaii(2010):project manager for designing the repair of the
pavement within the project area.Project scope included preparation of PS&E,and
coordination of permitting.
Vt ' ) PAMELA UYEDA, PE, LEED AP BD+C, PMP, CISEC
Vice President, Civil Engineer
CAREER SUMMARY
Pamela Uyeda is a civil engineer and project manager in the Honolulu office with
experience in roadway design,traffic signal design,traffic control,hydrologic and
hydraulic analyses,permitting,and preparation of plans,specifications,and estimates
(Ps&E).
.e.
PROFESSIONAL EXPERIENCE
— Kekaha and`Akialoa Road(Route 551)Improvements:project manager responsible
for conceptual engineering designs and public involvement charrettes in Kekaha
on the island of Kauai.Conceptual engineering designs included the development
of four conceptual alternatives for multi-modal improvements along Kekaha and
27 years with the firm `Akialoa Roads.The design concepts also included the preliminary design of a
roundabout and an analysis of culvert crossing alternatives for an irrigation ditch.
27 years total The public involvement charrette consisted of a series of four events:a walk audit,
a school focus group meeting,a visioning+design training meeting,and a follow-
Professional qualifications up public meeting.
Professional Engineer, — Lydgate Park to Kapaa Bicycle/Pedestrian Path Right-of-Way and Design,Kauai,
Hawaii(#70352),2007 Hawaii:project manager responsible for overseeing the right of way and easement
LEED AP Building acquisition,right-of-entry and property adjustment agreements,permitting,and
Design+Construction development of conceptual and final design plans for a new coastal shared use path
Project Management through resort properties near Kapaa.The scope of work includes land appraisals
Professional for each affected property(11 total),preparing and filing land court maps and
petitions,and processing the first Special Management Area/Shoreline Setback
Certified Inspector Variance applications under the new Kauai County shoreline ordinance.
Sediment and Erosion
Control(CISEC),2070 — Interstate Route H-1 Rehabilitation,Middle Street to Vicinity of Ward Avenue,
(0568) Oahu,Hawaii:project manager responsible for overseeing the completion of
environmental clearances,permitting requirements,and PS&E development for
Education the resurfacing and rehabilitation of 3.5 miles of Interstate Route H-1 throughout
M.S.,Civil Engineering, the most heavily traveled corridor in Honolulu.Project design elements included
University of Hawaii,2002 assessing the pavement condition;determining an appropriate repair;restriping
the interstate to add an additional through lane;ancillary safety improvements;
B.S.,Civil Engineering, installing a geosynthetic reinforced soil wall for slope stability;and bridge
University of Hawaii, 7996 widening.The project also required obtaining numerous design exceptions from
FHWA;A+B contracting including road user cost analysis;incentive/disincentive
Area Nlspecifications;and coordination with landowners and lessees for construction
Project Management parcels.
Environmental Permitting — City and County of Honolulu,Department of Facility Maintenance(DFM),
Civil Engineering Stormwater Monitoring and Total Maximum Daily Load Activities,Honolulu,
Hawaii:WSP provided stormwater monitoring and total maximum daily load
Hydraulics/Hydrology analysis and tracking for the Department of Facility Maintenance to comply with
Best Management the National Pollutant Discharge Elimination System Permit.Duties included
Practices Environmental Protection Agency/Department of Health permit language review,
Traffic/Transportation end-of-pipe and stream monitoring,development of local event mean
Engineering concentration loads for urban land uses,development of watershed
implementation and monitoring plans,and tracking and calculating Municipal
Geographic Information Separate Storm Sewer System(MS4)pollutant load reductions.Supplementary
Systems tasks include assisting DFM with watershed water quality modeling efforts,
preparation of a Green Infrastructure Handbook,tracking TMDL development
nationwide,and preparation of the Annual Monitoring Plan and Annual
Monitoring Report for submittal to the Department of Health.
Vt ' ) KEVIN K.O. WONG, PE
Vice President, Civil Engineer
CAREER SUMMARY
Kevin Wong has more than 40 years of experience managing and designing a diverse
range of engineering projects in both the private and public sectors.He is currently the
program lead for the HDOT Highways Division Maui District MS4 Program.He served as
the discipline manager for hydraulics/hydrology/flood hazard studies,surveying,and
right-of-way on the Honolulu Rail Transit Project,GEC Contract,Phases I&II;project
manager(PM)for the Statewide Dam Break Analysis for the US Army Corps of
Engineers(USACE)/Department of Land and Natural Resources(DLNR);and PM for the
Interstate Route H-3 Tetsuo Harano Tunnel Project.
PROFESSIONAL EXPERIENCE
— Maui District MS 4 Program,Kahului,Maui,Hawaii(2019):Kevin serves as program
32 years with the firm lead for the Illicit Discharge Detection and Elimination Program(IDDE),which
48 years total includes the development of the following program activities:
— Examining existing regulatory mechanisms related to illicit discharges and
Professional qualifications illegal connections to the Maui MS4,and where required,proposing amended
Professional Engineer, or new policies,ordinances,and procedures to facilitate more effective
Hawaii(#8048), 7993 administration and enforcement of the IDDE Program.
— Detecting and eliminating illegal discharges and illegal connections by means
Professional Engineer, of storm drain inspections,field screening of outfalls,public reporting or
California, 7978 complaints,and follow-up site inspections to identify and eliminate illicit
discharges/illegal connections.
Education — Developing and administering an IDDE tracking and reporting database linked
B.S.,Civil Engineering, to a GIS system,which will allow Maui District to manage and to analyze IDDE
University of Hawaii, 7974 data and to produce maps and reports.
— Developing and conducting public education and outreach programs and
Areas of practice training designed to prevent/minimize illicit discharges/illegal connections.
Project Management — Honolulu Rail Transit Project(HRTP),General Engineering Consultant(GEC)Phase
Environmental Permitting II,Final Engineering,Environmental Support,and Other Services,Honolulu,Hawaii
(2014):Kevin served as discipline manager for the flood hazard analysis and no-rise
Civil Engineering mitigation;clean water act section 404 and 401 individual permits;final design of
Hydraulics/Hydrology Waiawa stream improvements;contract compliance reviews;and real estate
acquisition support.
Best Management
Practices — Honolulu Rail Transit Project(HRTP),General Engineering Contract(GEC)Phase I,
EIS/Preliminary Engineering,Honolulu,Hawaii(2011 Kevin was the discipline lead
Construction Management for surveying,right-of-way,drainage,and intelligent transportation systems.
Inspection — Hawaii Water Systems,Technical Studies Program,Statewide Dam Break Analysis
Program Management Project,Hawaii(2008):project manager for a study team consisting of WSP and
Northwest Hydraulic Consultants,Inc.(NHC).In this USACE/DLNR project,the
Geographic Information team was tasked with performing dam break analyses for earthen dams at the Puu
Systems/Asset Lua Reservoir on the island of Kauai and the Kualapuu Reservoir on the island of
Management System Molokai.This work includes conducting field investigations;verifying/validating
government-furnished electronic topographic information(LiDAR and IfSAR);
coordinating and scoping ground surveying requirements with the project
surveyor,ControlPoint Surveying,Inc.;performing hydrologic(HEC-HMS)and
hydraulic(unsteady HEC-RAS)modeling;mapping(HEC-GeoRAS)flood inundation
areas resulting from worst-case dam breach scenarios;and producing draft and
final reports documenting project findings.
NN N ) WAYNE Y. YOSHIOKA
Vice President, Transportation Engineering
CAREER SUMMARY
Wayne Yoshioka has more than 43 years of experience in project management and
technical analysis of major transportation studies and engineering projects working for
transportation consulting firms in Hawaii and Colorado.He has been involved in
projects requiring broad,multidisciplinary knowledge of engineering,planning,
finance,and public relations.his experience combines transportation planning which
takes a big picture view of transportation with traffic engineering which pays attention
,fs k to the operational and design details that are required to actually implement
° transportation solutions.He also understands policy level issues and how to manage
these issues to allow projects to succeed.
< � ": He served two mayoral administrations as the Director of the City and County of
14 years with the firm Honolulu Department of Transportation Services(DTS).In that capacity,he interacted
regularly with the Hawaii State Legislature,Honolulu City Council,and State of Hawaii
43 years total and City and County of Honolulu agencies.As DTS Director,Wayne sat on the Board of
the Honolulu Authority for Rapid Transportation(HART),the fixed guideway rail
Professional qualifications system now under construction and was intimately involved in the process that
Professional Engineer,
obtained the approval for HART from the Federal Transit Administration(FTA).
Colorado(20789), 7990 Wayne has experience in areas of transportation including regional and sub-regional
Applying for Hawaii transportation planning;livable communities and transit-oriented development(TOD)
Reciprocity planning;complete streets planning and design;traffic safety;intersection design;
traffic signal design;traffic coordination and optimization;parking demand studies and
Education parking layout design;transit rail and bus planning;high-occupancy vehicle(HOV)
B.S.,Civil Engineering, planning;airport groundside planning;multi-modal planning;travel demand
University of Hawaii, 7978 forecasting;recreational transportation planning;and traffic impact analysis studies.
Areas of practice PROFESSIONAL EXPERIENCE
Project Management — Honoapi`ilani Highway Improvements,Milepost 10.5 to Milepost 18.0,Maui(On-
Transportation Planning going):project manager for NEPA/343 EIS and Preliminary Engineering leading to
an RFP for Design-Build solicitation.Project proposes to realign Honoapi`ilani
Traffic/Transportation Highway inland to address sea-level rise.
— North-South Road,Kapolei:project manager for NPEA/343 EA and Preliminary
Engineering for a new arterial roadway and H-1 interchange.Project dealt with
endangered Abutilon Menziesii plant.Successful clearance of EA and preliminary
engineering led to current Kualaka`i Parkway and interchange.
— Hanapepe Road Improvements,Kaua`i:senior advisor for complete streets
conceptual design to integrate enhanced pedestrian and multimodal elements into
an existing roadway in Hanapepe town.
— Hamakua Drive Bicycle Lane Improvements,Kailua,0`ahu:senior advisor for
design project to implement bicycle lane on Hamakua Drive from Kailua Road to
Keolu Drive.Project was a tier 1 bicycle network project for the City and County of
Honolulu.
— Saddle Road Extension EIS,Waikoloa,Hawai`i(Big Island):project manager for
transportation element of EIS for a proposed extension of Saddle Road(Daniel K.
Inouye Highway)between Mamalahoa Highway and Queen Ka`ahumanu Highway.
Involved both transportation forecasting and intersection operational analyses.