|
AECOM I County of Hawaii,Planning Department,Fiscal Year 2024
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME �,. 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> A.TOTAL B.VV1TH CURRENT FIRM
<br /> Lily Nazareno Technical Review 7 7
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> AECOM Technical Services, Inc.(Honolulu, Hawaii)
<br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> BA, English, minors in Writing and Multimedia Professional Certificate in N/A
<br /> Urban and Regional Planning, Hawaii Pacific University
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.)
<br /> Lily Nazareno is a dedicated and diversified technical editor and writer providing quality review and technical support in projects for federal,state,
<br /> and city/county clients. Extensive experience with CERCLA process deliverables. Editing and contributing writing for complex NEPA and HRS
<br /> Chapter 343 project documents, including internal quality review process facilitation,production,and distribution; NOA publications coordination and
<br /> public meeting preparation;and stakeholder outreach.
<br /> Organizations-Member of the Society for Technical Communication
<br /> II 19.RELEVANT PROJECTS
<br /> a. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Department of the Navy, Environmental Assessment for Lease of PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Land for Energy Generation and Storage,Resiliency,Reliability, 2020 N/A
<br /> and Security(Joint Base Pearl Harbor-Hickam, HI)
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm
<br /> Technical Support/Author and Technical Editor.The proposed action is to construct battery energy storage systems and a photovoltaic solar
<br /> array system at the sites.Conducted research and authored EA discussions of land use and public health and safety impacts relating to the
<br /> proposed action. Conducted technical editing review of the EA and produced deliverable files for client submittal.
<br /> b. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> HDOT, Highways Division, Environmental Assessment for PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Puunene Avenue Safety Improvements and Road Widening 2019 N/A
<br /> (Kahului, HI)
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Technical Support/Author and Technical Editor.Contributed writing and discussions of impacts relating to transportation,health and safety,
<br /> alignment with the County of Maui Countywide Policy Plan,and public facilities and services.Created document template and provided document
<br /> preparation guidance. Conducted technical editing review of the EA and produced deliverable files for client submittal.
<br /> c. (1)TITLE AND LOCATION(City and State) See Project#2 in Section F (2)YEAR COMPLETED
<br /> Pearl Harbor Naval Shipyard Dry Dock&Waterfront Production PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Facility EIS (Oahu,HI) 2019-2022 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Technical Editor.The proposed action is to construct and operate a dry dock and waterfront production facility at PHNSY and IMF,which would
<br /> increase collaboration and efficiency among the workforce. Maintained document templates and style guide for consistency and quality reviews.
<br /> Conducted formatting,acronyms,and references checks as well as technical editing review of the EIS.
<br /> d. (1)TITLE AND LOCATION(City and State) 2)YEAR COMPLETED
<br /> Pacific Missile Range Facility Integrated Natural Resources PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Management Plan and Environmental Assessment(Kauai, HI) Ongoing N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Technical Support/Author and Technical Editor. Updated EA and revised the impact assessments based on latest 2022 INRMP,new
<br /> information on resources,and other new references and guidance since the 2019 draft EA.Assisted with internal quality review process oversight.
<br /> Conducted technical editing review of the EA and produced deliverable files for client submittal.
<br /> (1)TITLE AND LOCATION(City and State) See Project#7 in Section F (2)YEAR COMPLETED
<br /> Waikiki War Memorial Natatorium EIS PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> (Honolulu, HI) 2019 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Technical Editor.Assisted with draft and final EA revisions according to stakeholder input in this high profile project. Created document template
<br /> and provided preparation guidance.Assisted with internal quality review process oversight. Conducted technical editing review of the EIS and
<br /> produced deliverable files, including electronic and hard copies,and completed client submittal and stakeholder distribution.
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021)PART I -PAGE E-7
<br />
|