|
AECOM I County of Hawaii,Planning Department,Fiscal Year 2024
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME �,. 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> A.TOTAL B.WITH CURRENT FIRM
<br /> Courtney Hymes Environmental Planner/Permitting Specialist 16 9
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> AECOM Technical Services, Inc.(Honolulu, Hawaii)
<br /> 16.EDUCATION 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> BS, Biology,San Francisco State University
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.)
<br /> Courtney Hymes is an Environmental Planner specializing in environmental impact assessment,biological assessment,environmental permitting,
<br /> and species protection. She has contributed to the preparation of environmental impact statements(EIS)and categorical exclusions compliant
<br /> with the National Environmental Policy Act and assessment of potential impacts in accordance with Hawaii Revised Statute Chapter 343(HRS
<br /> 343). Courtney has conducted Endangered Species Act(ESA)Section 7 consultation with National Marine Fisheries Service(NMFS)and U.S.
<br /> Fish and Wildlife Services(USFWS), Essential Fish Habitat(EFH)consultation with NMFS,and National Historic Preservation Act Section 106
<br /> and HRS Chapter 6E consultation with the State Historic Preservation and Division(SHPD).She has prepared applications for Marine Mammal
<br /> Protection Act incidental harassment authorization, Clean Water Act Section 404 permits, Section 401 Water Quality Certificates and Section
<br /> 402 National Pollution Discharge Elimination System(NPDES)permits,and Special Management Area(SMA)permits. Courtney has conducted
<br /> biological surveys,construction monitoring,and wetland delineations.She has reviewed and provided recommendations on construction plans,
<br /> contract change orders,and special provisions.Courtney has prepared storm water pollution prevention plans(SWPPP)and habitat mitigation and
<br /> monitoring plans. She has worked directly with clients,contractors,and regulatory agencies to address compliance issues and implement
<br /> mitigation and monitoring requirements.
<br /> Training-Wetland Delineation Certification, Nationwide Permits, Fall Protection Training, OSHA HAZWOPER 40-Hour,and 8-Hour Confined
<br /> Space Entry
<br /> 19.RELEVANT PROJECTS
<br /> a. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> HDOT, Highways Division, Laieloa Stream Bridge Replacement PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> (Laie, HI) Ongoing
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm
<br /> Environmental Planner 1 Biologist.Conducted biological survey of aquatic and terrestrial flora and fauna, including an assessment of habitat
<br /> quality and potential use of habitats by endangered and threatened species. Prepared ESA Section 7 consultation letter to USFWS for endangered
<br /> Hawaiian waterbirds. Prepared National Historic Preservation Act,Section 106 Consultation letters to SHPD, Native Hawaiian Organization and
<br /> interested parties. Reviewed literature on previous cultural,historic and archaeological investigations in the area to determine potential for effects
<br /> to historic resources.
<br /> b. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> HDOT,Airports Division,Relocate Runway 3-21, Lihue Airport PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> (Lihue, HI) Ongoing Ongoing
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm
<br /> Environmental Planner and Biologist for the ongoing$1,924,618 relocation of Runway 3-21 to extend the runway to at least 6,500 feet and provide
<br /> sufficient runway safety areas(RSAs)that comply with Federal Aviation Administration(FAA)requirements.As Environmental Planner and Biologist,
<br /> prepared the NEPA CatEx and HRS 343 Declaration of Exemption documentation for this project.Because of potential effects to endangered Hawaiian
<br /> waterbirds and seabirds,advised the Hawaii Department of Transportation that Section 7 consultation with USFWS would be required along with a
<br /> finding of may affect,not likely to adversely affect in order to avoid elevating the project to an Environmental Assessment(EA)or Environmental Impact
<br /> Statement(EIS).Through consultation with the USFWS and implementation of avoidance and minimization, including changes to the construction
<br /> schedule,the USFWS was able to concur with the determination of may affect,not likely to adversely affect threatened and endangered species.
<br /> c. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> HART,Honolulu Rail Transit Project,Airport Station Group Design PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> (Honolulu, HI) 2015 Ongoing
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm
<br /> Environmental Planner who reviewed construction plans for the four stations to insure compliance with environmental commitments.Prepared permit
<br /> applications and tracked environmental mitigation and monitoring commitments.
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021)PART I -PAGE E-9
<br />
|