|
AECOM I County of Hawaii,Planning Department,Fiscal Year 2024
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> A.TOTAL B.WITH CURRENT FIRM
<br /> Brittany Obando, CISEC Environmental Planner
<br /> 10 <1
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> AECOM Technical Services, Inc.(Honolulu, Hawaii)
<br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> BA, Environmental Studies-Society and Policy Certified Inspector of Sediment and Erosion(CISEC)
<br /> Graduate Certificate-Sustainable Environmental Planning and Management
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.)
<br /> Brittany Obando is a Senior Environmental Planner and Project Manager in the Honolulu office experienced in the planning and permitting
<br /> intricacies of Hawaii-based projects. Her experience includes serving as a project manager for transportation, natural resources,and infrastructure
<br /> improvement projects throughout the major Hawaiian Islands. She is a dedicated environmental professional experienced in managing technically
<br /> complex planning and permitting projects through self-motivation and passion for regulatory research and agency consultation. Certified Inspector
<br /> of Sediment and Erosion Control(CISEC),a nationally recognized accreditation related to storm water permitting,compliance, inspection,and
<br /> reporting. Past member of the Hawaii Water Environmental Associated and Hawaii Association of Environmental Professionals.
<br /> 19.RELEVANT PROJECTS
<br /> a. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> U.S. Fish and Wildlife Service, Hanalei River Emergency Intake PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Repair and Alternative Intake (Hanalei, HI) 2019-2022 2022
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Project Manager/Planner.This two-part project included design and permitting services for repair of the existing Hanalei River intake and
<br /> damaged during historic rain events and a new/alternative intake.The existing intake manages water flow to the culturally and economically
<br /> significant taro fields downstream.Tasks included federal NEPA Categorical Exclusion and CWA Section 404 permitting efforts and state-level
<br /> Stream Channel Alternation and NPDES permitting,assisted with agency/stakeholder engagement.
<br /> b. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Department of Hawaiian Homelands (DHHL), Phase I and II PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Environmental Site Assessments (ESA) for Multiple Sites 2017 N/A
<br /> (Oahu, HI)
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Environmental Scientist/Planner.Conducted Phase I and Phase II ESAs for the DHHL including of a former racetrack and a trucking
<br /> maintenance facility in Kalaeloa,and commercial ranching/agriculture operation in Waimanalo.The ESAs met ASTM E1527-13 or ASTM E2247-
<br /> 08 Standards,All Appropriate Inquires(AAI)as defined by ASTM and EPA(40 CFR 312),pursuant to CERCLA regulations.
<br /> c. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> U.S. Fish and Wildlife Service,AST Relocation and Wash Rack PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Design (Hanalei, HI) 2017 Unknown
<br /> ,)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Environmental Scientist.Assisted in planning and design of the aboveground storage tank and wash rack relocation at the USFWS'Hanalei
<br /> Refuge maintenance base yard. Duties included onsite interviews with Refuge staff to understand current uses and needs of the facility to best
<br /> design a relocation plan on the client's tight budget and physical onsite constraints. Challenges included designing around the nearby historic
<br /> China Ditch to minimize potential pollutants entering into this perennial waterbody.
<br /> d. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Board of Water Supply, Nuuanu Reservoir No. 4 Maintenance PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Drudging (Honolulu, HI) 2019 N/A
<br /> bhibr utochir I i:;ry,, ope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Environmental Scientist.Assisted in development of the NPDES NOl C(construction)and an Individual NOl G(dewatering)permit.She assisted
<br /> in creating a dewatering plan to prevent discharge from the project area via a sprinkler system running along the perimeter of the project boundary,
<br /> which allowed for a decrease in the quantity of dewatering effluent to be discharged into the nearby Nuuanu Stream.
<br /> e. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kukuiula Kula Makai PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> (Koloa, HI) 2019 Unknown
<br /> bKlbr ubSCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Environmental Scientist/Planner.Conducted a Phase I Environmental Site Assessment for the client,a luxury restate developer, looking to
<br /> construct multi-million-dollar homes along Kauai's southern coast in the location of former sugar cane fields, known for heavy pesticide and
<br /> herbicide use.The ESA met ASTM E1527-13 Standards.
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021)PART I -PAGE E-11
<br />
|