Laserfiche WebLink
AECOM I County of Hawaii,Planning Department,Fiscal Year 2024 <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME �,. 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> A.TOTAL B.WITH CURRENT FIRM <br /> Yue (Selena) Qiu, GISP, LEED GA GIS Specialist <br /> 13 13 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> AECOM Technical Services, Inc.(Honolulu, Hawaii) <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> MS, Marine Science, Hawaii Pacific University LEED Green Associate, National <br /> BS, Biological Science,Shandong University(Jinan,China) <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.) <br /> Selena Qiu is an Environmental Scientist and Planner,with experience in environmental permitting(NPDES, SMA, CDUA, noise permit), <br /> environmental compliance documents(environmental assessment),geospatial data analysis and management,environmental compliance review <br /> for transportation projects,military base asset audit and asset evaluation,military telecommunication functional plans,storm water/soil/soil gas <br /> sampling,and Phase 1 environmental site assessments. She has 13 years of experience in ArcGIS,and is familiar with AutoCAD,Autodesk <br /> Infraworks(for 3D modeling),Autodesk ReCap(for 3D scanning camera),Adobe Illustrator,and Adobe InDesign. <br /> Organizations-Hawaii Mainland Chinese Overseas Association,Bilingual Toastmasters; Hawaii Geographic Information Coordinating Council;and <br /> Hawaii Association of Environmental Professionals <br /> 19.RELEVANT PROJECTS <br /> a. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> HART, Honolulu Rail Transit Project,Airport and City Center PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Guideway and Utilities Design (Aiea to Honolulu, HI) Ongoing Ongoing <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> GIS and Environmental Scientist who is aiding in the preparation of the National Pollutant Discharge Elimination System(NPDES)permit,noise <br /> permit,and noise variance applications for the Airport and City Center segments of the proposed rail guideway.Also created all environmental <br /> compliance GIS maps and graphics,and created all CAD drawings supporting environmental permitting.The two segments of the guideway <br /> stretch from Aloha Stadium to Ala Moana shopping center via Honolulu International Airport and downtown Honolulu.The project includes the <br /> structural design for the pre-cast segmental concrete guideway,along with all roadway improvements,geotechnical engineering, maintenance <br /> of traffic, utility relocations, intelligent transportation systems(ITS), landscaping,and interface with other contracts(station architecture,transit <br /> systems,and the adjacent design-build section). <br /> b. (1)TITLE AND LOCATION(City and State) See Project#8 in Section F (2)YEAR COMPLETED <br /> CCH, DPP,Airport Area Transit-Oriented Development Plan PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Honolulu, HI) Ongoing N/A <br /> bhlth L i-cPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Planner for the$350k project that involves the preparation of a plan to address potential development opportunities within a half-mile radius <br /> around the Honolulu Rail Transit Project's Pearl Harbor station,Airport station,and Lagoon Station.The project involved stakeholder and <br /> community outreach,including meetings and presentations with business and area organizations.Area concepts were developed and a preferred <br /> alternative was selected for each of the station areas.A final plan has been submitted to the City and AECOM is awaiting comments.As Planner, <br /> lead for graphic design and public meeting preparation. <br /> (1)TITLE AND LOCATION(City and State) See Project#9 in Section F (2)YEAR COMPLETED <br /> Blaisdell Center Master Plan PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Honolulu, HI) 2018 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> GIS Specialist and Environmental Scientist on the$4.5 million master plan project that utilized work done under an earlier feasibility study as <br /> a foundation in which to prepare detailed concepts of the overall site(landscape,circulation,pick-up/drop-off,etc.), renovated Concert Hall and <br /> Arena,and new Exhibition Hall, Performance Hall, Sports Pavilion,and Parking Garage. Fifteen technical studies were also performed during <br /> this phase of the project to further investigate site and building conditions,sustainable design strategies,traffic impacts, retail demand,and cost <br /> estimation. Public participation included website updates and stakeholder and public workshops.As GIS Specialist and Environmental Scientist, <br /> authored sections of the environmental assessment, including air quality,climate,and park and open space.Also was the GIS and graphic lead for <br /> the EA effort. <br /> d. (1)TITLE AND LOCATION(City and State) See Project#2 in Section F (2)YEAR COMPLETED <br /> Pearl Harbor Naval Shipyard Dry Dock &Waterfront Production PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Facility EIS (Oahu, HI) 2019-2022 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> GIS Specialist for the United States Department of Navy(Navy)proposed to construct and operate a graving dry dock and waterfront production <br /> facility at Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility(PHNSY&IMF), including auxiliary facilities and utilities. <br /> The proposed dry dock would replace the existing Dry Dock(DD)3. PHNSY&IMF is located at Joint Base Pearl Harbor-Hickam(JBPHH), <br /> Oahu, Hawaii.AECOM,partnered with our Cardno-Stantec JV partners and numerous subconsultants to analyze,evaluate,and prepare the <br /> Environmental Impact Statement for this critical Navy infrastructure project. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021)PART I -PAGE E-15 <br />