Laserfiche WebLink
AECOM I County of Hawaii,Planning Department,Fiscal Year 2024 <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME �,. 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> A.TOTAL B.WITH CURRENT FIRM <br /> Martin Nakasone, PE Principal in Charge <br /> 34 23 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> AECOM Technical Services, Inc.(Honolulu, Hawaii) <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> BS,Civil Engineering, University of Hawaii, Manoa Professional Engineer,#PE-8701 (Hawaii, Civil), Exp.04/30/2024 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.) <br /> Martin Nakasone is a Vice President and Area Manager for AECOM Hawaii-Pacific Islands. He oversees day-to-day operations and a staff of <br /> over 200 professionals. Previously, Martin provided leadership and oversight for the Transportation Business Line to include planning and design <br /> for aviation, roadway, highways,and marine transportation projects. Martin previously led AECOM's facility design practice for the region. His <br /> experience spans project and program management,facilities programming, master planning,charrettes,design,building site development, <br /> oversight,and quality control of projects for government and private sector clients in the Pacific. <br /> Organizations-Member of the American Society of Civil Engineers <br /> II 19.RELEVANT PROJECTS <br /> a. (1)TITLE AND LOCATION(City and State) See Project#9 in Section F (2)YEAR COMPLETED <br /> CCH, DES, Blaisdell Center Master Plan PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Honolulu, HI) 2018 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Principal in Charge of the$4,190,469 project that involved the development of a conceptual plan for the 22-acre site in Honolulu.The master plan <br /> utilized work done under an earlier feasibility study as a foundation in which to prepare detailed concepts of the overall site(landscape,circulation, <br /> pick-up/drop-off,etc.),renovated Concert Hall and Arena,and new Exhibition Hall, Performance Hall, Sports Pavilion,and Parking Garage. Fifteen <br /> technical studies were also performed during this phase of the project to further investigate site and building conditions,sustainable design strategies, <br /> traffic impacts,retail demand,and cost estimation. Public participation included website updates and stakeholder and public workshops.AECOM is <br /> currently performing design work for the schematic design of the center.As Principal in Charge,oversaw client relations,personnel,and budgeting for the <br /> project. <br /> b. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> State DLNR, Engineering Division, Kawaihae Small Boat Harbor PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Improvements, Phase 1 /Roadway and Waterline, Phase 2 2017 2017 <br /> (Waimea, HI) <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Principal in Charge of the two-phase project.The first phase of the project,which was completed in 2014, involved the preparation of plans, <br /> specification,cost estimates,and bid proposal for boat ramp with an ADA access ramp,floating dock,potable overland water line,comfort station <br /> with an individual wastewater system,with a and docking area,and various fencing,signage,grading,and drainage.Additional work included a <br /> coral study and investigation; marine surveys;and the redesign of the boat ramp and loading,accessible ramp,floating dock,washdown area,and <br /> individual wastewater system,which was upgraded from anaerobic to aerobic as required by the SMA permit.The second phase of the project <br /> includes the design of a new 24-foot-wide improved-access roadway that follows the existing alignment of a coral access road leading to the <br /> Kawaihae Small Boat Harbor(SBH)South on Hawaii island,as well as the addition of two waterlines that will be added and connected to an existing <br /> 12 inch-wide waterline along Akoni Pule Highway.The waterlines would run contiguous to the new improved-access roadway from a water main <br /> connection near Akoni Pule Highway to the existing SBH site. <br /> c. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> NAVFAC Pacific, Program/Design Management Services for PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Defense Policy Review Initiative(DPRI)Projects and Associated Ongoing <br /> Projects(Various Locations throughout the Pacific) <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Program Design Manager of the$100 million indefinite delivery/indefinite quantity(IDIQ)contract.As Program Design Manager,worked closely <br /> with the Guam Program Management Office(GPMO),partnering with all business lines at NAVFAC Pacific,from the environmental documentation <br /> and planning stages with EV and AM,through design under Capital Improvements(CI)and in coordination with Public Works(PW). Involved with all <br /> design task order negotiations under this contract. Responsible for the scheduling,cost management and overall execution of these task orders. <br /> These task orders include landfill investigation studies,topographic and controls stakeout,activity and regional level DD1391s for facilities and <br /> infrastructure build-up, utility and storm drainage studies,pesticide and hazardous materials surveys,and the development of several design-build <br /> RFP documents. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021)PART I -PAGE E-1 <br />