My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005616 06.29.23 JACOBS CAT PL.4, PL.5, PL.8
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.05 - Environmental- EA, EIS
>
PL-INT-2023-005616 06.29.23 JACOBS CAT PL.4, PL.5, PL.8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2023 1:44:27 PM
Creation date
8/29/2023 9:30:59 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/29/2023
Permit Number
PL-INT-2023-005616
Description
JACOBS, PROFESSIONAL SERVICES FOR CAT PL.4, PL.5, PL.8
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNTY OF HAWAII I PL.4)COMMUNITY PLANNING(COMMUNITY/REGIONAL PLANS,GENERAL PLAN,CLIMATE ADAPTATION) <br /> Mauna Lani Sewage Pump Station la(SPS1a)Upgrades,Hawaii American Water, <br /> Mauna Lani Resort,Waikaloa,HI Ongoing <br /> d. Project Manager. Leading multidiscipline engineering team in preparation of basis of design,detailed design,specifications, <br /> and drawings for bidding and permitting. Project consists of upgrades to the existing pump station with new submersible <br /> pumps,new standby generator and exterior fuel tank,improvements to the structure,modifications to the electrical systems, <br /> replacement of existing sanitary plumbing and potable water systems,and modifications to the facility to comply with NFPA <br /> 820 requirements for improved safety,operations,and reliability. <br /> Mauna Lani Force Main 1A Replacement,Hawaii American Water,Mauna Lani Resort, <br /> Waikaloa, HI Ongoing <br /> Project Manager. Leading engineering team in preparation of planning phase alternatives study and preliminary engineering <br /> e. report for the replacement of approximately 6,000 linear feet of 16-inch ductile iron sewer force main connection Mauna Lani <br /> Sewage Pump Station 1a to Hoohano Road.Current project planning phase services consists of identifying up to four project <br /> configurations to replace the force main,meet with stakeholder groups,assess the condition of the force main,coordinator the <br /> subconsultants surveying and boundary mapping and archaeology literature review and field inspection,identify potential <br /> permits requirement to complete the project and provide budgetary construction cost estimates. Future phases include <br /> detailed design,permit preparation and services during bidding and construction. <br /> Jacobs STANDARD FORM 330(REV.7/2021)19 <br /> TRACKING#:0063f000009AVJNAA4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.