|
COUNTY OF HAWAII I PL.4)COMMUNITY PLANNING(COMMUNITY/REGIONAL PLANS,GENERAL PLAN,CLIMATE ADAPTATION)
<br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section Efor each key person.)
<br /> 14.YEARS EXPERIENCE
<br /> Eric Chen,PE Transportation/Traffic Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 7 7
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> Jacobs,Honolulu, Hawaii
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION)
<br /> BS,Civil Engineering Professional Engineer: Hawaii#19658, Exp.4/30/2024
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Eric assists with designs, plan rendering,and other tasks as needed. He has experience using MicroStation and Civil 3D to create
<br /> plans and perform studies. He also works on the design of water pipe alignment,electrical duct alignment,curb ramps,driveways,
<br /> traffic control design,and different alternatives to crosswalk placements.
<br /> 19.RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State
<br /> Honolulu Rail Transit Project,Honolulu Authority for Rapid Transportation(HART),
<br /> Honolulu,HI Ongoing Ongoing
<br /> -'ON(R'e`=cone.sl7e cot efcl AND Sorpcir RO!.r
<br /> a. Traffic Engineering Support.Assisting in environmental compliance to comply with documented mitigation measures,
<br /> decision documents for the project,permits,and all other commitments specified by the Final Environmental Impact
<br /> Statement(EIS)/Record of Decision(ROD)and Section 106 Programmatic Agreement.Assisted with taking noise readings in
<br /> the field and conducted site-specific studies of testing impacts in the day and at night.
<br /> Kamehameha Highway Wastewater Pump Station Force Main Replacement, PROFFSSIONAI SERVICES CONSTRUCTION(if applicable)
<br /> City and County of Honolulu, Honolulu,HI Ongoing
<br /> b (3)BRIEF DESCRIPTION(Brief scope,size,cost,e' ND SPECIFIC RO
<br /> Micro Station Design Support.Planning of a flow diversion system for the Kamehameha Highway WWPS in the event of
<br /> disruption of service of the primary force main.This project will address requirements of the 2010 Wastewater Consent Decree.
<br /> Preparing the environmental assessment and discretionary permit applications.
<br /> (2)YEAR COMPLETED
<br /> Honolulu Rail Transit Project,General Engineering Consultant Support(GEC III), PROFESSIONAL SERVICES CONSTRUCTION(if applicable)
<br /> Honolulu Authority for Rapid Transportation(HART), Honolulu,HI Ongoing Ongoing
<br /> Civil Engineer I Traffic Engineering Support.Jacobs was selected by HART to provide GEC support for the Honolulu Rail
<br /> Transit Project,a 20-mile elevated rail line with 21 stations.The system features modern steel-wheel-on-steel-rail technology
<br /> and fully automated(driverless) rail vehicles with the capacity to carry hundreds of passengers,with an estimated ridership of
<br /> c.
<br /> more than 115,000 weekday rider trips by the year 2030.This effort includes project scheduling,coordination and reporting,
<br /> cost estimating,and project control,interface management,environmental planning,travel demand forecasting,bus/rail
<br /> integration,station access,and modal interface,land use planning,transit-oriented design(TOD),traffic analysis,parking
<br /> study,archaeological and cultural resources,and design management services,including management of final design
<br /> contracts,review of final design submittals,system wide signage, landscape,signal,and intelligent transportation system(ITS)
<br /> operational support.
<br /> (1)LITteANDLOLA110NlCiryandState. (2)YEAR COMPLEED
<br /> PROFESSIONAL SERVICES CONSTRUCTION(if applicable)
<br /> Statewide Freight Plan,Hawaii Department of Transportation(HDOT),Statewide,HI 2020
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ®Check if project performed with current f rm
<br /> Civil Engineer.Providing MicroStation design support for the developing an intermodal statewide plan for freight movement.
<br /> d. The plan will include developing a vision for freight in Hawaii that meets the state's broader transportation vision and 10
<br /> national freight policy goals. FHWA has developed a data source called the National Performance Measurement Research Data
<br /> Set(NPMRDS)built from actual truck GPS data, providing information on truck speeds by time and date over time;the data
<br /> can be used to look at both recurrent congestion and speed variability. Developed tools to conduct quick analysis of NPMRDS
<br /> data to give a picture of truck bottlenecks(using methods developed with FHWA funding)and traffic reliability.
<br /> Jacobs STANDARD FORM 330(REV.7/2021)116
<br /> TRACKING#:0063f000009AVJNAA4
<br />
|