My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005622 06.29.23 THE LIMTIACO CONSULTING GROUP CAT PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.05 - Environmental- EA, EIS
>
PL-INT-2023-005622 06.29.23 THE LIMTIACO CONSULTING GROUP CAT PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2023 2:19:40 PM
Creation date
6/29/2023 9:15:14 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/29/2023
Permit Number
PL-INT-2023-005622
Description
THE LIMTIACO CONSULTING GROUP, PROFESSIONAL SERVICES FOR CAT PL.5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT <br /> QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER <br /> (Present as many projects as requested by the agency, or 10 projects,if not specified. <br /> Complete one Section F for each project.) 3 <br /> 21.TITLE AND LOCATION (City and State) 22.YEAR COMPLETED <br /> Pohoiki Boat Ramp Dredging of Volcanic Debris and PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Hazard Mitigation On-going <br /> Puna, Hawaii <br /> 23.PROJECT OWNER'S INFORMATION <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c.POINT OF CONTACT <br /> State of Hawaii Mr. Finn McCall, P.E. TELEPHONE NUMBER <br /> Department of Land and Natural Resources (808) 587-3250 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> Planning and Design Fee-$734,000 <br /> Scope <br /> 4,, Environmental planning and permitting, design, and public outreach <br /> services for the dredging of volcanic debris surrounding the Division <br /> of Boating and Ocean Recreation's (DOBOR) Pohoiki Boat Ramp in <br /> the Puna District. <br /> Relevant Project Elements <br /> Ni Public Outreach Ai Feasibility Study and Analysis <br /> Volcanic debris from the 2018 eruption land-locked J Permit Applications Ai Environmental Assessment <br /> the State-operated Pohoiki Boat Ramp <br /> Due to the 2018 Kilauea Lower East Rift Zone volcanic eruption, Environmental Permitting <br /> ocean access was cut off from the Puna District causing TLCG is responsible for the preparation of all necessary <br /> substantial financial hardship to the local Puna community.TLCG environmental clearances associated with the preparation, <br /> is responsible for providing community outreach, environmental assimilation, and publication of the Final Environmental <br /> planning and permitting, and design services to excavate and Assessment in accordance with HRS Chapter 343. The following <br /> dredge volcanic debris and black sand from the entrance channel permit applications and exemptions will also be obtained for this <br /> and turning basin for the Pohoiki Boat Ramp. project: <br /> ao Clean Water Act (CWA) 404 U.S. Army Corps of <br /> Public Outreach Engineers (USACE) permit <br /> TLCG will provide continuous public outreach services throughout NPDES, NOI Form C, authorizing discharges of <br /> the duration of the project with key stakeholders, including State stormwater associated with construction activities and <br /> and County elected officials, community groups, and residents. stockpiling permits <br /> Various community group meetings will be conducted and HRS 6E SHPD consultation <br /> incorporation of the group's concerns into the design will be ao Grading Permit from the County of Hawai'i <br /> analyzed and considered. <br /> Design <br /> Planning Design services include preparation of construction documents for <br /> TLCG was responsible for developing a Pre-Design Letter Report the selected alternative, project coordination, and services during <br /> with recommendations for dredging limits and depths, proposed bidding and construction. <br /> hazard mitigation for erosion control, confirmation of all required <br /> permits and agency approvals, engineering analysis, and Project Status: Final Planning Report and Preliminary Design <br /> construction cost estimate. submitted. <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. Cultural Surveys Hawai'i, Inc. Kailua, Hawai'i Archaeology <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> b. AECOS, Inc. Kane'ohe, Hawai'i Biological Reconnaissance and Water <br /> Quality Investigations <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> C. <br /> STANDARD FORM 330(REV.8/2016)PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.