Laserfiche WebLink
Contractor/Construction Manager:Waialua District Park: Index Builders and Palalo Valley District Park: <br /> Contect Engineering, Inc. <br /> Representative Project#3 <br /> Project Name:Department of Envrionmental Services,Wastewater Division—14th Floor Space Planning <br /> Owner:City and County of Honolulu <br /> Brief Description: <br /> Uchiyama Erskine Architect's(UEA's)initial services were a facility assessment of current and future space <br /> needs including an inventory of existing furniture and equipment;and providing recommendations to <br /> improve circulation,flow,storage,and the overall work environment. UEA has continued to assist the <br /> Division with its ongoing space planning to accommodate the ever changing needs of the Division including, <br /> but not limited to,allowing for additional staff workstations,repurposing existing conference rooms,and <br /> creating shared reference areas. UEA is currently engaged on renovation of their branch offices and staff <br /> room. <br /> Project Delivery Method:Design, Bid,Build <br /> Size: 10,030 sq ft <br /> Construction Cost:$3,450,000 <br /> Completion Date: In progress <br /> Contractor/Construction Manager: N/A <br /> Representative Project#4 <br /> Project Name:Master Planning,Assessment and Project Management for Expanded Healthcare Facilities on <br /> Parcel 282 <br /> Owner: Waimanalo Health Center <br /> Brief Description: <br /> To address the health care demands along the windward coast, the Waimanalo Health Center (WHC) <br /> planned,designed and constructed a new 2-story 17,000 sq ft outpatient healthcare facility. The building is <br /> located on an adjacent property near the WHC's existing campus. Uchiyama Erskine Architects (UEA) <br /> prepared a facilities assessment and a master plan for two parcels of land. EAI's services included <br /> assessment, planning, environmental assessment, conceptual design, budgeting, and solicitation of design <br /> services and preparation of the design agreement. Once the project entered the design and construction <br /> phases,UEA assisted WHC as the project manager. Some of UEA's tasks included developing the RFP to <br /> solicit construction bids,coordinating meetings,scoring of the bid proposals,short listing the bidders,project <br /> award and negotiation/authoring of the construction agreement. UEA was retained throughout the duration <br /> of construction and led the owner,architect and contractor meetings until final completion. <br /> Project Delivery Method:Design,Bid,Build <br /> Size: 17,000 sq ft <br /> Construction Cost:$13,000,000 <br /> Completion Date:2019 <br /> Contractor/Construction Manager: N/A <br /> AIA Document B305—2021.Copyright©1963,1979,1993,and 2021.All rights reserved."The American Institute of Architects,""American Institute of Architects," <br /> "AIA,"the AIA Logo,and"AIA Contract Documents"are registered trademarks of The American Institute of Architects.This document was produced at 18:03:35 ET 7 <br /> on 06/28/2023 under Order No.2114431354 which expires on 05/01/2024,is not for resale,is licensed for one-time use only,and may only be used in accordance <br /> with the AIA Contract Documents®Terms of Service,To report copyright violations,e-mail docinfo@aiacontracts.com. <br /> User Notes: (1801539631) <br />