Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE <br /> Michael M. Fujita, P.E. President a.TOTAL b.WITH CURRENT FIRM <br /> 34 34 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Wilson Okamoto Corporation, Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S., Civil Engineering, Loyola Marymount, 1988 PE-8303, Hawaii, Civil Engineering, 1994 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2023 <br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2023 <br /> Mike has more than 30 years of civil design experience. He has led multi-disciplinary teams for the planning and design of various <br /> types of projects, including residential developments, resorts/hotels, and commercial/retail buildings. Mr. Fujita has prepared <br /> engineering reports; construction documents for site;water,wastewater, roadway, drainage; cost estimates; and specifications for <br /> projects. He also provides technical advice on projects. <br /> As President, he's responsible for on-going operations and long-term business development. <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Thomas Square Improvements PROFESSIONAL SERVICES CONSTRUCTION Of applicable) <br /> Honolulu, Oahu, HI <br /> 2017-2021 2017-2021 <br /> a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Sr. Civil Engineer for the design and preparation of construction documents for the demolition, erosion control,site layout,grading, <br /> and utility plans. Improvements consisted of improving pedestrian access to the park, upgrading existing restroom facilities, <br /> restoring/improving existing fountain, and overall hardscape and landscape improvements. Scope included evaluating existing <br /> water,sewer and drainage systems,calculating demands for proposed improvements,develop alternatives and consult with various <br /> agencies. Improvements were implemented in three phases. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Daniel K. Inouye College of Pharmacy at University of Hilo PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Hilo, HI 2020 2020 <br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Technical Advisor for the design and preparation of construction documents for demolition, erosion control, site layout, grading, <br /> and utility plans. The College of Pharmacy will be a new, 2-story facility consisting of 46,000 SF and expansion of the existing at- <br /> grade parking lot. Scope also included the preparation and processing the NPDES and Grading Permits. ECC: $33 Million <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Leihano Subdivision and (lima at Leihano <br /> Kapolei, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2016 2016 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> c. Technical Advisor for the planning of a 40-acre subdivision, also referred to as Leihano mixed-use development. In addition to the <br /> subdivision,scope included the civil design services for(lima at Leihano,an assisted living facility. Scope included the development <br /> and preparation of construction drawings for water,sewer, drainage,erosion control,grading and roadway plan. The subdivision's <br /> water system consisted of over 3,000 LF of potable and non-potable irrigation waterlines including lateral connections for potable, <br /> fire, and non-potable water meters for the 17 lots. Other water system improvements included fire hydrants along the subdivision <br /> roads. ECC: $30 Million <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Marriott Vacation Resort Waikiki at 2080 Kalakaua Avenue(formerly <br /> Nike Town) PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Waikiki, HI Design—2023 Under Construction <br /> d. <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> The former Nike Town in Waikiki is proposed to be converted to a 7-story mixed-use residential timeshare with 119 units, <br /> including retail on the ground level. The site encompasses approximately 0.9 acres and is currently a 4-story commercial <br /> property. Mike provides technical assistance <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 7 <br />