Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Kathleen Chu,PE Principal-in-Charge A.TOTAL B.WITH CURRENT FIRM <br /> 31 1 <br /> 15.FIRM NAME AND LOCATION (City and State) <br /> af=Bowers+Kubota Consulting,Waipahu,HI <br /> 16.EDUCATION (Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br /> Bachelor of Science,Civil Engineering HI,Professional Engineer/Civil [#12808 (exp. 4/30/2024)] <br /> CA,Professional Engineer/Civil [#54022 (exp.12/31/2023)] <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Hawaii Council of Engineering Societies, Current Treasurer American Council of Engineering Companies of Hawaii <br /> American Society of Civil Engineers,Transportation Chair Engineering Sector Partnership, Chamber of Commerce,Women in <br /> STEM Lead <br /> 19.RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> County of Maui,Department of Public Works PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Waiale Road Extension Project Ongoing N/A <br /> Waikapu,Maui,Hawaii <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> ROLE: Project Manager <br /> a. SCOPE: Project manager providing the County of Maui cradle to grave services,from planning through construction,on <br /> the Waiale Road Extension project.The roadway improvements will include a single span bridge over Waikapu Stream, <br /> roundabout intersections,two through lanes,shoulder bikeways,pedestrian sidewalks,a shared-use path,and two parallel <br /> grassy swales,which will serve as a permanent stormwater best management practice (BMP).The project team conduct agency <br /> and public coordination,both to seek input and provide information relating to the environmental and design related tasks. <br /> The environmental documentation for the improvement project will be prepared as a joint NEPA/HRS 343 environmental <br /> assessment.The construction bid documents will include construction plans,specifications,engineer's estimate,and permits <br /> PROJECT COST: $3,800,000 <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> State of Hawaii,Department of Transportation PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Highways Route 50 (Kaumualii Highway) Feasibility Study-Hanapepe <br /> to Kekaha Ongoing N/A <br /> Kekaha,Kauai,HI <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> b ROLE:Project Manager <br /> SCOPE: Conduct a Feasibility Study to explore conceptual details,constraints,and prospective timelines for different resiliency <br /> improvement alternatives based on probable future scenarios of concern for Route 50, Kaumualii Highway,from Hanapepe to <br /> Kekaha.The objectives of the Feasibility Study are to explore resiliency realities,criticalities,and challenges for the Route 50 <br /> study area. The scope of work will include coastal modeling of tidal flood frequency analysis and high-resolution sea level rise <br /> and wave inundation modeling.The modeling will be conducted for a variety of future sea level rise scenarios combined with <br /> different wave events to help estimate the frequency of occurrence of flooding at selected intervals in the future. <br /> PROJECT COST: $675,000 <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> State of Hawaii,Department of Transportation,Highways PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Vulnerable Road User Safety Assessment (VRUSA) <br /> Statewide,HI Ongoing Ongoing <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> ROLE:Project Manager <br /> c. SCOPE:Working with the HDOT to develop the State's first Vulnerable Road User Safety Assessment(VRUSA).A VRUSA is <br /> an assessment of the safety performance of a State with respect to vulnerable road users and the plan for the State to improve the <br /> safety of vulnerable road users.Addressing the safety of vulnerable road users through a collaborative and comprehensive approach <br /> allows people that walk,bike,and roll full and safe access to our transportation system.The assessment will include the Safe System <br /> Approach,which aims to improve safety culture,increase collaboration across all stakeholders,and refocus transportation system <br /> design and operation on anticipating human mistakes and lessening impact forces to reduce crash severity and save lives. <br /> PROJECT COST: $575,000 <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Hawaii Community Foundation PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Affordable and Workforce Housing Regional Plans 2023 N/A <br /> Island of Maui, Hawaii <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> ROLE: Project Manager <br /> d SCOPE: B+K is creating three regional plans for the Central, South and West Maui regions.These plans highlight the need for <br /> affordable housing and infrastructure that would support those projects as part of the House Maui Initiative.The House Maui <br /> Initiative supports the planning and delivery of much needed affordable and workforce housing while building on the County <br /> of Maui's community-based planning process. As part of the effort,the B+K team explored where regional infrastructure can <br /> support and serve as a catalyst for affordable and workforce housing projects.Last year,the B+K team helped the County get <br /> additional funding for the Waiale Road Extension project,as a recipient of$25 M through the RAISE grant.Through a public <br /> private partnership with the neighboring developer,200 additional affordable homes will be built. <br /> PROJECT COST: $52,453 <br /> STANDARD FORM 330(7/2021)Page 3 <br />