|
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED
<br /> Jodie C.A.Tsubone,P.E. Civil Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 11 8
<br /> 14.FIRM NAME AND LOCATION(City and State)
<br /> Element Environmental,LLC,Aiea,Hawaii
<br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S., Civil Engineering, University of Hawaii at Manoa • Professional Engineer, Hawaii- Civil No. 17048
<br /> • Certified Asbestos Inspector, HIASB-4629
<br /> • Certified Lead Inspector, PB-1151
<br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> • OSHA Initial HAZWOPER Training, 40-HR • Erosion and Sediment Control Plan Coordinator (ESCP)
<br /> • OSHA Refresher Training, 8-HR • Maritime Security Awareness Training(MARSEC)
<br /> • OSHA Construction Safety and Health Training, 30-HR • Bloodborne Pathogens, First Aid, CPR, and AED Training
<br /> • Construction Safety Hazard Awareness Training for
<br /> Contractors, 40-HR
<br /> 18. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Lead in Drinking Water Testing at Priority Areas JBPHH PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> and Naval Computer and Telecommunications Area 2020 -
<br /> Master Station Pacific JBPHH and NCTAMS Pacific,
<br /> Wahiawa, Oahu,Hawaii
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Conducted drinking water testing for lead as a protective measure at several priority areas and various schools
<br /> a. and childcare facilities on Navy Installations. Quick turnaround times were required for sampling, laboratory
<br /> analysis, and notifications. Initial site investigations were conducted to develop a comprehensive two-step
<br /> sampling plan, in accordance with updated Navy directives and EPA guidance. Field work involved multiple
<br /> visits to each facility to prepare and sample over 700 drinking water outlets, conducted during evenings and
<br /> weekends to minimize the impact on facility operations. Upon completion of the two-step sampling process,
<br /> corrective actions were immediately developed and provided to the Navy. A Project Summary Report
<br /> documented the work and findings.Fee: $99,595. Role: Assistant Project Manager/Lead Civil Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Reconstruction/Replacement of Sewers,Ho'omaluhia PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Botanical Gardens,Kaneohe, Oahu,Hawaii Ongoing -
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Completed planning, design, and preparation of construction documents for the reconstruction/replacement of
<br /> b' existing sewer lines. Phase I included the cleaning and inspection of CCTV in accordance with the Pipeline
<br /> Assessment Certification Program. Phase II assessed the sewer line deficiencies from the CCTV data, developed
<br /> rehabilitation/replacement alternatives for the system, prepared schematics, and concept drawings for the
<br /> recommended alternatives, and prepared a cost estimate for the recommended improvements. E2 is preparing
<br /> construction documents for phase III. Fee: $165,350. Role: Assistant Project Manager/Civil Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Ozone-Depleting Substances (ODS) Inventory and PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Management Plan for Naval Air Facility Atsugi (NAFA), 2017 2018
<br /> Atsugi,Japan
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> c. E2 updated the air source inventory to include all ODS containing units regulated or potentially regulated by the
<br /> Japan Environmental Governing Standard (JEGS) and air emission sources (except ODS) that are regulated by
<br /> the JEGS. Field work for the project included verification of over 2,400 refrigerant and air emission sources at
<br /> over 160 facilities. Responsibilities included: preparation of the Work Plan, completion of field inspections,
<br /> preparation of the updated database inventory, and quality assurance review of the updated Refrigerant
<br /> Management Plan. Fee: $199,000.Role: Civil Engineer.
<br /> COUNTY OF HAWAII-FY24- PAGE 13
<br />
|