My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005631 06.30.23 ENPRO ENVIRONMENTAL CAT PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.05 - Environmental- EA, EIS
>
PL-INT-2023-005631 06.30.23 ENPRO ENVIRONMENTAL CAT PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2023 3:18:00 PM
Creation date
7/5/2023 10:54:24 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/30/2023
Permit Number
PL-INT-2023-005631
Description
ENPRO ENVIRONMENTAL, PROFESSIONAL SERVICES FOR CAT PL.5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resumes of Key Personnel <br /> Name: Michael Hartman I Role in Service Category: Project Manager <br /> Years'Experience <br /> Firm Name and Location:Kailua,Hawaii Total: 19 Firm: 1 <br /> Education:.B.S. Environmental Science and Technology, '20 <br /> Current Professional Registration:Asbestos Building Inspector (HIASB-5246) <br /> Other Professional Qualifications: Environmental Professional <br /> Relevant Projects <br /> Title and Location: Pa'ala'a Phase I and Phase II Year Completed <br /> Professional Services: 2023 I Construction: Ongoing <br /> Brief Description:Mr.Hartman led over a 3,000-acre Phase I ESA,utilizing drones in an area with limited information.Multiple <br /> A RECs identified including waste piles, hazardous materials dumping, and improper disposal of equipment. Included <br /> coordination of multiple entities, breaking down the large parcel into areas of interest based off historical documentation, <br /> interviews,and site recon. Phase II sampling identified 3 areas for remediation. Project is on-going. <br /> N Check if completed with current firm <br /> Title and Location: Savio Ponds Phase I and Phase II Year Completed <br /> Professional Services: 2023 I Construction:2023 <br /> Brief Description: Mr. Hartman led large parcel agricultural Phase I ESA. No property use change proposed. Two RECs <br /> B identified. Retention ponds are suspected as possible accumulation areas for pesticides, metals, and petroleum hydrocarbons. <br /> Phase 2 sampling conducted,incorporating multi-increment sampling procedures. Results of Phase II investigation pending. <br /> N Check if completed with current firm <br /> Title and Location: Moowaa Phase 1 Year Completed <br /> Professional Services: 2023 I Construction:2023 <br /> Brief Description: : Mr. Hartman led a Phase I ESA of former auto repair and printing operation dating back to the 1960's. <br /> C Multiple RECs were identified,including an oil-water separator, significant staining,wastewater practices and adjacent leaking <br /> underground storage tanks (USTs). Phase II investigation pending. <br /> N Check if completed with current firm <br /> Title and Location: Mokauea Phase 1 Year Completed <br /> Professional Services:2023 I Construction:2023 <br /> Brief Description: Mr. Hartman led Phase I with significant soil staining from landscaping business. Investigation required <br /> D additional EPA file review for Brownfields site improperly plotted. Involved heavy client relations to educate on data gaps, <br /> brownfields, and a variety of options to address them.Addendum issued which removed one data gap. <br /> N Check if completed with current firm <br /> ENPRO Environmental Statement of Qualifications 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.