My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005631 06.30.23 ENPRO ENVIRONMENTAL CAT PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.05 - Environmental- EA, EIS
>
PL-INT-2023-005631 06.30.23 ENPRO ENVIRONMENTAL CAT PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2023 3:18:00 PM
Creation date
7/5/2023 10:54:24 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/30/2023
Permit Number
PL-INT-2023-005631
Description
ENPRO ENVIRONMENTAL, PROFESSIONAL SERVICES FOR CAT PL.5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resumes of Key Personnel <br /> Name:Anthony Barro Role in Service Category: Field Team Leader <br /> Years'Experience <br /> Firm Name and Location: ENPRO Environmental—Kailua,Hawaii Total: 8 Firm: 3 <br /> Education:B.S. Global Environmental Science, '20. <br /> Current Professional Registration: Hawaii State Lead Risk Assessor (PB-1278); Hawaii State Asbestos Building Inspector, Project <br /> Monitor,Project Designer,and Management Planner(HIASB-5068). <br /> Other Professional Qualifications:40-hour HAZWOPER <br /> Relevant Projects <br /> Title and Location: CCUR, Lead Air Monitoring and Soil Year Completed <br /> Characterization/Remediation, Commuter Rail Project, <br /> Honolulu,Hawaii Professional Services: 2023 Construction: Ongoing <br /> A Brief Description: As a field team leader,Mr.Barro directed the air monitoring and removal of lead-contaminated soils during <br /> utility relocation for the commuter rail project in downtown Honolulu. He was responsible for managing a team of <br /> environmental personnel and contractor regulatory environmental compliance documentation. <br /> N Check if completed with current firm <br /> Title and Location:Asbestos Survey,Asbestos Air Year Completed <br /> Monitoring,and Soil Remediation Oversight,Atherton <br /> House and YMCA,Honolulu,Hawaii: Professional Services: 2022 Construction: Ongoing <br /> Brief Description:Mr.Barro conducted follow-up asbestos inspections as additional portions of the buildings became accessible, <br /> B provided asbestos air monitoing and clearance sampling during abatement. He conducted soil characterization in accordance <br /> with the State of Hawaii Technical Guidance Manual, and oversaw the remediation of lead, petroleum, and pesticide- <br /> contaminated soil. <br /> N Check if completed with current firm <br /> Title and Location: Hazardous Materials Survey and Soil Year Completed <br /> Remediation Oversight,Kaimuki Gateway,Honolulu,Hawaii Professional Services: 2021-2022 Construction: 2023 <br /> Brief Description: Mr.Barro performed soil sampling and directed and documented the removal and disposal of pesticide and <br /> C aresenic-contaminated soil during this re-development of an entire city block in a suburb of Honolulu. The project included <br /> demolition of all on-site structures,including assessment and abatement of asbestos containing materials. This site received a <br /> very positive review in official State of Hawaii Department of Health correspondence. Mr. Barro was instrumental in the <br /> successful closure of this project. NCheck if completed with current firm <br /> Title and Location: Lead Air Monitoring and Abatement Year Completed <br /> Oversight,FAA South Kauai,Lihue,Hawaii Professional Services: 2022 Construction: 2022 <br /> Brief Description: Mr. Barro was the project manager responsible for providing lead air monitoring and reporting in support <br /> D of abatement activities. Responsible for documentation and contractor oversight to ensure regulatory compliance. As project <br /> monitor, Mr. Barro had authority over engineering controls to ensure proper abatement techniques were used. Mr. Barro <br /> performed clearance sampling for all abatement containments. <br /> N Check if completed with current firm <br /> Title and Location: Contaminated Soil Management, Year Completed <br /> Princeville Golf Maintenance Facility,Princeville,Hawaii Professional Services: 2021 Construction: 2022 <br /> Brief Description: Mr.Barro was the project manager responsible for characterization of the extent of impacted soils, directing <br /> E the drill team, designing the removal action, monitoring the removal of contaminated soil, and collecting confirmation soil <br /> samples to document successful completion. <br /> N Check if completed with current firm <br /> ENPRO Environmental Statement of Qualifications 110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.